Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Strategic Underground Mine Access Design to Maximise the Net Present Value

    By P A. Grossman, J H. Rubinstein, M Brazil, K G. Sirinanda

    To date, the scheduling and access design of an underground mine have only been considered as two separate optimisation problems. First, access to the mine is designed and then the scheduling is compl

    Nov 24, 2014

  • AUSIMM
    Optimisation of Installed Mill Power Post-installation of Secondary Crushing Circuit at Northparkes Mines

    By F Kock, Y Sulianto, T Trott, B G. Putland, D Morgan

    "Northparkes installed and commissioned a secondary crushing circuit in 2010 to debottleneck the semi-autogenous grinding (SAG) mill constrained grinding circuits. Following further improvements to th

    Oct 10, 2016

  • AUSIMM
    Risk Associated with Rock Type Prediction using Simulation Techniques

    By L W. Palmer

    "Evaluating the geological risk associated with ore deposits is becoming common practice in the mining industry. While geostatistical simulation is a useful tool for evaluating this risk, the effect o

    Aug 18, 2014

  • AUSIMM
    Cyanide Measurement and Control for Complex Ores and Concentrates

    By J A. Rumball

    Measuring cyanide in the leach liquors associated with high copper and/or sulfide ores is a non-trivial exercise. It is well known that copper complexes with cyanide and reduces the amount of cyanide

    Jan 1, 2007

  • AUSIMM
    Classification and Control of Hazards in Underground Mines in Poland

    By M Malec, J Szczerbinski

    Hazards in underground mines are concomitant with the mining of mineral deposits and have their source in a minerÆs work environment. The authors of the paper have undertaken a trial classification of

    Jan 1, 1999

  • AUSIMM
    Two Transit Levels in One Tunnel Tube – An Innovation in Barcelona Metro Line 9

    By R Justa Cámara, L M. Pinillos Lorenzana

    Barcelona Metro Line 9 (Line 9) is an essential infrastructure, improving the transversal transport in Barcelona by connecting the greater part of the currently existing radial lines. The purpose of L

    Sep 17, 2014

  • AUSIMM
    Coal Seam Degasification by use of Hydraulic Fracturing in Vertical Wells Case Histories

    By Barro L

    Very large reserves of gas are contained in coal. Because of the low permeability of the coal gas flow rates are very low. Fracturing of the coal can be achieved by use of the nitrogen - foam frac

    Jan 1, 1982

  • AUSIMM
    Characterising energy efficiency of particle sorting

    By G R. Ballantyne, V Souto, K Bartram

    Particle sorting allows partially liberated minerals to be separated prior to energy intensive fine grinding. Sensors select particles for separation and air, water or mechanical ejectors are used to

    Aug 29, 2018

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Foreword (7965683f-3b26-4771-bc18-123c6df66373)

    In late 1984, Council of the Australasian Institute of Mining and Metallurgy accepted a proposal to establish a Mineral Heritage Committee. This was to be involved in matters relating to mineral he

    Jan 1, 1987

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    A guide to ground disturbance permitting and managing ESG risk

    By H Arvidson, B Spence, S Helm

    Mining is the art of disturbing ground. All phases of a mine’s life cycle from exploration to building and operating a mine, through closure, has a physical impact on the earth. There is currently inc

    Sep 18, 2023

  • AUSIMM
    Advances in Flotation Process Control at Porgera Gold Mine Using JK FrothCam Imaging Technology

    The Porgera gold mine has made significant progress with the successful installation of a JK FrothCam image analysis system. The system is used to measure and control froth velocity on the scavenger c

    Jan 1, 2003

  • AUSIMM
    Biological Column Leaching of Chalcocite Ore

    A biological column leach testwork program was undertaken on a chalcocite ore. Three tests were conducted in all, using 65 in x 100 mm columns in three sections. The tests were started with varying

    Jan 1, 1994

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Combining Multi-Camera-Data of Flotation Circuit with PCA and PLS

    By H Hy÷tyniemi

    In this paper multivariate data analysis performed on a new multi-camera system implemented to zinc flotation circuit of PyhSsalmi mine is presented. Image-analysis-based system was developed to take

    Jan 1, 2005

  • AUSIMM
    Coal Drift Construction by Tunnel Boring Machine

    By D Sibthorpe

    The employment of a tunnel boring machine (TBM) is the default delivery method for the realisation of traffic, utility and primary resource underground space worldwide, with hundreds of kilometres com

    Sep 17, 2014

  • AUSIMM
    The Petroleum Industry's Future Self-Sufficiency and Taxes- A Review

    The performance of the Australian Mining Industry over the past 10 years using key indicators of production, revenue, aftertax return investment, together with key cost elements, market changes and

    Jan 1, 1987

  • AUSIMM
    Operations of a Small Heap Leach

    The Fosterville goldfield, situated 25 km east of Bendigo, Victoria was at its peak between 1894-1910 with some 47 600 ounces produced (Figure 1). Since that time intermittent mining and tailings r

    Jan 1, 1994

  • AUSIMM
    Breakthrough in elliptical motion screen trial delivers significant performance gains

    By D Teyhan, J Kirsch

    Traditionally, most Australian iron ore mining operations have been surface-based. Processing plants were designed to handle dry ores. In recent years mining operations in the Pilbara have progressive

    Nov 8, 2021