Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Continuous Reactor Altonorte Smelter

    By R. ZapataN.

    "In the following report, Altonorte Smelter owned by Xstrata will explain its experience with its denominated furnace called ""Continuous Altonorte Reactor"" since started up in March 2002. The Reacto

    Jan 1, 2007

  • CIM
    Post-mineralization Breccia Dike from the Sar Cheshmeh Porphyry Copper Deposit, Kerman, Iran

    By J. Shahabpour

    "Abstract - Breccias with angular and rounded clasts of a late-mineralization, ""barren"" hornblende porphyry dike set within a comminuted matrix consisting of rock fragments and quartz, cemented by q

    Jan 1, 1994

  • CIM
    Inhomogeneity in Microstructures and Tensile Properties in High Pressure Die-Castings of Al-Mg-Si Alloys

    By R. Darlington, S. Ji

    "High pressure die casting is a promising process to make thin-wall components with high dimensional accuracy and excellent surface quality. However, the non-uniformity is one of the important feature

    Jan 1, 2018

  • CIM
    Study on Settlement Deformation of Unconsolidated Strata and Monitoring During Low-Pressure Water Injection

    By Jing Chai

    The Cenozoic unconsolidated strata with the thickness of 100 to 240m in the east area of China are composed of clay, sandy clay and hardpan, etc. Numerous shafts of the coal mines in these areas have

    Aug 1, 2013

  • CIM
    Comparative Stability Analysis of Tailings Storage Facilities

    By Mosquera. J.

    Tailings Storage Facilities (TSFs) are vast structures that respond to site-specific characteristics, rate of production, placement techniques, and the physical and mechanical properties of tailings.

    Aug 1, 2013

  • CIM
    Hadean Uranium Activity 3rd International Conference on Uranium (Uranium 2010), 40th Annual Hydrometallurgy Meeting

    By Therese Schneck

    The presence of xenon isotopes from in-situ spontaneous fission of short-lived Pu244 has been confirmed in Hadean detrital zircons from Western Australia. Hadean and meteoritic zircons can retain seco

    Aug 1, 2010

  • CIM
    Linear Friction Welding Of Ti-5AL-5V-5Mo-3Cr

    By X. Cao, J. J. Jonas, Wanjara. P., J. Gholipour, E. Dalgaard

    The linear friction welding (LFW) behaviour of near-ß titanium alloy Ti-5Al-5V-5Mo-3Cr (Ti- 5553) was investigated. Microhardness measurements were performed in order to evaluate the mechanical proper

    Jan 1, 2010

  • CIM
    Mechanical Properties of Ultra Fine Precipitation Hardened Hot Rolled High Strength Steel

    By Yoshimasa Funakawa, Kazuhiro Seto, Akio Kobayashi

    A new hot rolled high strength steel consisting of ferrite matrix and nanometer¬sized precipitates was developed. The ultra fine precipitates were identified as TiMoC2, and the strengthening by the pr

    Jan 1, 2004

  • CIM
    On the Calibration of the Potential Technique for Monitoring Corrosion Fatigue Crack Growth Using Finite-Element Method

    When selecting a method for monitoring crack growth in pipeline steel, the sensitivity or crack-size resolution plays a dominant role. Even though there are several visual and non-visual methods, the

    Jan 1, 2005

  • CIM
    Characterizing Frothers Using Gas Holdup

    By F. Azgomi

    A possible way to characterize (classify) frothers using gas holdup as a surrogate for bubble size was explored. Nine surfactants with a range in chemical structures were selected and tested in a bubb

    Jan 1, 2006

  • CIM
    Mining Methods at Copper Mountain

    By Walter I. Nelson

    THE geology of the Copper Mountain mine has been ably described by Dr. Victor Dolmage in Memoir 171 of the Geological Survey. Reference is invited to that paper for a more extended description of the

    Jan 1, 1941

  • CIM
    Physics of Gravitational Separation as a Mass Process

    By Eugene Barsky

    "At present, theoretical concepts of gravitational separation processes are mainly limited by the study of the interaction between a flow and a solitary particle. Then the main conclusions of this ana

    Jan 1, 2016

  • CIM
    Analysis on Roadway Roof Bed Separation Affected to Bolt Loading and Support Design in Engineering

    By Shuan-cheng Gu

    Roof bed separation often occurred due to the deformation incoordination of surrounding rock following the excavation of mine roadway. Bed separation has effect on the bolts, and the estimation of the

    Aug 1, 2013

  • CIM
    Backfilling at the Sullivan Mine

    By C. D. M. Chisholm

    IN discussing stope filling, or backfilling, at the Sullivan mine, at Kimberley, B.C., a brief description of the problem will first be presented. The Sullivan orebody is a replacement in quartzite, w

    Jan 1, 1941

  • CIM
    Numerical Modeling of Brittle Rock Failure Under Dynamic Stress Loading

    By N. Golchinfar

    Tunnels in deep mines are subjected to high stresses. Fracture and failure of the rock mass around an opening can occur when mining-induced stresses are high. In burst-prone grounds, mining-induced se

    Aug 1, 2013

  • CIM
    Electrochemical Formation of RE-Ni (RE= Nd, Dy, Pr) Alloys in Molten Salts

    By R. Hagiwara, S. Kobayashi, K. Yasuda, T. Nohira, K. Kondo

    To establish a process for the electrochemical recovery of rare earth elements from used magnet scraps, the electrochemical formation of RE-Ni alloys in molten NaCl-KCl-RECl3 salt at 973 K was investi

    Jan 1, 2014

  • CIM
    Impounding Influence of Slope and Foundation to High Arch Dam

    By L. Cheng, Y. W. Pan, Y. R. Liu

    "Impounding deformation of slope and foundation is significant during and post dam construction. Reservoir impoundment is accompanied with various phenomena, including material degradation, effective

    Jan 1, 2015

  • CIM
    Autoclave Application for Zinc Leach Residue Treatment by Akita Zinc Co., Ltd.

    By H. Arima, Y. Kudo

    In general, the iron content of zinc leach residue produced by sulphuric acid leaching from calcine is disposed as jarosite or goethite into a tailing dam. More recently, these iron residues have been

    Jan 1, 2004

  • CIM
    Settling Properties of Copper Electrorefining Anode Slimes

    By T. Kalliomäki, A. T. Aji, M. Lundström, J. Aromaa

    The settling properties of anode slime in copper electrorefining have crucial effect on copper cathode quality. Anode slime settling is affected by electrolyte composition and temperature, electrolyte

    Jan 1, 2019

  • CIM
    Maximize Opportunities in Milling Operations

    By K. Kim

    "All milling operations would like to achieve the best possible recovery in combination with the highest achievable throughput. Unfortunately, many operations have problems with low recovery, low thro

    Jan 1, 2019