Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Recent Operation at Harima Works

    By Kadoya H, Kondo Y

    The Harima works were established in 1964 and started operation in 1966. The initial capacity was 3500 t/month of zinc and 1500 t/month of lead. Until 1990 a lot of improvements had been made and th

    Jan 1, 1993

  • AUSIMM
    Development of Sampling and Assaying Protocols at the New Bendigo Gold Project, Victoria, Australia

    By S C. Dominy

    The Bendigo Goldfield is located in the state of Victoria, Australia, and is one of a number of quartz-reef fields that make up the greater Central Victorian Goldfield. At Bendigo gold particles are c

    Jan 1, 2005

  • AUSIMM
    A Review of ISO 5802:2001 Industrial Fans - Performance Testing In Situ

    By K J. Lownie, T Rafferty

    The in situ testing of mine ventilation fan systems has been a contentious issue for many years. Site testing was generally undertaken by adapting standards that were developed for the laboratory test

    Jul 1, 2013

  • AUSIMM
    Waste Rock Pile Construction to Lower Closure and Relinquishment Costs

    By J R. Taylor, J A. Muchan, S M. Pape, B S. Davis

    Acid and metalliferous drainage (AMD) is routinely derived from waste rock, tailings, pit wall rock, underground mine voids, heap leach pads, ore stockpiles, concentrate stockpiles and even slag piles

    Jun 28, 2016

  • AUSIMM
    The Geology of the Browns Creek Gold-Copper Skarn Deposit, Blayney, NSW

    By Wilkins C

    The Browns Creek deposit is located 8 kin west of Blayney and 220 km west of Sydney (Figure 1), at lat 33¦32'S, long 149¦10'E on the Bathurst (SI 55-8) 1:250 000 scale map sheet. The total

    Jan 1, 1997

  • AUSIMM
    Tunnelling on Northern Beaches Storage Project, Sydney, to Improve Water Quality

    By N Taylor, P Hewitt

    The Northern Beaches Storage Project (NBSP) is part of Sydney Water’s SewerFix™ Program to improve the wastewater system and protect public health and the environment. It was built by the SewerFix Wet

    Sep 17, 2014

  • AUSIMM
    Development of Strata Control at Tahmoor Mine

    By Stone I

    Tahmoor Mine is located in the southern Sydney Basin 80km south-west of Sydney and produces 1.2 MT of Bulli Coal annually. Bord and pillar methods used to date will be supplemented by a longwall sy

    Jan 1, 1986

  • AUSIMM
    Flotation machine gas characterisation – variation between different types of flotation machines

    By D Felipe, G J. Harbort

    In the past 40 years substantial changes have occurred in flotation machines. This has included increases in mechanical cell size to 630 m3 , significant changes to flotation column aeration design

    Aug 24, 2022

  • AUSIMM
    Aluminosilicate Inorganic Polymers from Waste Materials

    By D S. Perera, P Wal, D C. Southam, J L. Lowe

    The Cooperative Research Centre for Sustainable Resource Processing (CSRP) is undertaking a large research project involving partners from industry, universities and government, which aims to develop

    Jan 1, 2006

  • AUSIMM
    Dry concentration of low-grade magnetic iron ores

    By C S. Kelsey, J R. Kelly

    Australia is presently enjoying the fruits of a booming iron ore market. Expectations are that market strength will be supported in the short to medium term by increasing feedstock demands from steel

    Nov 8, 2021

  • AUSIMM
    Research on Recovery of Phosphate Minerals from the Mount Weld Deposit by Froth Flotation

    By Warren L. J

    The recovery of phosphate minerals from the Mt Weld deposit by froth flotation has been studied by many researchers. Most of the flotation experiments were carried out with a tall oil fatty acid as

    Jan 1, 1991

  • AUSIMM
    Bulk carrier vessel tracking automation – the Dalrymple Bay use case

    By W Russell, P Wighton, J Franke

    Recent advances in ruggedised industrial control system technology and architecture in combination with latest technologies in the fast-evolving 3D LiDAR sensor sector becoming available have enabled

    Nov 8, 2021

  • AUSIMM
    Influence of Bolts on Discontinuities and Yielding Rock - Conceptual Developments

    The paper highlights the conceptual developments in rock mechanics applied to quantify the effect of bolts in the stabilization of joints and yielding soft rocks. NOTATION Aa = stress change after

    Jan 1, 1992

  • AUSIMM
    The Geologic Setting of Gold Deposits in the Coromadel Volcanic Zone, New Zealand

    By Kobe HW, Balance PF, Black PM, Sporli KB, Smith IEM, Locke CA

    The Hauraki Goldfield consists of a large number of volcanic-associated epithermal gold deposits within the Coromandel Volcanic Zone (CVZ), North Island , New Zealand; it is the most accessible and mo

    Jan 1, 1990

  • AUSIMM
    Geology of the Gold Deposits of the Yanacocha District, Northern Peru

    By C E. Loayza, R M. Pinto, J G. G=mez

    The Yanacocha District is located 20 km north of the city of Cajamarca, in the Northern Andean Orogenic belt of northern Peru.Gold production may have occurred as early as Incan times (Paverd, 2000),

    Jan 1, 2004

  • AUSIMM
    Minimising cost of rheology control additives for iron ore slurries/tailings for enhancing processing performance

    By Y K. Leong

    Occasionally additives are used in the wet processing of iron ore tailings and slurries, for examples, in the thickening of tailings with flocculant to recover process water, and in the smooth pumping

    Sep 18, 2023

  • AUSIMM
    Computer Simulation Studies on the Mechanisms of Toxic Element Incorporation in Jarosite

    By A M. L Smith, W E. Dubbin, K A. Hudson-Edwards

    Jarosites (KFe3(SO4)2(OH)6) are examples of minerals that are highly effective scavengers of toxic elements, and are abundant in acid rock drainage systems, acid sulfate soils, metallurgical wastes an

    Jan 1, 2008

  • AUSIMM
    Assessment of approaches, data requirements and methodologies for estimating long-term pit lake water levels

    By H J. J Boshoff

    Pit lakes, as a final void after completing open cut mining, are in most cases unavoidable. Initial mine designs and approvals require consideration and assessment of closure objectives, legislation a

    Jul 25, 2018

  • AUSIMM
    A Critical Review of an in Situ Stress Monitoring Program

    By Boyd G. L

    Stress measurement is at the core of most stability design analyses. It is demonstrated that contrary to accepted practice, it is the field measurement, and not the calculated prediction, of stress

    Jan 1, 1995

  • AUSIMM
    Pillar Design in Bump-Prone Deep Western U.S. Coal Mines

    By Kneisley RO

    This paper presents a brief overview of current bump mechanics theories and pillar design methodologies, and relates these concepts to experiences at two mines located in a north- central Utah coal

    Jan 1, 1992