  • SME-ICGCM
    Prediction Of Longwall Support Loading At Southern Colliery, Queensland (a27f315c-1e91-4c85-b61a-2de1eb8e0d0f)

    Roof conditions at Southern Colliery, the second Iongwall mine to be established at German Creek, were found to be much stronger and more massive than at the earlier longwall mine on the lease. Invest

    Jan 1, 1992

  • SME-ICGCM
    Longwall Production, Maintenance, And Roof Control System

    By W. Mark Hart

    The current Automatic Data Acquisition system developed by some support manufacturers make it possible to monitor and record changes in leg pressure, DA RAM stroke in every shield and shearer position

    Jan 1, 1994

  • SME-ICGCM
    Comparison of Pillar Strengths Calculated Using Empirical Equations and Finite Elements

    By Aarao de Andrade Lima

    Mechanical properties typical of coal are used in the comparisons of pillar strengths based on finite elements and the empirical equations of Holland-Gaddy, Salamon-Munro, Obert¬Duvall, and Bieniawski

    Jan 1, 1997

  • SME-ICGCM
    Laboratory Strength Testing of Coal from Selected Illinois Seams

    By E. Bane Kroeger

    For many years, researchers around the world have been investigating coal pillar stability. Many have focused on trying to optimize the size of the pillars by examining stable and failed pillars in un

    Jan 1, 2004

  • SME-ICGCM
    Intersection Stability and Tensioned Bolting

    By Yunqing Zhang

    Roof failure occurs much more frequently at intersections than entries and crosscuts. Using a commercial finite element package, four-way and three-way intersections reinforced with the tensioned bolt

    Jan 1, 2003

  • SME-ICGCM
    Status Of Longwall Research In CSIRO

    By Michael Kelly

    Current research in longwall mining in CSIRO Exploration & Mining is focused within five major projects and several minor projects. The major projects are: 1 3D Aspects of Longwall Geomechanics. Th

    Jan 1, 2001

  • SME-ICGCM
    Roof Behavior In South African Coal Room And Pillar Panels

    By Bruce W. Jack

    An extensive underground roof-monitoring program was conducted in order to determine the roof strata behavior under various conditions. In total 29 sites at 5 different collieries were monitored using

    Jan 1, 2000

  • SME-ICGCM
    A Study Of Floor Heave In The Mines Of The Southern Coalfield Of New South Wales By Two Dimensional Finite Element Modelling

    By A. K. Bhattacharyya

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. Apar

    Jan 1, 1992

  • SME-ICGCM
    The Influence Of Horizontal Stress On Pillar Design And Mine Layout At Two Underground Limestone Mines

    By Garth Kuhnhein

    The Black River and Maysville underground limestone mines operated by Carmeuse Lime and Stone, Inc. in northeastem Kentucky are two of the largest underground limestone operations in the United States

    Jan 1, 2004

  • SME-ICGCM
    Modelling Of Pillar Stability In Room And Pillar Mines

    By Douglas Morrison

    By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o

    Jan 1, 2003

  • SME-ICGCM
    The Elimination of Rock-fall Fatalities in Ontario Hardrock Mines

    By Douglas Morrison

    Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te

    Jan 1, 2003

  • SME-ICGCM
    Crosshole Seismics: Applications In Mining

    By Richard E. Thill

    Two Cross-borehole systems were developed by the Bureau of Mines, one operating at a central frequency of 20 kHz for close-in spacing between boreholes (2-20m) and another operating at a dominant freq

    Jan 1, 1989

  • SME-ICGCM
    Numerical Analysis of the Effect of Coal Seam Characteristics on the Longwall Top Coal Cavability

    By Rudrajit Mitra, Tien Dung Le, Chengguo Zhang, Bruce Hebblewhite, Joung Oh

    "Geomechanical and geotechnical characteristics of coal seam are important parameters that directly affect the cavability of top coal in the longwall top-coal caving (LTCC) method. The impact of these

    Jan 1, 2017

  • SME-ICGCM
    Mechanism and Prevention Measure of Rib Spalling in 6.5 Meter High Caving Face in Thick Coal Seam with Undulated Floor

    By Weidong Pan, Yinchao Yang, Baodong Zuo

    Fully mechanized mining technology, with a large cutting height in thick coal seam, has been developed to be large-scale, mechanized, and intelligent. Furthermore, it is also superior to other mining

    Jan 1, 2017

  • SME-ICGCM
    Progress In The Knowledge Of Granite Cutting With Diamond Wire (bf80b832-f557-4b46-b5c9-31193e67bf2d)

    By A. Bortolussi

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contribution h

    Jan 1, 1992

  • SME-ICGCM
    Modeling the Effect of Bolts on the Behavior of Rock Pillars and Associated Insights on Rib Reinforcement

    By Gabriel Walton, Sankhaneel Sinha

    "Rib failures are a major hazard in underground mining. When pillars are subjected to loading, extensile cracks are generated parallel to the excavation boundary, which can manifest as rib falls. A co

    Jan 1, 2017

  • SME-ICGCM
    Microcirculation Theory Analysis Of Spontaneous Combustion Of Loosing Coal In The Top-Coal Caving Region Of Entry

    By Q. F. Wang

    Spontaneous combustion hazard of loose coal in the top-coal caving region of entry affects the safety of the entry and top- caving longwall face seriously. In this paper, by combining on- site tempera

    Jan 1, 2004

  • SME-ICGCM
    Study of the Behavior for Backfilling Material in Room-and-Pillar Coal Mining

    By Joao Felipe Costa, Jair C. Koppe, Andre Zingano, Cleber Gomes

    "Run-of-mine Brazilian coal has high ash content and low calorific power. Therefore, the coal must be washed to achieve the power plant specifications for burning coal. A large amount of waste results

    Jan 1, 2010

  • SME-ICGCM
    An Alternative for More Productive Rib Bolting in Underground Mining Applications

    By Joe E. Bryan, John P. McDonnell

    "Underground mine rib stability is an ongoing safety issue in all mining applications. Rib-related accidents present at least as many problems as roof-related ground control. Underground coal mine rib

    Jan 1, 2015

  • SME-ICGCM
    Determination Of Rock Strength Properties Using Geophysical And Ultrasonic Logging In Exploration Drill Holes

    By John Feddock

    This study deals with underground mines and ground control and the prediction of seats strength characteristics based upon ultrasonic logging. Exploration drill holes, both rotary and core holes are u

    Jan 1, 2003