Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • AUSIMM
    Using Reverse Circulation Drilling to Improve Sampling in a Complex Underground Gold Operation – An Innovative Approach to Underground Grade Control at the Sunrise Dam Mine, Western Australia

    By F Clark, J T. Carswell

    Ore definition for final stope planning is often a challenging prospect in underground (UG) gold mines which exhibit high geological and grade variability. Unlike the grade control (GC) scenario in an

    Aug 18, 2014

  • AUSIMM
    The Measurement of Rock Stress for Tunnelling

    By I Gray

    While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha

    Sep 17, 2014

  • AUSIMM
    Scientific and Technological Developments in Extractive Metallurgy - Copper and Nickel Extraction

    By Flavelle IV

    A survey is made of changes in the technical status of a number of western world copper extraction and refining operations over the past 20 years. Specific developments in pyro- and hydro-metallurgy a

    Jan 1, 1985

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    The Future for Ilmenite Beneficiation Technologies

    By R K. A Taylor

    The growth in production of beneficiated ilmenite products has been one of the most significant trends in the titanium feedstock industry over the past 30 years. In this period, the production of tita

    Jan 1, 2001

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • AUSIMM
    Geology and Discovery of the Que River and Hellyer Polymetallic Sulphide Ore Bodies Tasmania

    The Que River and Hellyer polymetallic massive sulphide ore bodies are located 3 kilometres apart in the Cambrian Mount Read volcanics of Western Tasmania. Both deposits are classic examples of the

    Jan 1, 1988

  • AUSIMM
    Influence of Distorted Blasthole Patterns on Fragmentation as well as Roughness of, and Blast Damage behind, Remaining Bench Face in Model-scale Blasting

    By P Moser, R Ivanova, F Ouchterlony

    This paper describes model-scale bench blasts on mortar blocks with distorted drill hole patterns, done in 2013–2014 at the Montanuniversitaet Leoben. The main aim of the project is to see if the frag

    Aug 24, 2015

  • AUSIMM
    Evaluation of Limestone Covers and Blends for Long-Term Acid Rock Drainage Control at the Grasberg Mine, Papua Province, Indonesia

    By J Andrina, D Richar, R Smart, A Neale

    The Grasberg is a large copper and gold open pit mine operated by PT Freeport Indonesia and located in the high equatorial mountains of Papua Province, Indonesia. The climate is alpine/sub-alpine with

    Jan 1, 2003

  • AUSIMM
    Recent Developments in Direct Mineral Assay Using Downhole Geophysics

    Robertson Diasol have developed a spectral gamma-gamma tool fully able to withstand borehole conditions. Spectral data is digitally recorded across 256 channels depending on energy levels of the photo

    Jan 1, 1990

  • AUSIMM
    Feasibility Study and Economic Evaluation for Deposit No 3 of Gol-e-Gohar Iron Ore Deposit

    By H Dehghan Jan Abadi, K Shahriar

    The iron ore district of Gol-e-Gohar (GEG) is located 60 km south-west of the city of Sirjan, in the Kerman Province of the Islamic Republic of Iran. Six exploration targets have been identified and i

    Jan 1, 2007

  • AUSIMM
    Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology Assessment

    By C Harwood, EáWestman, K Luxbacher

    Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame

    Jul 1, 2013

  • AUSIMM
    In Situ Stress Measurements Using Oriented Core

    By G Baird, M Seto

    A low-cost methodology that allows the determination of in situ stresses using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stage

    Jan 1, 2000

  • AUSIMM
    BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia

    Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a

    Jan 1, 1994

  • AUSIMM
    Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologies

    By E Amini, N Beaton

    Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre

    Nov 10, 2020

  • AUSIMM
    Rehabilitation at Strongman Mine, West Coast, New Zealand

    Coal mining ceased at Strongman Mine this year after 70 years of production. Underground mining finished in 2003 and opencast methods began in 1998. During the life of the mine, 8 million tonnes of co

    Jan 1, 2006

  • AUSIMM
    Physical and Mechanical Characterisation of Paste Backfill by Laboratory and In-Situ Testing (6467738c-7044-43a0-9a73-ca12bdc18202)

    By Bidwell TJ, Servant S

    Paste back-fill technology is gaining rapid acceptance in the Canadian mining industry. The authors were able to work on four different mining sites employing paste technology in their operation. In

    Jan 1, 1998

  • AUSIMM
    Recent improvements in the milling circuit at Tropicana mine

    By G R. Ballantyne, B Putland, I Lovatt, M Di Trento

    The Tropicana Gold Mine, owned by AngloGold Ashanti Australia Ltd (70% owned and managed) and Independence Group NL (30%) is located 330 kilometres east-northeast of Kalgoorlie, Australia, in the newl

    Sep 11, 2017