Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    73rd Street TARP Relocation McCook Cup Reservoir: Contract 97-156-2H

    By Brent Duncan, Doug Harding, Bob Stier

    The 73rd Street Tunnel Project is part of “The Tunnel and Reservoir Plan” (TARP)also known as the Deep Tunnel Project, and is located in the Village of Bedford Park, County of McCook, State of Illinoi

    Jan 1, 2003

  • SME
    Exploration Review

    By D. R. Wilburn

    This summary of international mineral exploration activities for the year 2007 draws upon available information from industry, literature and U.S. Geological Survey (USGS) specialists. The summary pr

    Jan 1, 2008

  • SME
    High Speed Communications In Harsh Environments

    Extending an organization?s knowledge base throughout the entire enterprise can improve operations. Until recently, though, field operations were often left out of the information loop, as extending

    Jan 1, 2009

  • SME
    On The Lateral Stiffness Of Gearless Mill Bearings

    By R. L. Guerguerian

    Nowadays, most grinding mills driven by a wrap-around ring motor are operating successfully. Some of the earlier problems could be attributed to the lateral stiffness and stability of their bearings.

    Jan 1, 2000

  • SME
    Tracking Mine Safety Performance Trends To Assess The Risk For A Fatality

    By H. Kinilakodi

    The authors previously developed a methodology that combines injury and citation measures into an overall mine safety performance evaluation tool, called the safe performance index (SPI). It can be ea

    Jan 1, 2012

  • SME
    Mining Engineering – Shovel and Excavator Survey

    By Lane White

    In mid-April 1992, MINING ENGINEERING mailed a survey questionnaire relating to mining shovels and hydraulic excavators to 125 SME members working at surface mines or at the headquarters of companies

    Jan 1, 1992

  • SME
    Putting Computational Fluid Dynamics To Work On Mining And Metals Projects

    By D. M. Lane, J. M. Berkoe

    Engineers and Owners share a common desire to build reliable, efficient plants on schedule at reasonable costs. This paper describes one tool that Bechtel finds can integrate these objectives by “pu

    Jan 1, 2000

  • SME
    Study on Strata Control Based on Pillar Stress and Surface Cracks in Shallow Multi-Seam Mining

    In order to ensure safe mining and reduce surface damage in shallow multiple-seam mining, the failure characteristics of interburden strata with different coal pillar offset distances between pillars

    Jul 28, 2020

  • SME
    Problem of Tunnel Construction in Himalayan Region: An Actual Encounter

    By M. D. Khattar

    Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr

    Jan 1, 1999

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • SME
    Coal Quality And Resources In The Us Gulf Coastal Plain

    By J. C. Willett, J. R. Sanfilipo, P. D. Warwick

    The U.S. Geological Survey has conducted an assessment of the Nation’s coal deposits that potentially could be mined during the next 30 or more years. For the Gulf Coastal Plain region, the assessmen

    Jan 1, 2001

  • SME
    Dewatering for the Lenox Avenue Subway Reconstruction Project

    By Paul C. Schmall, Thomas Tuozzolo, Arthur B. Corwin

    The Lenox Avenue Reconstruction Project involved the excavation and replacement of 750 m (2,500 ft) of deteriorated subway invert concrete, 5 to 7 m (15 to20 ft) below water table in very permeable gr

    Jan 1, 2001

  • SME
    Steel-Fiber-Reinforced Shotcrete For Tunnel Linings: The State Of The Art

    By Don Rose

    INTRODUCTION A number of tunnels supported and permanently lined by steel-fiber-reinforced shotcrete (SFRS) have been built in North America in the 1980s. The material is more economical than, and

    Jan 1, 1985

  • SME
    Coal Mining Subsidence and Golden Eagle Habitat

    By Val E. Payne

    Issues between resource utilization and resource preservation often develop in connection with coal mining. One such conflict exists in eastern Utah where PacifiCorp and Energy West Mining Company are

    Jan 1, 1986

  • SME
    Notes On The Efficacy Of Wet Versus Dry Screening Of Fly Ash

    By B. Valentim

    The methodology used to obtain fly ash subsamples of different sizes is generally based on wet or dry sieving methods. However, the worth of such methods is not certain if the methodology applied is n

    Jan 1, 2008

  • SME
    The Practical Use Of Sandfill In Creating Pillar Stability And Preventing Subsidence

    By W. K. Callaway

    The need to increase ore recovery and pillar stability caused the Magmont Mine staff to investigate the use of sandfill to accomplish both tasks. The use of hydraulically stowed classified mill tailin

    Jan 1, 1986

  • SME
    Federal Cooperation To Protect Watersheds Degraded By Coal Mine Drainage From Abandoned Mine Lands

    By B. Samoski

    In late 1994, EPA and OSM acknowledged that efforts by any one agency or by the many different agencies to remedy the water quality impacts of decades of contamination from abandoned coal mine lands

    Jan 1, 2002

  • SME
    Reprocessing Of A French Guyana Operation Tailings Using Flotation For Gold Concentration - Introduction - Preprint 09-062

    Compagnie Miniere Esperance (CME), a mining company based in French Guyana, operates a gold primary ore body in open pit. The ore is processed through crushing, grinding and gravity separation. Tailin

    Jan 1, 2009

  • SME
    Pebble Crushing Practice at Cyprus Bagdad

    By Bruce Clements

    The Bagdad mill, located near Bagdad, AZ, was built in 1977 with a designed mill capacity of 36.3 kt/d (40,000 stpd). An autogenous mill-ball mill crusher (ABC) grinding circuit was chosen. The or

    Jan 1, 1992

  • SME
    How the Global Experience and Reach of Tunnelling’s True Multi-Nationals Helped Solve a Difficult Road Tunnel Fit-Out Challenge

    By Simon Strong, Tim Brown, Luis Ignacio Sanz Vivanco

    "One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the pre-stressed preca

    Jan 1, 2016