Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Strain-based Instrumentation for Marine Terminal Rock Blasting

    By Cathy Aimone-Martin, Brent Meins

    A comprehensive instrumentation program was implemented at the Howland Hook Marine Terminal on Staten Island, NY during proximate underwater rock blasting in 2014. Forty-two blasts took place over a 4

    Jan 1, 2016

  • ISEE
    Sympathetic Detonation Causes and Solutions

    By P D. "Takis" Katsabanis

    The phenomenon of sympathetic detonations in blastholes is investigated by comparing experimental observations and numerical modelling results. Numerical modelling using the TDL computer code and Fore

    Jan 1, 1991

  • ISEE
    Daveytronic High Accuracy Digital Blasting System

    By Douglas Bartley, Robert McClure

    This paper discusses the advances in programmable, testable high accuracy electronic detonator technology. The operation and safety of electronic detonator systems are required to meet rigid safety st

    Jan 1, 2000

  • ISEE
    Small Diameter Explosives - Choosing for Underground Blasting Applications

    By S J. Brace

    About 180 000 tons of explosives are used annually underground in South Africa. Most is loaded into holes less than 50mm in diameter. 75% is consumed in the gold and platinum mines where holes are bet

    Jan 1, 1994

  • ISEE
    Evaluation and Selection of Blasthole Drilling Equipment Based on Application and Overall Cost

    By George D. Raitt

    Anyone who has spent any time in and around the drilling and blasting profession knows that probably the most critical part is the drilling portion. A blasthole is nothing more than a cylindrical vehi

    Jan 1, 1990

  • ISEE
    Blasting Mitigation Measures Used to Control a Highwall Failure Risk

    By Jean-Sébastien Lambert, Joseph Kabuya, Richard Simon

    Managing a highwall failure risk in an open pit mine by controlling and mitigating the impact of vibrations produced by blasting operations is key to achieving safe and cost-effective operations. The

  • ISEE
    Bottom Hole Annular Pressure: A Theoretical Problem with Real Effects

    By Clarence R. Zink

    A problem has always existed in deep and fast drilling situations such as coal overburden drilling, or when drilling with a tight annulus, such as 9 7/8" bits and 8 5/8" pipe. This problem is the diff

    Jan 1, 1998

  • ISEE
    Economics of Buffer Blasting in Surface Mineral Mines-Minimizing Ore Waste and Dilution

    By Dale S. Preece, J Paul Tidman, Stephen H. Chung

    A discrete element computer program named DMC-BLAST (Distinct Motion code) has been under development since. 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employs explicit time

    Jan 1, 1998

  • ISEE
    Application of Underground Bulk Explosives in Polyethylene Pipes for Perimeter Control

    By Jena Moshen

    Underground Bulk Systems (UBS) technology has gained widespread application in tunneling and underground mining owing to its safety, reliability, increased Velocity of Detonation (VOD) and excellent r

    Jan 1, 2018

  • ISEE
    Economics of Blasting around Steep Dipping Coal Seams at the Mt. Owen Mine

    By Trevor Howie, Mal Edwards

    "Thiess Contractors Pty Ltd. designed and operate the Mt Owen Mine in the Hunter Valley of NewSouth Wales, Australia on behalf of the owners of the mine, BHP Coal Pty Ltd. The mine is a multiseam open

    Jan 1, 1997

  • ISEE
    Why We Keep Blast Reports

    By Paul Kunze

    For some of us, the most disagreeable part of being the blaster- in - charge is doing the required paperwork. Cost coding on time cards, drilling reports, magazine inventory logs, and blast records al

    Jan 1, 2004

  • ISEE
    Blast Assessment and Optimization with Respect to the Control of Environmental Effects

    By Frank Sames

    The control of the environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations

    Jan 1, 1997

  • ISEE
    Florida Mining Blast Vibration Study Part 4: Conclusions and Recommendations

    By Tristan Worsey, Nathan Rouse

    Florida legislature allocated funding for the Florida State Fire Marshal to review the applicability of the United States Bureau of Mines (USBM) Report of Investigations (RI) 8507 blast vibration limi

    Jan 1, 2019

  • ISEE
    Airblast Control Techniques in Open Cut Mines

    By Alan: Moore Richards

    Effective control of airblast requires that significant factors be identified and satisfied by blast design and careful implementation. Significant factors include charge mass, distance, face height a

    Jan 1, 2006

  • ISEE
    Development of a Wireless Sensor Network for Blast Monitoring and Slope Stability

    By Johnny Lyons-Baral, John Kemeny, Don Kraemer

    Ground vibrations from blasting can result in the degradation and failure of rock and soil exposures, as well as damaging neighboring houses and buildings. At the same time, vibration provides an oppo

    Jan 1, 2014

  • ISEE
    The Application of Electronic Detonators to Improve Blast Vibration Predictions at Limestone Quarries

    By R. Farnfield, W. Birch

    Arguably, some of the most restrictive statutory blast vibration requirements attached to mineral extraction operations can be found in the United Kingdom. Such limitations are, as a rule for the UK,

    Jan 1, 2006

  • ISEE
    Rotary Drilling--An Analysis of the Equation Drill+Drill Steel=Productivity

    By Nils Heinke, Stephen M. Collinsorth

    To anyone who is responsible for the production of blast holes, who is looked to on a daily basis for drill maintenance and performance, whose bottom line may depend on the survival of the mine itself

    Jan 1, 1998

  • ISEE
    Risk Management in Blasting: Lessons Learned the Hard Way

    By Ralph E. Burnham, Jeff Taylor, Jonson Montgomery, J. Kelly Ratliff, Rennie Montgomery, Martin Brashear

    Top priorities for all blasting companies and individual blasters are risk management, safety of company personnel and the general public, regulatory compliance, and liability protection. On a daily b

    Jan 1, 2018

  • ISEE
    Saving Time and Money with Mobile Reporting and Online Databases

    By Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall

    As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori

    Jan 1, 2018

  • ISEE
    Improving Geologic Knowledge with IOT Sensors on Blasthole Drills

    By Steven Putt

    Seismic While Drilling (SWD) is a newly developed technology in the mining industry. Improving upon Measurement While Drilling (MWD) systems, SWD measures mechanical properties of the rock at incremen