Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Majors, Juniors Spur Record Attendance at PDAC

    By Steve Kral

    Good times make for happy miners. And the past few years have seen a lot of smiling mining engineers, geologists, metallurgists, corporate executives, analysts, investment bankers and shareholders.

    Jan 1, 2006

  • SME
    The Successful Implementation Of An Expert System On An Alumina Calcining Kiln

    By D. Lawrence, H. Lawrence, G. Saevil

    Plant operators in the mineral processing industry have been implementing expert systems for several years now, with the intent to increase production and reduce costs. Most systems have been installe

    Jan 1, 2002

  • SME
    Review Of EPA Mandatory Reporting Of Greenhouse Gases (GHG) Rule Or ?MRR? ? Introduction

    By S. M. Carpenter

    In response to the FY2008 Consolidated Appropriations Act (H.R. 2764; Public Law 110?161), the United States Environmental Protection Agency (USEPA) issued the final Mandatory Reporting of Greenhouse

    Jan 1, 2011

  • SME
    Metallurgical Development And Design For The Pascua Lama Project

    By R. A. Williams

    The Pascua Lama Project is situated on the border of Chile and Argentina at an elevation of 4,800 m. The ore contains gold, silver and copper, and an initial milling production rate of 33,000 t/d is

    Jan 1, 2001

  • SME
    A new era in flotation: How HydroFloat technology from Eriez is transforming mineral processing - ME Feature Article

    By Jaisen Kohmuench, Michael J. Mankosa

    Flotation has long served as the foundation for sulfide mineral recovery. As ore grades decline, however, this traditional approach is being pushed to the limit. Nowhere is this more evident than in t

    Oct 1, 2025

  • SME
    Improving Coarse Particle Flotation For Energy Savings

    By H. Do, R. Yoon

    Mineral flotation is effective over a relatively narrow particle size range of approximately 10 to 100 µm. If the upper particle size limit can be increased, however, a run-of-mine ore may be coarse g

    Jan 1, 2007

  • SME
    Delay Timing And Vibration-Induced Damage To The Rock Mass

    By A. Karami

    It is well established that an ordered sequencing of charge initiations in a blast pattern is an important design consideration that affects blasting performance. Delay times must be chosen such that

    Jan 1, 2000

  • SME
    Effects Of Joint Persistence On Jointed Rock Masses

    By W. G. Pariseau

    Equivalent elastic properties of discontinuously jointed rock masses are computed using a non-representative volume element(NRVE) approach within a three dimensional finite element program. Joint pers

    Jan 1, 2003

  • SME
    Evaluation Of An Enhanced Gravity-Based Fine-Coal Circuit For High-Sulfur Coal

    By M. K. Mohanty

    One of the main objectives of this study was to evaluate a fine-coal cleaning circuit using an enhanced gravity separator specifically for a high sulfur coal application. The evaluation not only inclu

    Jan 1, 2008

  • SME
    Achieving World Class Maintenance Status

    By Paul D. Tomlingson

    World class performance is the ultimate objective of many maintenance organizations. It marks the organization as a leader in its industry and sets it apart as the ultimate achiever. But what is a “

    Jan 1, 2006

  • SME
    Longwall-Induced Ground Movement at a Shale Gas Well Site Located in a District Barrier Pillar—FLAC3D Modeling Results and Interpretation

    This paper evaluates the effect of longwall mining on a cluster of unconventional shale gas wells located in a district barrier pillar between a current longwall panel and the future panel north of th

    Jan 7, 2020

  • SME
    A Methodological Model To Assist On The Optimization And Risk Management Of Mining Investment Decisions

    By J. A. Botín

    Identifying, quantifying and minimizing technical risks associated to investment decisions is a key challenge for the minerals industry decision takers and investors. However, risk analysis in most b

    Jan 1, 2011

  • SME
    Inconsistency in gravimetric sampling pumps and cyclones

    By R. J. R. Cornelissen

    The elimination of the incidence of silicosis in employees in industries such as mining and pottery is an ongoing international initiative. After many decades of industrial activity in these industrie

    Jan 1, 2009

  • SME
    Influence of hydrodynamics on preflotation process in flotation machine Mining, Metallurgy and Exploration

    By W. Pawlos, A. Bakalarz, M. Duchnowska

    This paper presents the results of an investigation into the influence of hydrodynamics on a preflotation process for the copper sulfide ore from the Fore-Sudetic Monocline deposits in Poland in a flo

  • SME
    Newmont Gold Company Post Mill Grinding Circuit

    By David L. Hill

    Newmont Gold Company's Mill No. 4 is located along the Carlin trend, about 25 miles North of Carlin, Nevada. The plant consists of a primary grinding circuit using a 7.2 m (22 ft) diameter by 2.6

    Jan 1, 1993

  • SME
    Possibilities of utilizing mineral wastes in Hungary

    By I. Gombköto, J. Bohm

    "In Europe, and therefore in Hungary opening a new mine is harder and harder. Depletion of mines, unfavourable legal and economic changes, and growing public concerns are the main reasons. Social and

    Jan 1, 2011

  • SME
    A Report On Airborne AFMAG, The Theory, Equipment, And Operation In Western United States ? Introduction

    By William Crowe Kellogg

    By now the term AFMAG has been fairly well introduced to the mining industry. Several papers have been presented and published concerning AFMAG (references 1 and 2). However, the term AFMAG remains ra

    Jan 1, 1960

  • SME
    Software For Hydrologic Monitoring Of In Situ Leaching Operations

    By Peter K. Mathison

    The U. S. Department of Interior, Bureau of Mines (Bureau) is developing a hydrologic monitoring system for in situ leaching operations. A working prototype of this system was installed and tested at

    Jan 1, 1992

  • SME
    Coal 1986 - Underground mining

    Continued market pressure on the US coal industry was the overriding factor affecting developments in underground mining in 1986. An oversupply of coal in the spot market kept prices low throughout th

    Jan 5, 1987

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008