Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    Coping With High Lateral Stresses In An Underground Illinois Coal Mine (Inland Steel Coal Capany, Mine #2)

    By C. Tom Blevins

    The purpose of this paper is to discuss production and roof control problems associated with directional lateral stresses in an in situ stress field and the approach that Inland Steel Coal Company mad

    Jan 1, 1982

  • SME-ICGCM
    Remote Mining Using Water for Ground Support

    By Robert L. Schmidt

    The support of underground openings by water is a natural phenomenon. Surface sinkholes, such as those that occur with some frequency in Florida, are attributed to a lowering of the water table result

    Jan 1, 1986

  • SME-ICGCM
    Truss Bolting On-Cycle in Jane Mine Lower Freeport Seam

    By Ken Barish

    Jane Mine of the Keystone Coal Mining Corporation was started in 1962 and is in the Lower Freeport seas located in Armstrong County, Pennsylvania, approximately 45 miles northeast of Pittsburgh. The

    Jan 1, 1984

  • SME-ICGCM
    The Effectiveness Of Interpanel Pillars In The Control Of Surface Subsidence (ef7cc44b-3192-4f5f-a75c-62563d519797)

    By Laxminarayan Holla

    There exist many formulae for designing coal pillars. However, when applied to a given set of mining parameters, they lead to different pillar sizes and factors of safety. From the subsidence point of

    Jan 1, 1992

  • SME-ICGCM
    Chinese And North American High-Extraction Underground Coal Mining Strata Behavior And Water Protection Experience And Guidelines

    By Mao Bai

    Mining in situations where there exists a potential hazard from inundation has always existed in coal mining, and often reserves were left unmined in favor of reserves with no such hazard. However, in

    Jan 1, 1995

  • SME-ICGCM
    Rehabilitation of Underground Surge Bunker Following Massive Rib Wall Failure

    By Rob Robinson

    Following a massive rib wall failure along the reclaim belt of the large underground surge bunker at CONSOL?s Bailey Mine, a multifaceted, cleanup and rehabilitation effort was initiated to rapidly st

    Jan 1, 2007

  • SME-ICGCM
    Stooping Low Safety Factor Pillars at Goedehoop Colliery - 12 Months Later

    By Gift Makusha

    Pre-feasibility work at Goedehoop Colliery indicated that stooping of the undersized pillars could be undertaken safely and economically. In light of the findings a decision was taken in may 2003 to u

    Jan 1, 2004

  • SME-ICGCM
    Transversely Elasto-Plastic Analysis of Surface Subsidence Arising from Longwall Mining of Inclined Coal Seams

    By M. Afsari Nejad

    A Transversely Elasto-Plastic Model was configured in FLAC (Fact Lagrangian Analysis of Continua) as a more realistic simulation of stratified and inclined strata behaviour examining surface subsidenc

    Jan 1, 1998

  • SME-ICGCM
    Hydraulic Prestressing Units: An Innovation In Roof Support Technology (6dbf7428-5679-47b2-a60c-95193c59dbda)

    By Thomas Barczak

    A new generation of hydraulic mine support prestressing devices has been developed. These thin-walled steel shells are machine-welded and can be inflated with water or any liquid to provide prestressi

    Jan 1, 2004

  • SME-ICGCM
    Prediction And Control Of Surface Subsidence Over Abandoned Mined Lands In Carbonia (Italy)

    By Pier Paolo Manca

    The investigated area lies close to a large town and covers an area of about lkm2. The mine was worked at depths ranging from 5 to 100 meters but mining operations actually ceased some 50 years ago. T

    Jan 1, 1999

  • SME-ICGCM
    International Conference On Ground Control In Mining Design Of Three-Entry System For Super Longwall Panels

    By J. D. Cole

    In order to reduce the number of longwall face moves and to increase the rate of gateroad construction, super longwall panels, 1000 feet wide and 12000 to 14000 feet long, are planned for Wolf Creek C

    Jan 1, 1990

  • SME-ICGCM
    Comparison of Some Aspects of Bolting Mechanisms Between Fully-Grouted Resin and Tensioned Bolts in Underground Mine Entries

    By Asmaa Yassien

    Finite element models were developed to study the effect of tensioned and fully-grouted bolts on the stability of the mine opening in a three-entry development system using a typical geological column

    Jan 1, 2002

  • SME-ICGCM
    Ground and Standing Support Interaction in Tailgates of Western U.S. Longwall Mines Used in the Development of a Design Methodology Based on the Ground Reaction Curve

    By Dennis Dolinar

    "Tailgate entries in U.S. longwalls can be subjected to high loads and deformations. Therefore, tailgate entries are generally supported with varying types and amounts of standing support. However, ev

    Jan 1, 2010

  • SME-ICGCM
    Engineering Methods For The Design And Employment Of Wood Cribs

    By Thomas M. Barczak

    Wood cribs are used extensively to stabilize mine openings by providing resistance to deflections of the immediate roof and floor and by supporting the weight of unstable rock masses. While the unit c

    Jan 1, 1993

  • SME-ICGCM
    Sandy Creek Waterfall?Case Study of Successful Management of the Potential Impacts of Longwall Mining on a Sensitive Natural Surface Feature

    By Bruce K. Hebblewhite

    BHP Billiton Illawarra Coal operates Dendrobium Mine in an area 10-20km west-northwest of Wollongong in the Southern Coalfield of New South Wales, Australia. The mine recently completed longwall mini

    Jan 1, 2014

  • SME-ICGCM
    Prediction Of Rock Cutting Performance Using Fracture Mechanics Principles - A Review (0b1a12ed-9606-4d46-b68d-eea006d52e76)

    By Gexin Sun

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process of

    Jan 1, 1992

  • SME-ICGCM
    Simplified Pre-and Post-Processing Technique for Performing Finite-element Analyses of Deep Underground Mines (4c70a887-9438-4254-8d3e-3283730c59e0)

    By Marc T. Filigenzi

    Two of the major ground control safety issues confronting underground mine operations today are shaft pillar stability and the failure of rock around active mine openings. Failure of a mine shaft can

    Jan 1, 1997

  • SME-ICGCM
    Design Aspects In Multiple-Seam Mining: Case Studies

    By Gregory J. Chekan

    Developing a coal seam that has been influenced by previous mining in seams either above or below can result in severe ground control problems. In many instances, interactions between operations are i

    Jan 1, 1990

  • SME-ICGCM
    Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting Efficiency

    During the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t

    Jan 1, 1990