Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fluid Inclusion and Isotopic Constraints on the Mineralisation of the Shagou Ag-Pb-Zn Deposit, Henan Province, ChinaBy J-S Han, J-M Yao
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Shagou deposit is located along NE-trending faults within the high-grade metamorphic ba
Mar 18, 2015
-
Analytical Fingerprint of Columbite-Tantalite (Coltan) Mineralisation in Pegmatites - Focus on AfricaBy A Gerdes, H BrStz, E GSbler, D Davis, F Henjes-Kunst, S Dewaele, T Graupner, T Oberthnr, M Sitnikova
Following the United Nations initiative to fingerprint the origin of conflict materials, the German Federal Ministry for Economic Cooperation and Development has decided to fund a pilot study on colta
Jan 1, 2008
-
Leachwell Versus Fire Assay: Comments from Assay Quality Assurance at Tarmoola Gold MineA fundamental component of grade control at Tarmoola Mine has been the monitoring of assaying through quality assurance programs. The programs have concentrated on issues related to accuracy and preci
Jan 1, 2000
-
The Tectonics, Geology and Gold-copper Metallogeny of New GuineaBy S L. Garwin
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Since the Eocene, New Guinea tectonics have been driven largely by the south-westerly-direc
Mar 18, 2015
-
Theory of Sampling and geostatistics for twin drill holes analysis in a niobium mine in Araxá, BrazilBy T M. El Hajj, A C. Chieregati, M T. G C Marques, J M. Braga Jr, H Delboni Jr
"The estimate and control of sampling errors is essential for all mining operations, especially when dealing with strategic materials, such as niobium. This paper is based on a traditional quality ass
May 9, 2017
-
CrusherMapperTM - A New Tool for Crusher Condition MonitoringCrusherMapperTM - A New Tool for Crusher Condition Monitoring The efficiency of mineral processing plants is entirely dependent on the availability of the plant equipment critical path. This typicall
Sep 13, 2010
-
Discrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation ConditionsDiscrete Element Method - Computational Fluid Dynamics Modelling of Flow Behaviour in a Stirred Mill - Effect of Operation Conditions
Sep 13, 2010
-
Drying and Roasting of Zinc Concentrate at Zeehan Works of Electrolytic Zinc Company of Australasia LtdZINC concentrate, produced at Zeehan by flotation from Read Rosebery ore, is also dried and roasted at the same place for the production of a calcine suitable for use in the electrolytic zinc process
Jan 1, 1927
-
A Team Approach to Optimising a Mining Method - Bench Stoping in the Silver/Lead/Zinc Orebodies at Mount IsaBy Jarc H
The steeply dipping silver/lead/zinc orebodies at Mount Isa mine have been extracted most recently by a combination of cut-and-fill and open stoping methods. Bench stoping was first used at Mount Isa
Jan 1, 1992
-
Seafield ResourcesÆ Offshore Alluvial Gold Project, Westland, New ZealandBy N F. Fraser
Seafield ResourcesÆ offshore placer gold project covers c.10 000 km2 of the Westland continental shelf between Karamea and Jacksons Head, from the low-water mark out to the 120 m isobath (Figure 1). D
Jan 1, 2005
-
Geochemical Studies in the Coromandel Peninsula - The Merits of Mercury in Soils as a Pathfinder for Precious Metal Mineralisation in the Thames-Waihi AreaThe mercury, gold, silver, copper, lead and zinc values of soils over altered and mineralised rock were determined to establish the potential use of mercury as an indicator element in geochemical pros
Jan 1, 1979
-
The Sealing , Re-Opening, and Recovery of Aberdare North Colliery, N.S.W., Following the Occurrence of a Spontaneous HeatingBy Sneddon N
In November, 1975, Aberdare North colliery was sealed at the surface to extinguish an open fire underground.The fire had developed from a spontaneous heating in one of the open goaf areas of the mine.
Jan 1, 1978
-
Working in Partnership with IndustryThe Ministry of Economic Development has as its slogan æTogether making the differenceÆ. The Ministry is required to work in partnership with the private sector, local authorities, Maori economic enti
Jan 1, 2000
-
Rehabilitating Post-Mining Landscapes for Wildlife - A Case Study from the Koala Venture Research Program in Central QueenslandBy F Carrick, W A. Ellis, D R. Mulligan, S I. FitzGibbon
"One of the major environmental impacts of mining is the destruction of habitat. The koala (Phascolarctos cinereus) is an iconic Australian marsupial that has been severely affected by land clearing a
Jul 10, 2012
-
A Mechanistic Model of Batch Grinding in Ball MillsA Mechanistic Model of Batch Grinding in Ball Mills
Sep 13, 2010
-
Contrasting Epithermal Gold Mineralisation in the Northern Coromandel Volcanic Zone, New ZealandBy M R. Stevens
The Kauri Block (Hauraki Hill) andMatawai Valley epithermal vein systems, near Coromandel township, are hosted by hydrothermally altered Miocene andesites and Mesozoic greywackes of the Coromandel Vol
Jan 1, 1993
-
The Continuous Miner and its Application to Pillar ExtractionBy Monger N. R
Factors leading to the decision to use Joy Continuous Miners for pillar extraction in the Burwood Colliery are outlined. A detailed description is given of the Joy 1-CM-2 Continuous Miner, including t
Jan 1, 1957
-
-
Prospective Electric Pulse Processes for Sustainable Processing of Mineral Raw MaterialsBy V A. Tsukerman
Prospects a new energy saving method for an efficient destruction of the sturdy and hard materials (rocks, ores, frozen soils, concrete blocks, etc) û the Electric Pulse Discharge (EPD) method of mate
Jan 1, 2002
-
The George Fisher Project to Increase Recovery in the Mount Isa Lead/Zinc ConcentratorBy K S. Fisher, J D. Pease
The installation of the George Fisher flowsheet in the lead/zinc concentrator at Mount Isa Mines Limited has recently been completed. The George Fisher flowsheet involved moving flotation capacity fro
Jan 1, 2000