Search Documents

Search Again

Search Again

Sort by

  • NIOSH
    OFR-95-82 Development And Prototype Production Of A Trapped Miner Signalling Transmitter/Transceiver

    By Charles H. Simmons

    Two versions of a VF transceiver to aid in location of trapped miners has been developed and tested. The belt worn model was produced in both transmitter and transceiver configurations. In addition, a

    Jan 1, 1981

  • NIOSH
    OFR-95-92 RCRA Regulation Impact On Alaska Mineral Development - Waste Rock Management

    By M. John Brodie

    This report reviews the regulatory environment as it pertains to waste rock management and disposal from mining operations, excluding coal and placer gold operations, in the \irate of Alaska. It is ba

    Jan 1, 1992

  • NIOSH
    OFR-96(2)-78 Final Report For U.S. Bureau Of Mines - Volume II: Pilot Test Plan - 1. Introduction - 1.1 Purpose

    The purpose of Volume II of this study is to provide a general plan for the pilot testing of two materials which could be used to tag explosives for both pre- and postdetonation identification and of

    Jan 1, 1977

  • NIOSH
    OFR-96-79 Normalizing MESA-HSAC (A Mining Enforcement And Safety Administration-Health And Safety Analysis Center) Injury Data For Coal Mine Mobile Equipment Operators

    By Louis Schaffer

    This report characterizes several coal Dine mobile equipment operator populations with respect to age, mine experience, machine operator experience, and training. The information is used to demonstrat

    Jan 1, 1977

  • NIOSH
    OFR-96-86 Flywheel-Powered Shuttle Car

    By Donald Christofferson

    This report documents the program conducted to demonstrate the application of a flywheel-powered propulsion system to underground mining shuttle cars. Such application can replace the present electric

    Jan 1, 1986

  • NIOSH
    OFR-96-92 The Materials Flow Of Cobalt In The United States

    By Kim B. Shedd

    An initial evaluation of the flow of cobalt-containing materials in the United States was prepared. The following aspects of materials flow were included: cobalt released as a result of mining and pro

    Jan 1, 1992

  • NIOSH
    OFR-97(1)-75 Quick Disconnect Couplers For Trailing Cables

    Three complete connector assemblies and six separate contacts were submitted to a series of tests to establish the connectors permissibility and compliance with U. S. Bureau of Mines research Contract

    Jan 1, 1974

  • NIOSH
    OFR-97(2)-75 Report Of Qualification Test U.S. Bureau Of Mines Connector Development

    Three complete connector assemblies and ten separate contacts were submitted to a series of tests to establish the connector permissibility and compliance with the Bureau of Mines' research Contr

    Jan 1, 1972

  • NIOSH
    OFR-97(A)-82 Improved Solution Mining Production Cost Model - Introduction

    On April 1, 1982, the Bureau of Mines and the Department of Energy entered into an Interagency Agreement to develop an enhanced computer cost model for uranium in situ leach mining. The original compu

    Jan 1, 1982

  • NIOSH
    OFR-97-78 Design, Fabrication And Field Testing Of Remotely Operated Longwall Head/Tail Supports

    By Alfred Bellows

    The objective of this contract is to design, build and demonstrate a support system to improve roof control in the entries of longwall mines. The objective of this phase has been the detailed design o

    Jan 1, 1978

  • NIOSH
    OFR-97-79 Evaluation Of Roof Conditions From Bolting Machine Parameters

    By Richard W. Lusignea

    This report describes a program to evaluate the feasibility of determining roof features which occur in United States coal mines from changes in bolting machine drilling parameters. The ultimate purpo

    Jan 1, 1978

  • NIOSH
    OFR-97-82 Cost And Sensitivities Analysis For Uranium In Situ Leach Mining

    By George W. Toth

    Uranium in situ leach mining has recently emerged as a viable alternative to conventional miring techniques. The cost implications of in situ mining are therefore of increasing interest to mining para

    Jan 1, 1981

  • NIOSH
    OFR-98-75 Coal Mine Vacuum Sweeper

    A mobile vacuum sweeper to remove loose coal and coal dust from underground coal mine workings was designed, built, tested, and evaluated. The design was based on an extensive test program. Pick up

    Jan 1, 1975

  • NIOSH
    OFR-98-77 Rapid Excavation Of Rock With Small Charges Of High Explosives

    By George B. Clark

    The purpose of this investigation was to determine the feasibility of designing and testing the elements of a small charge blasting system which will eliminate, or reduce to acceptable levels, most of

    Jan 1, 1976

  • NIOSH
    OFR-98-81 Study Of Respirable Dust Outby The Working Face Of A Coal Mine

    By R. L. Rankin

    The program objective was to conduct surveys of respirable dust concentrations in coal mining operations at locations outby the working face. The results of these surveys were directed toward 1. ident

    Jan 1, 1980

  • NIOSH
    OFR-98-82 Compaction Criteria For Coal Waste Embankments

    By N. S. Shan

    This report presents the results of a study to determine compaction criteria for coal waste embankments. The purpose of this study is to evaluate the costs and resulting effects on the engineering pro

    Jan 1, 1981

  • NIOSH
    OFR-98-83 Evaluation Of Charged Walter Sprays For Dust Control

    By J. McCoy

    Charged sprays and fog have been evaluated for reducing respirable dust concen¬trations. Charged spray technology was reviewed for effectiveness, equipment and theoretical considerations. A mathematic

    Jan 1, 1983

  • NIOSH
    OFR-98A-86 Human Resource Management Skills And Coal Mine Productivity - Final Report - Volume I

    By Paul S. Goodman

    Volume I This report presents the first national survey of miners' attitudes and opinions about their-work. The goal is to present attitudinal data that bears on coal production. Interviews w

    Jan 1, 1985

  • NIOSH
    OFR-98B-86 Human Resource Management Skills And Coal Mine Productivity - Final Report - Volume II

    By Paul S. Goodman

    Volume II The purpose of this study is to explain reasons for the productivity differences in mining crews. The literature on group productivity is examined. Then a new approach to estimating prod

    Jan 1, 1985

  • NIOSH
    OFR-99-75 Study Of Worker Acceptance And Attitudes Toward Mining Equipment Modifications

    By Maurice E. Bailey

    The purpose of this study is to determine worker acceptance of modified mine equipment at various intervals during a twelve month period. A survey instrument was administered to the workers by two exp

    Jan 1, 1975