High Productivity Operation Of Shaft-Type Fe-Mn Smelting FurnaceBy Masanobu Masukawa, Toshio Shiota
The shaft-type ferromanganese smelting furnace (SF) at Mizushima Ferroalloy Co., Ltd. has been in operation since startup in 1985 and is continuing to perform smoothly. Production has been increased f
Jan 1, 2007
-
Some Considerations On Future Developments In Ferro-Alloy FurnacesBy I. J. Barker
Keywords: Submerged-arc furnace, plasma furnace, d.c. furnace, scale up, Søderberg electrodes, smart grid, demand side management, load shedding This paper argues that the scale up of furnaces and
Jan 1, 2011
-
Methane Release From South African CoalminesBy P. J. D. Lloyd
The widely employed IPCC models for the release of methane from underground coalmining operations are reviewed, and put in the context of the South African National Communication on greenhouse gas emi
Jan 1, 2005
-
The Importance of People in the Process of Converting a Narrow Tabular Hardrock Mine to MechanizationBy D. Vogt, T. Hattingh
"This paper argues that the technology change to mechanization is also going to require a change in people. It presents a model for technological progress and adapts it to the mining industry. It then
Jan 1, 2016
-
Comment On The Paper: Design Of Merensky Reef Crush PillarBy F. S. A. de Frey
The author would like to refer to his contribution to the paper `Design of pillar systems in South Africa' by Ozbay et al. 1. The authors agreed `wholeheartedly that further research, together w
Jan 1, 2011
-
The Application Of The Q-Tunnelling Quality Index To Rock Mass Assessment At Impala Platinum MinePublications on hard rock tunnel support design in the South African mining industry have originated primarily from the goldmines during the past 50 years. Little has been published to date on the pla
Jan 1, 2002
-
Guide memoire: The principles of reasonable prospects for eventual economic extractionBy T. Mapeta, S. M. Rupprecht
Discussions on reasonable prospects for eventual economic extraction (RPEEE) include the CRIRSCO 2019 reporting template, JORC 2012, SAMREC 2016, CIM 2019 Guideline, and Regulation SK-1300. These repo
Jun 27, 2025
-
Zimbabwe Alloys: The First Fifty Years Of Operation, Challenges, And OpportunitiesBy M. Machikicho, N. R. Shoko, J. Chirasha
Keywords: Pyrometallurgy, furnace, ferrochromium, alloys, Zimbabwe Zimbabwe Alloys was founded in 1949 by a consortium led by the John Brown Group. It was the first ferrochrome plant in Africa.
Jan 1, 2006
-
Investigation Of The Influence Of An Excavation On Adjacent Excavations, Using Neural NetworksBy S. Kwon
When an underground excavation is created near to an instrumented measuring location, deformation at the location increases. The characteristics of this deformation increase, as well as the duration o
Jan 1, 1998
-
Efficient Enhanced Gravity Recovery Of Zircon Using The Kelsey Centrifugal JigBy Wynand Erasmus, Terry A. Jones
The Kelsey Centrifugal Jig (KCJ) utilizes the application of centrifugal force (and the resultant enhanced gravitational field) to conventional jigging technology principles to successfully process ma
-
Geomechanics Challenges of Contemporary Deep Mining: A Suggested Model for Increasing Future Mining Safety and ProductivityThis paper pays tribute to the pioneers in geomechanics, and addresses some of the most pressing issues of our time related to deep mining, and how to mitigate these issues. Solutions developed by our
Jan 1, 2014
-
Rock Mass Behaviour Under Seismic Loading In A Deep Mine Environment: Implications For Stope SupportBy A. Cichowicz
In this study, techniques used to design earthquake-resistant structures are applied to the deep-level mining environment. Earthquake engineers seek to identify the cause of potentially damaging reson
Jan 1, 2000
-
A genetic algorithm model for optimising long-term open-pit mine production scheduling APCOM 2021By C. Musingwini, A. S. Nhleko, P. M. Muke
Open-pit mine planning includes the determination of a long-term open-pit mine production scheduling (OMPS) plan. The OMPS plan is generally a three-dimensional (3D) block extraction sequence that see
Sep 1, 2021
-
A Century Of Migrant Labour In The Gold Mines Of South AfricaBy J. S. Harington
Our purpose is to record and to explain the widely changing numbers of the huge total of black workers on the gold mines of South Africa over the century from 1896 to 1996. These men were recruited fr
Jan 1, 2004
-
Ground behavior investigation during roof fall in a roadwayBy V. V. Nazimko, A. I. Hohotva, S. N. Alexandrov, V. P. Sazhnev, V. S. Zaharov
Ground behaviour in the vicinity of a roadway has been investigated using a physical model and in situ tests during a roof fall. It was discovered that behaviour of the ground is governed by irreversi
Jan 1, 2003
-
Shaft Sinking Scheduling/Planning - IntroductionBy P. N. Lategan
Mining companies are challenged with increased difficulty in delivering capital projects on schedule and within budget. In 2005, PricewaterhouseCoopers global review of major capital projects in the m
Jan 1, 2009
-
Phasing Out Reverberatory Furnace Operations At KCM NkanaBy M. Natarajan, C. J. Cutler, E. Mponda
Keywords: Pyrometallurgy, furnace, KCM Nkana, Zambia The Nkana smelter was initially commissioned in 1931, with two reverberatory furnaces, two Peirce-Smith converters, and blister copper casting
Jan 1, 2006
-
The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)By V. Mathebula
Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv
Jan 1, 2004
-
The SAMREC Code 2105 — Some Thoughts and ConcernsBy S. M. Rupprecht
"SynopsisThis paper is intended to document recent personal thoughts, opinions, and debate around the South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserve
Jan 1, 2015
-
A Review Of The Sequential Grid Mining Method Employed At Elandsrand Gold MineBy M. F. Handley
Sequential grid mining has been employed as the primary mining strategy at the AngloGold West Wits Elandsrand Mine since the inception of stoping operations from the sub-vertical shaft system in 1988.