Slurry Shield Tunneling in Portland—West Side CSO Tunnel ProjectBy James J. Kabat, James A. McDonald
Impregilo/SA Healy JV recently completed this Project using the first slurry shield TBM’s in the United States. The Project used two TBM’s to mine 18,000 feet in sands, gravels, and silty alluvial mat
Jan 1, 2007
-
An Investigation Into The Hydrological Behaviour Of Exposed And Covered Waste Rock DumpsBy Bruno Bussière, Guosheng Zhan, Michel Aubertin, Vincent Martin, Robert P. Chapuis
The study evaluates the hydrological behaviour of exposed and covered waste rock dumps. The objectives were to determine the major factors influencing unsaturated flow in waste rock dumps and covers,
Jan 1, 2005
-
Automated Quantitative Micro-Mineralogical Characterization For Environmental ApplicationsCharacterization of ore and waste-rock material using automated quantitative micro-mineralogical techniques (e.g., QEMSCAN® and MLA) has the potential to complement traditional acid-base accounting an
Feb 27, 2013
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and ExplorationBy Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
Isothermal Reduction Kinetics and Mechanism of Pre-oxidized Ilmenite Mining, Metallurgy and Exploration (9bd09701-4fce-4153-aadd-0723612382a9)By Mingyang Li, Yan Lv, Xiaolong Ma, Xudong Gao, Jie Zhao, Yingyi Zhang
The reduction process of pre-oxidized ilmenite concentrate powder in 30%CO–70%N2 atmosphere was characterized by thermogravimetric and differential thermogravimetric (TG-DTG) analysis system at the te
-
National Mining Hall of Fame Banquet Attracts Near Record CrowdBy Steve Kral
A near-record crowd of mining history enthusiasts made the trip to Leadville, CO in September to attend the National Mining Hall of Fame and Museum’s 19th induction banquet. Dressed in Victorian
Jan 1, 2007
-
Investigation Of The Selectivity Of Ethoxylcarbonyl Thionocarbametes During The Flotation Of Copper SulfidesIn this study, the flotation performances of ethoxycarbonyl thionocarbamate (ECTC), dialkyl thionocarbamate (DATC) and xanthate copper sulfide collectors are compared by the structure-reactivity relat
Jan 1, 2008
-
Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? IntroductionBy A. Jennings
[ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran
Jan 1, 2012
-
Downsizing Maintenance to Improve Performance: Defining the Downsizing TaskBy Paul D. Tomlingson
Editor's note: This is the first of two articles on maintenance. Part two, "Effective maintenance downsizing techniques," will appear in the October issue of MINING ENGINEERING. Most mine mana
Jan 1, 1994
-
Beach sand mining and its separation in Oscom, Orissa (India)By K. N. Panigrahi
India bestowed with 6000km of the coastal belt, contains some of the richest and largest placer deposits with a mixture of heavy minerals like ilmenite, rutile, leucoxene, zircon, monazite, sillimanit
Jan 1, 2005
-
New Technologies for the Mining IndustryBy Jacques Nantel
Mechanization has been at the core of productivity improvements since the industrial revolution. During the past 20 years, mining has derived spectacular progress from mechanization. In the future, ho
Jan 1, 1993
-
Geotechnical Considerations No. 7 Subway Line Extension Project in New York CityBy P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro
Jan 1, 2005
-
Concreting the Queens Tunnel, New York City Water Tunnel No.3By Edward M. Dowey
The concrete lining for a long 8.05 km (5 mi) section of New York City Water Tunnel No. 3 was cast in place. The contractor, Grow-Perini-Skanska, placed over76,841 m3 (100,505 cy) of concrete, pouring
Jan 1, 2001
-
Investigation and Abatement of Subsidence Damage at the Heltsley Residence, IndianaBy Robert A. Cummings, Madan M. Singh
In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and
Jan 1, 1986
-
Sodium Sulfate – 5,000 Years of Mining and Processing Salt CakeBy Donald E. Garrett
Sodium sulfate is one of the larger tonnage industrial minerals. A little more than half of this tonnage — 3 Mt/a (3.3 million stpy) of natural product— is recovered from ore deposits. Most of the r
Jan 1, 2002
-
Benefits of a Good Quality Assurance Program to an Electric UtilityBy W. J. Mahoney
A good quality assurance program at a coal mine or power plant is accurate, timely and consistent. The quality analysis is accurate due to a complete sampling of the coal stream loaded into the unit t
Jan 1, 1994
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Mineralogical And Microscopic Evaluation Of Coarse Taconite Tailings From Minnesota Taconite OperationsBy Lawrence M. Zanko
Eighteen coarse taconite tailings samples were collected in 2000-2001 from five western Mesabi Range taconite (iron ore) operations located in northern Minnesota, i.e., EVTAC, Hibbing Taconite (Hibtac
Jan 1, 2007
-
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode IslandBy Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert
Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his
Jan 1, 2007
-
Face Ventilation on a Bleederless Longwall Panel Mining, Metallurgy and ExplorationBy S. J. Schatzel, J. D. Addis, V. Gangrade, L. L. Chasko, C. A. Hollerich
A ventilation study using tracer gas was conducted at a western US coal mine. The objective of the study was to evaluate the movement of longwall face air exchanges between the face and worked-out are