Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Thermodynamics of Zinc Oxide in Iron Silicate SlagsBy Lee H. G, Li H, Hayes P
Slag from the smelting of lead can contain up to 20 per cent zinc as an oxide. An understanding of the lead smelting process and of the subsequent fuming process for the recovery of zinc is enhanced
Jan 1, 1993
-
Firedamp Drainage InstallationsFiredamp drainage has become an essential part of many mine environmental systems, and new applications are arising. Installations are evolving further to satisfy ever changing basic requirements,
Jan 1, 1982
-
No. 3 Shaft Winders and Winder HouseThe sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were
Jan 1, 1957
-
Production Drill and Blast Practices at Ridgeway Gold MineNewcrest Mining Limited (NML) owns and manages the Ridgeway Gold Mine (RGM) located outside Orange in the state of New South Wales. RGM is a new underground sublevel caving (SLC) operation that is ram
Jan 1, 2002
-
Characterising Cobalt Losses for Improved RecoveriesBy I Lumsdaine
QNI Pty Ltd operates the Yabulu Refinery located 25 kilometres north of Townsville, North Queensland. The plant treats nickel laterite ores sourced from the Philippines, Indonesia and New Caledonia. T
Jan 1, 2002
-
Black Rock Cave (BRC) – overcoming challenging ground conditions and mitigating the impacts to productionBy H Wright
Black Rock Cave (BRC) is a sublevel cave which was developed in 2018–2020 and has been in production since November 2020. BRC is part of the Mount Isa Mines complex and extracts a leached orebody comp
Mar 29, 2023
-
Defining Sustainability Criteria in Project Design - A Case Study of the Olympic Dam ExpansionBy H Bateman, I Cawrse, G Carnes, S Cawrse
In developing mineral resources, the focus typically centres on the management of identified social and environmental impacts and compliance with regulatory requirements. However, opportunities to pro
Jan 1, 2009
-
Collaboration and change management, keys to successful automation implementationBy D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Removal of Bismuth from Copper by Vacuum RefiningBy Pollard DM, Willis GM
The removal of bismuth from liquid copper in a vacuum furnace was studied over a range of pressures. The rate determining step changes from diffusion in the gas at pressures above 0.2 Torr to appr
Jan 1, 1980
-
Concentrating Practice of the Broken Hill South Limited, Broken Hill, New South Wales, AustraliaBy Read T. A
THE Broken Hill South Ltd. is one of ten companies operating on the Broken Hill lode (See Fig. 1). It has two leases-Blocks 7 and 8-of a total length of 2250 ft. on strike of lode.From the surface to
Jan 1, 1921
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Dealing with uncertainties on mining equipment fleet planning and usageBy I R. Souza
At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro
Nov 8, 2021
-
Risk assessment of iron mineral resources using conditional simulationsBy W Patton
Investment decisions in the mineral resources sector are made on the basis of an assessment of the economic potential for a mineral deposit. Given the supporting information for the location, scale, a
May 24, 2023
-
In-Pit Crushing and ConveyingBy I Lourel
In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t
Jan 1, 2009
-
Closure Planning Lessons Learnt from the Century MineBy J Crosbie, M Lord, R Bitencourt, P Defferrard
The MMG Century mine, which is the largest zinc/lead mine in Australia, began operating in 1999 and ceased mining from the open pit in July 2015, with processing completed in early 2016. Closure plans
Jun 22, 2016
-
Maximising the value of a drilling program – case study in a challenging environmentBy A A. Latscha, D O’Connor
Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO
May 24, 2023
-
Cost-Effective Dry Screening, Dewatering and Water TreatmentBy R Norris, M Dunne
Mining and mineral processing is expected by society and obliged by law to operate in an environmentally friendly fashion, minimising the impact on and avoiding damage to the environment. Substantial
Jan 1, 2006
-
An Integrated Technology Solution for Optimised and Environmentally-controlled BlastsBy C Parihar, R Garg, A Bhandari, S Bhandari
Blasting can impact the efficiency of entire downstream mining operation. Individual technology solutions for blasting have been available in the industry for many years but all of them only cater for
Aug 24, 2015
-
Tailings Dewatering, Dry Screening and Water Clarification for Reduced Water UsageBy R Norris, M Dunne
Substantial efforts by the industry, as well as by process and equipment designers, have resulted in many innovative developments that provide cost effective reductions in water usage. This paper show
Jan 1, 2006
-
Global Lessons for a Local Problem – Rehabilitation Bonds and Victoria’s Latrobe Valley CoalminesBy M L. Cramer, N P. Wines
"On 9 February 2014, bushfire embers landing on exposed coal in a disused pit at the Hazelwood mine in Victoria’s Latrobe Valley ignited a coal fire that burned for 45 days. The fire was the largest a
Jun 28, 2016