Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Mount Morgan Gold-Copper Deposit:: The 1992 PerspectiveBy Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L
The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis
Jan 1, 1993
-
Rocks are not EnoughTimes are changing for the mining industry. Civil society is demanding that miners pay more attention to the ways they impact on, and engage with, communities around their mines. Miners, in turn, are
Jan 1, 2005
-
Bacterial Oxidation - An Economic Alternative for the Treatment of Refractory Gold ConcentratesBy Budden J. R, Rhodes M. K
Bacterial oxidation technology was successfully applied in a mine site pilot plant for the treatment of refractory gold concentrates. The bacterial culture was proven capable of selectively breaking
Jan 1, 1991
-
Towards Achieving Sustainable Water Management for an Acidic Open Cut Pit at Mount Morgan, QueenslandBy T Laurencont, C Unger
The Mount Morgan minesite, located approximately 40 km SW of Rockhampton in Central Queensland, comprises 270 ha of unrehabilitated land which is the currently the major source of acid mine drainage r
Jan 1, 2003
-
Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine DesignBy Ruschitzka C
The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in
Jan 1, 1995
-
Why is Mineralogical Data Essential for Designing a Metallurgical Test Work Program for Process Selection and Design?By L Lorenzen
The selection of samples for metallurgical test work is generally focused on providing geologically representative samples. One of the major problems experienced with metallurgical test work using dri
Sep 5, 2011
-
Technical Challenges Faced With Extracting a Transverse Pillar at Mount Isa Mines, Xstrata CopperBy A Winchester, D Grant
The massive 1100 Orebody in Mount IsaÆs X41 Copper Mine has been extracted over the last 40 years form north to south utilising sublevel open stoping methods.De velopment has continually stepped ahead
Jan 1, 2005
-
Exploration and Mining on Aboriginal Land - Dispelling the MythsBy D Pearce
The 15-year long debate between the industry, Government and Aboriginal people about the rights and wrongs of Land Rights, the right of Aboriginal people to control development on their land and the
Jan 1, 1994
-
Development of a Sustainable Rehabilitation Strategy for the Management of Acid Rock Drainage at the Historic Mount Morgan Gold and Copper Mine, Central QueenslandBy T Laurencont
The Queensland Department of Natural Resources and Mines (NR&M) accepted the environmental liability for the Mount Morgan minesite in 1991. This gold and copper mine located 38 km southwest of Rockham
Jan 1, 2003
-
Reassessment of Controls on the Gold Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western Tanzania Mineralisation in the Nyankanga Deposit – Geita Gold Mines, North-Western TanzaniaBy M J. Nugus
The Geita gold mines in north-western Tanzania have produced 5 Moz of gold from an estimated endowment of 15 Moz. They are generally classified as typical Archaean orogenic banded iron formations (BIF
Aug 22, 2011
-
Present Practices And Future Trends In World Dry Bulk Handling OperationsOver a century ago the first ship designed solely for carrying a bulk cargo was launched. This vessel, the "John Bowes", with a deadweight of 660 tonnes was a single decked ship with machinery and
Jan 1, 1973
-
Project Selection and Process Development for Mining JuniorsBy L Lorenzen, H Muller
"Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th
May 24, 2012
-
Australian Participation in the Ocean Drilling Program: an Economic Geology Perspective (Australian ODP Secretariat, Department ofEarth Sciences)By Rowena C. Duckworth
The Ocean Drilling Program (ODP) is the largest international geoscience project in the world, and the state-of-the-art drill ship, the JOIDES Resolution, is permanently at sea. Each year there are s
Jan 1, 1995
-
Tropical Information System - Its Communications and ApplicationsBy Stanton G
The Department of Mapping and Surveying (DMS), the Australian Key Centre in Land Information Studies (AKCLIS), the Department of Industry Development (DID) and the State Government Computer Centre
Jan 1, 1987
-
Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety ProgramBy S Flanagan, M M. Mete, A R. Tiryaki, M Guresci
First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc
Apr 16, 2024
-
Application of Centrifuge Modelling to Assess Long-Term Brine Migration in Thick Clay Tills, Saskatchewan, CanadaBy L Cooper, J Sharma, M J. Hendry
Thick clay tills below potash mine tailings and brine ponds are important natural barriers protecting fresh water aquifers in Saskatchewan. Centrifuge modelling was applied to assess geochemical proce
Jan 1, 2003
-
Designing and Operating Backfill Systems on a South African Gold MineFor effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,
Jan 1, 1998
-
A Carpenter’s Journey through Forty Years of Underground Mining, Leaders and LeadingBy J Nixon
I have to say that my story is not too much different to many others who grew up and worked in the great mining fields like Broken Hill, Mt Isa, Rosebery, Kalgoorlie or Kambalda and any one of them co
Mar 21, 2011
-
Maximising asset value through optimal block by block decisions on marginal materialBy F Phillips, E Deucker, J Kato
It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari
Mar 15, 2021
-
Rational Sampling and Standard Deviations for Random Variables in Phase I Application of Statistical Process ControlBy W P. Breytenbach
"The phased application of statistical process control (SPC) infers that processes are classifiable as pre-SPC (or phase zero), phase I and phase II processes, with different objectives being pursued
Jul 29, 2014