Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Optimization of Blasting Pattern in an Underground Coal Mine for Maximum Production with Minimum Roof Disturbance

    By R. Singh, M. Roy, D. Singh

    Success of a blasting pattern in Blasting-off-the-solid (BOS) in Bord (Room) & Pillar method of coal mining is judged by the percentage of pull achieved vis-à-vis the yield of coal produced in a blast

    Jan 1, 2003

  • ISEE
    Drawbacks of Blast Vibration Regulations

    By Mark Svinkin

    The purpose of this paper is to present an overview of recommended existing criteria of ground vibrations generated by blasting. It is shown that these criteria have limited liability because they wer

    Jan 1, 2003

  • ISEE
    New Technology in Vibration Measurements, Analysis & Data Management

    By D T. Froedge

    The latest development in vibration measurement equipment involves small microcomputer operated micro-sized seismographs. As the result of this there has been an explosion of the data generated by the

    Jan 1, 1994

  • ISEE
    Mining and Fragmentation: Proposal for a More Efficient Mine Management

    By Ivan Carrasco, Benjamin Cebrian

    Mining companies have traditionally organized their structure around a scheme easy to manage: Mining Department and Mill Department. In a challenging landscape for mining, with decreasing grades, incr

    Jan 1, 2014

  • ISEE
    Practical Experiences with the Use of Air-Decks in Quarry Blasting

    By Peter Moser, Frank Chiapetta, Sacha Diaj, Florian Bauer

    Good toe breakage and a flat working bench after blasting are important parameters to achieve a high productivity during material loading and reduce the necessity for secondary blasting. Good toe brea

    Jan 1, 2009

  • ISEE
    More Efficient Use of Your GPS

    By Wes Bender

    Considering the current interest in Global Positioning System (GPS) usage, it might be timely to look at a more efficient means of utilizing these instruments. The GPS system currently utilizes 28 sat

    Jan 1, 2002

  • ISEE
    Coal Supply Engineering Audit Supply

    By John W. Gunnett

    The purpose of this afternoon’s presentation is to highlight the investigative proce dures employed to complete an engineering audit of a mining operation. Skelly and Loy has been retained to perform

    Jan 1, 1992

  • ISEE
    Further Improvement to a Safe and Efficient Procedure to Blast, Excavate and Dispose of a Reactive Rock Type (ce9ea776-1b07-4cf4-ab21-135f14ac5eea)

    By M Ash, P Bellairs

    The world class iron ore mines at Mt Whaleback, Tom Price and Paraburdoo located in the Hamersley Province of Western Australia must mine the Mt McRae Shale to obtain high grade ore from the Dales Gor

    Jan 1, 1995

  • ISEE
    Assessment of Ideality of Some Commercial Explosives

    By J Aydin Bilgin, Sedat Esen

    This paper describes the ideality of some commercial explosives with the help of the detonation theory and detonation velocity measurement. Ideality of an explosive can be determined by comparing expe

    Jan 1, 1999

  • ISEE
    Emissions from Explosives

    By V. Wetzig

    In the past, various investigations have been carried out at the Hagerbach Experimental Gallery under accurately reproducible conditions, in order to determine the emissions emanating from blasting op

    Jan 1, 2001

  • ISEE
    Throw Blasting with Greater than 50 Meters of Overburden

    By John Haviland, Richard E. Danell

    "BHP Australia Coat Pty Ltd (BHPAC) operates seven large open pit coal mines in the Bowen Basin ofCentral Queensland, Australia. These mines have operated for periods ranging from 16 to 37 years. All

    Jan 1, 1995

  • ISEE
    Behavior of Nitrogen Oxides in the Product Gases from Explosive Detonations

    By James Rowland, Marcia Harris, Richard Mainiero, Michael Sapko

    All explosive materials produce a cloud of reaction products, the most toxic of which is nitrogen dioxide (NO2). In the study reported here, 4.5-kg (10-lb) charges of blasting agent confined in either

    Jan 1, 2006

  • ISEE
    Air Decking at Duvha, a Technical Evaluation

    By S A. Steyn, P Terrett

    Air decking has become a widely practised method internationally for modifying fragmentation results and providing cost savings from reduced explosive consumption. Duvha has been applying air deck tec

    Jan 1, 1995

  • ISEE
    Response of a High-Pressure Natural Gas Pipeline to Coal Mine Blasts

    By Ed Clah, Catherine Aimone-Martin

    The vibration response of a 30 in. diameter high-pressure (845 psi) natural gas pipeline to 11 coal mine blasts was measured. The X-52 steel pipeline was buried 7 ft. below the ground surface. Ground

    Jan 1, 2003

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • ISEE
    Fragmentation Interaction with Underground Mining Systems and Productivity

    By B Mohanty, Y C. Lizotte

    Optimization of blast fragmentation in underground hardrock mining requires analysis of its effects on loading and haulage equipment, together with the downstream materials handling system, with the o

    Jan 1, 1991

  • ISEE
    Elimination of Two-Pass Benching at Colowyo Coal

    By Alan Jorgansen, Dave Hummer, Scott Scovira

    Kennecott Energy's Colowyo Coal Mine is the largest open pit coal mine in Colorado and produces 5.5 MM tons per year. Colowyo uses the terrace mining method to recover up to seven seams of rolling coa

    Jan 1, 2003

  • ISEE
    Effects of Decoupling and Simultaneous Detonation on Blast Vibrations

    By Rodney D. Lamond

    The need for blast vibration monitoring can be attributed to a combination of three factors: Structural damage, Blast design and Human annoyance. Traditionally, vibration damage criteria are prescribe

    Jan 1, 1995

  • ISEE
    Environmental Blasting: Rehabilitiation of Surface Mining Sites Using Blasting

    By Richard E. Danell

    "Blasting is a principal step in the surface mining process for breaking and, in the case of overburdencasting, moving rocks and minerals. As many surface mines are coming to the end of theiroperation

    Jan 1, 1994

  • ISEE
    The Journal of Explosives Engineering Vol 21 No 3 - Dynamite Daze

    I was lucky to land a job in the powder business. I was looking for some way to support my wife and first child to be when I saw an ad in the Hercules magazine, “Explosives Engineer” for technical rep

    Jan 1, 2004