Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Dealing With Subsidence and SMCRABy James M. Riddle
A discussion of frequently asked questions may help individuals trying to interpret subsidence regulations or prepare permit applications. The subsidence permitting process involves just one part of
Jan 12, 1980
-
Industrial Minerals Review 2012Editor?s note: Each year, Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue, all the while doing their ow
Jul 1, 2013
-
Bioflotation Of Malachite Using Rhodococcus Opacus: Role Of Bacterial Growth PhaseBy G. Kim
The influence of bacterial growth phase on the flotation behavior of malachite has been investigated in a well-controlled Hallimond tube system. The microflotation tests were conducted for malachite (
Feb 27, 2013
-
Record Production Of Industrial Rocks And Minerals In UtahBy B. Tripp
Utah produces a wide variety of industrial rock and mineral commodities, valued in 2005 at a record $758 million (21 percent of the total non-fuel mineral production of Utah). Major commodities produ
Jan 1, 2007
-
Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, CaliforniaBy David Young
This paper presents tunnel design considerations for the SR75/282 Transportation Corridor Project in Coronado, California. The project is managed by the City of Coronado in cooperation with Caltrans a
Jan 1, 2008
-
Proposed Contracting Practices For The Caltrain Downtown ExtensionBy Derek J. Penrice
The Caltrain Downtown Extension (DTX) project will extend commuter and future statewide high-speed rail service into the Transbay Transit Center, which will be located in the business district in down
-
Weathering In Coal Mine Rejects And Tailings - Variation With Respect To DepthBy S. Devasahayam
Acid production or acid drainage is a major environmental issue that also has negative implications on the aquifer system surrounding the mine tailings area. The approach to controlling acid mine drai
Jan 1, 2007
-
Lake Ft. Smith Microtunneling Lake TapBy Roberto J. Guardia, Ted Lewtas, Peter Rasmussen, Klaus Winkler
As part of the Lake Fort Smith Water Supply Dam Enlargement project, located in northwest Arkansas, microtunneling methods were used to install two side-by-side,1.53m (60-in) inside-diameter steel pip
Jan 1, 2005
-
Design And Subsurface Construction At Yucca Mountain, NevadaBy John F. Beesley
INTRODUCTION This paper discusses the design of the subsurface nuclear waste repository at Yucca Mountain, Nevada; and possible concepts for construction of the subsurface facility. Subsurface constr
-
Mineralogic And Geochemical Characteristics Of Uranium And Vanadium Distribution At A Proposed Uranium In-Situ Recovery Site, South DakotaBy S. F. Diehl
Drill cores from uranium roll-front deposits, hosted in lower Cretaceous strata, were examined from the proposed Dewey Burdock in-situ uranium recovery site in the northern part of the Edgemont uraniu
Feb 27, 2013
-
Heavy Minerals Activity On The Rise WorldwideBy William R. Yernberg
The Fifth International Heavy Minerals Conference (HMC) was held Oct. 16-19, 2005, at the Marriott Sawgrass Resort in Ponte Vedra, FL. With SME as sponsor, the 2005 conference marked the first time th
Jan 1, 2006
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion TunnelBy Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Design/Build Agreement For The Niagara Tunnel ProjectBy Russel Delmar, Rick Everdell, Harry Charalambu, John Tait
Award of the Design/Build Agreement for construction of Ontario Power Generation’s (OPG’s) Niagara Tunnel Project was made after an intensive 8-month international procurement process. The 14.4-m diam
Jan 1, 2007
-
The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension MeasurementsBy B. Comley, M. C. Harris
There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf
Jan 1, 2001
-
Helping Banks To Manage Mineral Land TrustsBy S. M. Pickering
Banks frequently manage large privately owned mineral land trust accounts for estate heirs. The bank has a fiduciary obligation to follow the “Prudent Man Rule”, which requires that trust properties
Jan 1, 2002
-
Ground Characterization And Feasibility Evaluation Of Tunneling Methods For Mather InterceptorBy Mohammad R. Jafari
The Camp Dresser & McKee (CDM) has been retained by the Sacramento Regional County Sanitation District (SRCSD) to design the Mather Interceptor, a portion of the South Interceptor and Mather Intercept
-
Satellite Remote Sensing-Based Estimates Of Biomass Production On Reclaimed Coal MinesRemote sensing methods have been used to evaluate vegetative growth patterns for many applications, though relatively little work has focused on tracking mine reclamation progress. For coal mines in C
Feb 27, 2013
-
Bulk-scale laboratory experiments of re-entering a sealed heatingBy W. K. Hitchcock
Anecdotal evidence suggests that re-entering a sealed heating poses a significant hazard, whereby the original heating is rejuvenated at an accelerated rate forcing withdrawal and re-sealing of the ar
Jan 1, 2009
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Case History of Trenchless Construction at the Lower Northwest Interceptor Program, Sacramento, CaliforniaBy Steven Norris, William Moler, Michael Cole, Patrick Doig, Debi Lewis, Craig Pyle, Matthew Crow
The recently completed Lower Northwest Interceptor Program (LNWI) in Sacramento, California comprises, ten pairs of micro tunnels totaling 4,369 m (14,417 ft),three horizontal directionally drilled bo
Jan 1, 2007