Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Environmental Impact Assessment For A Silica Sand Quarry In A New South Wales Coastal Recreation Reserve

    By Longworth C. R

    Competing requirements for land usage sometimes make the correct all- ocation difficult. The decision can be complicated by many factors such as local resident pressure, previous government decisio

    Jan 1, 1976

  • AUSIMM
    Prediction of Subsidence Due to Longwall Mining at West Cliff Colliery

    By Shu DM, Moxon P

    Subsidence profiles over longwalls at West Cliff Colliery (WCC) are predicted by three methods, NCB Emperical Method, Salustowicz's Profile Functions and Superposition of Two Critical Profile

    Jan 1, 1986

  • AUSIMM
    Results of Radiometric Surveys in the Alligator River and Cobourg Peninsula Area of the Northern Territory

    The Bureau of Mineral Resources has been engaged in regional geological and geophysical field work in the Alligator River and Cobourg Peninsula area since 1971, following the discovery of major ura

    Jan 1, 1975

  • AUSIMM
    The Engel Model-A Simulator for Optimizing Exploration Effort

    By Rowlands N. J, Zimmermann D. O

    The Engel Model search simulator is described with particular emphasis on preparation of input parameters. The computer has a "black box" role in the same way a telephone or radio is a "black box"

    Jan 1, 1974

  • AUSIMM
    Practice and Prospects for Methane Predrainage to Prevent Outbursts in Coal Mines In the Congqing Area

    Most coal mines in Chongqing Area are highly gassy mines and liable to outburst of coal cnd methane. In order to harness mine environment and raise the Prodction capacity, methane predrainage is gener

    Jan 1, 1991

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    The Planning and Methods Used at Selby in the Design of High Productivity Systems

    British Coal's Selby Complex is the newest producing mine in the United Kingdom. The reasons behind its origins, planning and design are explained. Some detail is given of equipment used, with th

    Jan 1, 1991

  • AUSIMM
    The McArthur Lead-Zinc-Silver Deposit, N.T.

    The McArthur lead-zinc-silver deposit is of the stratiform type. It consists essentially of a mineralized bituminous shale sequence that incorporates tuffites, numerous graded beds, and isolated but m

    Jan 1, 1972

  • AUSIMM
    An economic approach to optimising mill reline frequency – a case study of SAG mill relines at Rasp mine

    By C M. Standen

    The SAG mill at Rasp Mine has undergone a number of liner design modifications since commissioning in 2012, making liner wear and failure difficult to predict from historical data. During 2017, severa

    Aug 29, 2018

  • AUSIMM
    The Composition of the Peko Copper Orebody, Tennant Creek

    The Peko copper orebody is associated with a body of magnetite rock which it has partly replaced. The primary ore averages about 9 per cent. copper and 4 dwt. gold per ton and locally IS much richer.

    Jan 1, 1955

  • AUSIMM
    Applications of Exhaust Steam Turbines to The Power Plants of Mines.

    The cost of power is an important matter to mining companies generally and this thought that the members of the Australasian Institute of Mining Engineers, as well as the engineering and mining profes

    Jan 1, 1911

  • AUSIMM
    Steel Wire

    The man in the street (and no doubt most members of the Institute) thinks of wire, if he gives it any thought at all, as a most commonplace commodity. It is an accepted necessity, and like most necess

    Jan 1, 1947

  • AUSIMM
    Rock Excavation by Machine - A Comparative Study of Picks and Discs

    One of the responsibilities of the Melbourne and Metropolitan Board of Works is to provide a sewerage system for the metropolis of Melbourne which now contains over 2.5 million people. In providing

    Jan 1, 1976

  • AUSIMM
    The Broken Hill Proprietary Company Limited (Iron and Steel Works)

    By Kirkhouse C. B

    Soon after the Broken Hill Limited started operations at their Iron and Steel Works at Newcastle, NSW, it was found necessary to install a mill for rolling small merchant bars, rounds, etc.An arrangem

    Jan 1, 1935

  • AUSIMM
    Supervisory Control of Bass Strait Oil and Gas Production

    Esso-BHP have installed a Production Supervisory Control System that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station

    Jan 1, 1970

  • AUSIMM
    Integration of Geoblast and D&B Engineering as an engineering tool in PT. Indo Muro Kencana

    By H Utama, hi, A Suw

    PT. Indo Muro Kencana (PT.IMK) is gold and silver mine located in Central Kalimantan province, Indonesia. Mining activities in PT.IMK is conducted in Bantian pit area by applying surface mining method

    Nov 29, 2022

  • AUSIMM
    The Design, Construction and Operation of the Boddington Gold Mine Supergene-Basement Plant

    By Hill G

    The Boddington Gold Mine (BGM) is managed by Worsley Alumina Pty Ltd (Worsley) and is located 110 km south-east of Perth, Western Australia. The gold mine, which has operated since mid-1987, was origi

    Jan 1, 1992

  • AUSIMM
    Increasing Production Control Through Reliable Geological Predictive Techniques

    By English W, Poppit I

    COALEX Pry Limited operates two underground steaming coal mines on the western edge of the Sydney Basin near Lithgow, New South Wales. Baal Bone Colliery uses longwall technology for an output of over

    Jan 1, 1991

  • AUSIMM
    Engineering Alternatives for Improved Shaft Sinking Project Payback

    Designing for early access to deep orebodies is an essential driver for improved project payback. Vertical shaft sinking techniques have been developed to allow concurrent mine level excavation while

    Jan 1, 2005