Application of Digital Image Analysis Technique for Fragmentation Assessment and Blast OptimisationBy M. Ramulu, A. Raina, A. Chakraborty, Jethwa Choudhury, Dudhankar
Application of digital image analysis technique for assessment of blast fragmentation is gaining grounds in India, very recently. Central Mining Research Institute, India made its maiden attempt to op
Jan 1, 2001
-
Diagnosing and Modifying Off-Site Blast Effects by Seismic Means - A Case StudyBy Stuart Brashear, Robert Brush, Ben Cook
In early 1993, the Piney River quarry owned and operated by the Blue Ridge Stone Corporation of W W? Boxley received a series of complaints from the owners of a 130 year-old historic farmhouse that ha
Jan 1, 1996
-
An Appraisal of Overburden Cast Blasting Technique in Indian Surface Coal MinesBy Manish Uttarwar, Rajendra Yerpude
India is the third largest producer of coal and the fourth largest in terms of coal reserves in the world. However, new research quite ironically projects that despite the continuing growth in domesti
Jan 1, 2009
-
Modeling Effect of Delay Scatter on Peak Particle Velocity of Blast Vibration Using a Multiple Seed Waveform Vibration ModelBy R Yang, M Lownds
This paper reports studies showing the effects of delay scatter on the peak particle velocity (PPV) of blast vibration using a multiple seed wave (MSW) vibration model developed in recent years. The c
Jan 1, 2011
-
Using State of the Art Blast Modeling Software to Assist the Excavation of the Yucca Mountain Nuclear Waste RepositoryBy Jason Ryan, Stephen Harria
Q.E.D. (QED) is a blast design and evaluation model that allows full three-dimensional design specification including the development of unique “live” terrains and an unlimited variety of complex char
Jan 1, 2000
-
Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock ProducedBy Ron Glowe
This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu
Jan 1, 2005
-
Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography SystemsBy Bruce Vandenberg, R. Frank Chiappetta, John Foley
Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of
Jan 1, 2000
-
Blasting in the New Mellinnium: Planning for the UnexpectedBy Steve Dillingham
The horrific events surrounding September 11th left Americans with a feeling of sudden helplessness...the shock of being unprepared and powerless. From this tragedy, we can understand the need to prep
Jan 1, 2003
-
Production Blasting with Electronic Delay Detonators at Peak QuarryBy H G. Bosmare, G Bedser, C V. B Cunningham
Peak Quany has achieved substantial improvements to its bottom lie by giving close attention to blasting practice, and in pr@icnlar by introducing electronic delay detonators for routine production bl
Jan 1, 1998
-
The Impact of Blasting on Pit Slope StabilityBy Pefer F. Stacey
This paper considers some of the trends in slope design technology that are emerging as we approach the 21st Century. While the ability to design stable slopes has unproved greatly over the past 20 ye
Jan 1, 1994
-
Benefits of Power Decks in BlastingBy Marlyn King, Kevin Peterson
Power Decks are voids created in the bottom of the borehole through the use of a suspended Super Plug. Explosive energy is started downward at initiation creating high pressures which find relief at t
Jan 1, 2002
-
Effects of Particle Size Distribution on Loading PerformanceBy Gungor Tuncer, Ali Kahriman, Abdulkadir Karadogan, Umit Ozer, Ertugrul Kaya, Kagan Ozdemir
The results of bench blasting on quarries, have important influences on the performance of subsequent mining activities such as loading, hauling, crushing, grinding etc., and the total costs of that m
Jan 1, 2008
-
The Application of Mid-Column Air Decks in Full Scale Production BlastsBy Barend Botha, Trevor Davids
The presence of an extensive soft siltstone layer in the middle of the inter-burden sequence of rocks at Syferfontein Colliery in the Republic of South Africa prompted tests to determine the effect of
Jan 1, 2000
-
Wireless Electronic BlastingBy Daniel Mallette, Richard Goodridge, C M. Lownds
Despite a world of mobile devices that has many of us taking the ability to communicate wirelessly for granted, an in-hole wireless initiation system was thought to be not viable. The known and common
Jan 1, 2016
-
Advanced Blast Modeling for Mining Steeply Dipping Coal SeamsBy Dan L'Heureux, Joe Haid, Stephen H. Chung
Most coal deposits in Western Canada involve steeply dipping multiple seams. An efficient way to recover coal seams would be to drill through the seams and blast both the overlying and underlying wast
Jan 1, 1998
-
High.Speed 2D Analysis Program Version 1.30By Bruce Vandenberg, R F. Chiappetta
"The High Speed 2D Analysis program allows the user to bring in data from several different sources. Of course, keyboard entry is included as a source. Other data is inputted through the serial port (
Jan 1, 1989
-
Vibrating Wire Gages Watch Dynamical Structural Integrity During BlastingBy A. Feldman
Measuring dynamic effects on existing structures such as dams and bridges during earthquakes or blasting is frequently done using strong motion detectors. However, a more comprehensive dynamic structu
Jan 1, 2006
-
Momentum Theory – A New Calculation of Blast Design and Assessment of Blast VibrationsBy Robert Boehnke, Bernd Mueller
Despite enormous efforts over the last decades there are still many unanswered questions with respect to calculation and modeling of the blast process using appropriate physical laws. Most calculation
Jan 1, 2003
-
Radio Controlled Detonators and Sequential Real Time Blast ApplicationsBy J M. Laboz Bernard
Among the numerous technical evolutions in the blasting environment we are going to describe below the concep
Jan 1, 1995
-
Super Cautious Contour Blasting UndergroundBy Stig O. Olofsson
The problem of overbreak in underground construction and mining is normally approached by a variety of smooth blasting methods. Numerous small diameter, low velocity explosives have been developed spe
Jan 1, 1994