Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
St. Louis Skinker–McCausland TunnelBy Jozef F. Zurawski
River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec
Jan 1, 2001
-
Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan OperationsBy A. Koski
A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U
Jan 1, 2007
-
Major Silver Deposits Of Utah: Geochemical And Geological Reasons For World -Class High And Low Grade Systems (afe76188-1e20-4ed9-a905-87de5b05bfe4)By L. P. James, W. W. Atkinson
Utah has produced about one billion troy oz. (31.7M tonnes) of silver, more than any U.S. state except Idaho. Several very high grade ore systems, now closed, occur within large polymetallic limestone
Jan 1, 2000
-
Improvements On Blasting Technique For Headrace TunnelsBy Yoneji Kanoh, Masahiko Ohtsuka
In Japanese tunneling history, it has commonly been accepted that the long-round driving is difficult due to the complicated geological condition. Therefore, the maximum past record has been less than
Jan 1, 1983
-
Single Bore Solution For Transit TunnelsBy Verya Nasri
The use of a single tunnel boring machine (TBM) tunnel of approximately 12 to 13 m (40 ft to 43 ft) diameter for transit systems to house both light rail or subway tracks in a stacked configuration is
Jan 1, 2010
-
Challenges Of Conveyors In TunnelingBy Marco Sonnenschein
As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if
Jan 1, 2012
-
Tough Times Not Enough To Deter More Than 2,200 From Northwest Mining MeetingAmid some of the worst economic conditions that the mining industry has been faced with in more than a decade, the mood among the large crowd at the 114th Annual Northwest Mining Association?s annual
Jan 1, 2009
-
Nature Of Low-Grade Indian Iron Ores And The Prospects Of Their Enrichment Through Gravity SeparationBy S. Roy
Soft laminated iron ore (SLO) having a higher hematite content and Martite goethite iron ore (MGO) having a higher goethite content were subjected to detailed characterization and beneficiation. The p
Jan 1, 2009
-
Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri LankaBy Jamal Rostami, Ataollah Rahbar
"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a
Jan 1, 2016
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
Challenges And Triumphs Of A Large-Diameter Microtunnel Relief Interceptor Sewer In IndianapolisBy Jeremy Morris
The city of Indianapolis has more than 25,000 homes currently on septic systems. Many of these systems do not function well because of their age and surrounding soil conditions. As Indianapolis has wo
Jan 1, 2011
-
Incorporating Indigenous Technologies Into Enhanced Stormwater, Erosion And Sediment Control SystemsBy R. C. Warner, L. Mills, S. D. Botts, M. Marticorena
The Antamina Mine is located in the mountainous region of the Ancash Department of Peru at an elevation of approximately 4200m.The 120 km main access road crosses the headwaters of numerous high-value
Jan 1, 2004
-
Engineering Geology and Cavern Design for New York CityBy Christopher Snee
??care has to be taken that the design is driven by sound geological reasoning and rigorous engineering logic rather than by the very attractive images that appear on the computer screen.??Hoek 1999
Jan 1, 2008
-
Parbati Hydroelectric Project Stage II, India—Two Inclined Pressure Shafts with a Honeycomb Segmental Lining Driven by a 5m Hard Rock Double Shield TBMBy Wolfgang Gütter
India is targeting to boost its electrical capacity from 100 GW to 200 GW within the next 10 years. The National Hydroelectric Power Corporation (NHPC) has decided in2001 to take execution of the 800
Jan 1, 2005
-
Bay Tunnel-Design ChallengesBy R. John Caulfield
The primary water supply system for the City of San Francisco and adjacent peninsula areas consists of aging and deteriorated pipelines crossing under the San Francisco Bay (the Bay). This system is h
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
The Minnesota Experience — A Harbinger Of The Future For U.S. Metals Mining And Minerals Education?By W. Hustrulid
In the mid-to-late 1800’s the U.S. mining industry was on the threshold of nearly a century of golden times. Nearly every state had a prosperous and growing mining sector. The importance of the indust
Jan 1, 2004
-
Government and Miners Meet to Increase Indian Exploration and MiningBy Andrew E. Nevin
The government of India convened a precedent-setting meeting in New Delhi on Nov. 12, 2001.The meeting brought together regulators and the mining industry in an attempt to fix the industry’s mine deve
Jan 1, 2002
-
Small Mine Contractor Safety - Case StudiesBy F. Calizaya
The Western Mining Training and Translation Center is a consortium of four universities devoted to developing educational and training projects to reduce the incidence/accident rates in the mining ind
Jan 1, 2008
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and ResultsBy Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007