Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Maintenance

    By Peter C. Jones

    The paper gives a broad view of the maintenance procedures at the Cassiar Asbestos Corporation property. Comparisons are drawn to indicate the changes in facilities and approach that have evolved over

    Jan 1, 1978

  • CIM
    The Onça Puma Nickel Project

    By Ruy L. Rodrigues

    Vale is in the early stages of commissioning its Onça Puma nickel operations. The project is meant for the production of 58,000 tpa of nickel contained in ferro-nickel, substantially contributing to t

    May 1, 2010

  • CIM
    International mineral resource and mineral reserve classification and reporting systems

    By S. Felderhof, W. S. Vaughan

    "Over the years, it has been increasingly difficult for the minerals industry to raise the necessary capital for its activities. To alleviate this phenomenon, complete transparency and capital market

    Jan 1, 2005

  • CIM
    Copper Concentrate Quality Improvements at Myra Falls

    By T. Yeomans

    NVI Mining’s Myra Falls operation is a forty-year-old underground mining operation feeding a 4,000 metric tonnes per day concentrator. The current mill, built in 1985, was designed to process a massiv

    Jan 1, 2009

  • CIM
    Dynamic hydraulic shovel simulator for improved machine performance

    By S. Frimpong

    Hydraulic shovels are widely used for primary production in surface mining operations. Variability in material diggability, unstructured mining environments and limited space and operator inefficiency

    Jan 1, 2005

  • CIM
    Process Applicaiton Design of Hydrocyclones for Closed-Circuit Grinding

    "Generation and removal of fines are considered in the context of the mill and classifier as a single-unit process in which grinding rates and mechanisms, mill residence time distribution, circulating

    Jan 1, 1984

  • CIM
    The development of process mineralogy at Falconbridge Limited and application to the Raglan Mill

    By J. S. Stickling, P. J. Whittaker, N. O. Lotter

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Developments in Fine Gravity Concentration Using the Bartles-Mozley Table

    By R. O. Burt, D. J. Ottley

    "SYNOPSISRecent developments in the use of the Bartles-Mozley table and the Bartles CTS screen are described for the gravity preconcentration of fine heavy mineral and metal particles present in low g

    Jan 1, 1973

  • CIM
    Geometallurgical Characterisation and Representative Metallurgical Sampling at Xstrata Process Support

    By J. Sliwinski, J. Oliveira

    "The application of geometallurgy and corresponding sample selection can take on several formats within industry. Current practice can range from a strictly geostatistical approach to one in which geo

    Jan 1, 2013

  • CIM
    Bio-treatment of Refractory Gold Ore in Obuasi Mines

    By J. K. Afidenyo, J. Osei-Owusu

    "The Obuasi Mine of AngloGold Ashanti Limited has been operating the world’s largest Biooxidation Plant at its Sulfide Treatment Plant (STP) in Ghana, using the Gencor Biox® technology since February

    Jan 1, 2008

  • CIM
    Improvement of Mass and Value Balance data from the Statistical Benchmark Model

    By Cecilia Arrue, Dominic Fragomeni, N. O. Lotter

    "A statistically designed benchmark mill survey was carried out in July 2005 at the Kidd Creek Concentrator, D Division circuit, which processes Ni/Cu ore from the Montcalm deposit. A structured stati

    Jan 1, 2007

  • CIM
    Development and field testing of a tension measuring gauge for cable bolts used as ground support

    By P. Choquet, F. Miller

    "The development and testing of a simple low-cost gauge for measurement of tension in a cable bolt grouted in a borehole are presented. Its principle is based on a resistance wire which is wound on a

    Jan 1, 1988

  • CIM
    Use of the Latest Technology to Overcome the Demands of Mill Operation

    By Tatiana Ravani von Ow, Leandro Bomvisinho

    "The size of mills driven by ring-gear or by a gearless solution has significantly increased in the last years. This has created additional challenges for the driven equipment. The requirements for th

    Jan 1, 2010

  • CIM
    Treatment of Non-Magnetics at Falconbridge

    By C. H. Dionne, J. A. Holmes, B. J. Huls

    "Falconbridge Limited is presently developing flowsheet alternatives for implementation at the Strathcona Mill. The main thrust for change arises from the need to reject more pyrrhotite from the conce

    Jan 1, 1991

  • CIM
    Design and Operation of a Future Mill

    By D. E. Pickett, J. A. Roland Faucher

    "INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow

    Jan 1, 1979

  • CIM
    Antamina Productivity Increase through Improvements Implemented in the Primary Crushing

    By Carlos León, David Estrella, Javier Linares

    "Recently, Antamina has completed an expansion program of its operations which increased the thoughput in grinding from acapacity of 109 to 130 ktpd. After commissioning, throughput could be exceeded

    Jan 1, 2013

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part II Underground Transport and Stope Placement

    By Jamie Archibald

    The Department of Mining Engineering at Queen?s University conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview pote

    May 1, 2009

  • CIM
    Rock Mass Characterisation and Stope Design

    By Karina Forster

    Rock mass characterisation is a critical component of effective stope design. Unexpected excessive stope dilution or uneconomic stope sizes can be the result of rock mass characterisation that is not

    May 1, 2006

  • CIM
    A Geometallurgical Approach to Flotation Process Design Using Optimised Grade-Recovery Curves

    By D. Hatfield

    "Flotation plants typically aim to maximise recovery at or above a target grade. As the ore from the mine varies, operators increase or decrease the mass pull in different flotation banks by adjusting

    Jan 1, 2013

  • CIM
    Selectivity in the Collectorless Flotation of Two Complex Sulphide Ores

    By M. Leroux, P. Lacombe, S. R. Rao, J. Y. Kim, J. A. Finch, G. Labonté, N. Macminn, M. Ounpuu

    "Laboratory investigations on two complex ores, the A1 zone ore from Les Mines Selbaie and the Lyon Lake ore from Mattabi Mines Ltd. (Division of Noranda Minerals), have been carried out to determine

    Jan 1, 1990