Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Benchmarking Tool for Assessing Flotation Cell Performance

    By Jan E. Nesset, James A. Finch, Wei Zhang

    "Bubbles are unquestionably the heart of the flotation process. Their size and combined surface area are largely what drive the recovery process. This suggests that plant engineers should be aware of

    Jan 1, 2012

  • CIM
    Geology and Chemistry of the Low Ti Magnetite-bearing Heff Cu-Au Skarn and its Associated Plutonic Rocks, Heffley Lake, South-Central British Columbia

    By I. C. L. Webster, G. E. Ray

    "The magnetite-rich Heff Cu-Au skarn lies in the Quesnel Terrane of south-central British Columbia, approximately 26 km northeast of Kamloops. The skarn formed close to the northern margin of the Heff

    Jan 1, 2007

  • CIM
    The Rabbit Lake Mill -Twenty Years of Milling

    By Lam. E. K., J. W. Jarvi, B. P. Bharadwaj

    "The Rabbit Lake Operation is located in Northern Saskatchewan on the western shore of Wollaston Lake approximately 800 km north of Saskatoon, Saskatchewan.The Operation is owned by a joint venture of

    Jan 1, 1996

  • CIM
    An Empirical Approach to Charge Media Wear Prediction

    By Peter Radziszewski

    "Typical mining operating costs can be divided between extraction (30 % to 70 %), comminution (30 % to 50 %) and separation (5% to 20% ). Cornminition process costs, representing an important contribu

    Jan 1, 2000

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Westwood Project Acceleration

    Westwood Quebec Long Life, Low Cost CONSTRUCTION UPDATE ? Shaft advanced to 840m (after 1 year), 3 km of down ramp and 2 km of exploration drift ? Head frame and hoist room structure completed ?

    May 1, 2010

  • CIM
    Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of Canada

    By Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie

    "A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im

    Jan 1, 2009

  • CIM
    Successful Treatment of Complex Feeds through the Isasmelt™ and Albion Process™

    By S. Nikolic, G. M. Stieper, D. P. Mallah, B. J. Hogg, P. B. Voigt

    Copper feed materials processing is becoming more challenging, due to an incremental increase in the mineralogical and compositional complexity of these feeds. These complex and polymetallic feeds are

    Jan 1, 2019

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    Toward a unified and digital communication system for underground mines

    By P. -M. Tardif, S. Outalha, R. Le

    "This paper proposes a new direction to implement an underground mine communication system. It presents actual underground communication systems and discusses their technological limits. A new system

    Jan 1, 2000

  • CIM
    A regressive mode of highwall failure in coal strip mines

    By B. Stimpson, K. Kosar, K. Barron

    "A number of high wall failures have occurred in some of the Alberta coal strip mines of a type called by the authors ""Multiple block plane shear slope failure "". They cause rapid deterioration of t

    Jan 1, 1986

  • CIM
    MillMapper - A Tool for Mill Liner Condition Monitoring and Mill Performance Optimization

    By Jochen Franke, Derek D. Lichti

    "This paper gives a brief introduction and presents recent enhancements in the MillMapper technology developed for thickness gauging and condition monitoring of liners in grinding mills used for miner

    Jan 1, 2008

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • CIM
    The Application of Large Scale Stirred Milling to the Retreatment of Merensky Platinum Tailings

    By Stephan Buys, Dan Curry, Chris Rule

    "The use of fine grinding (FG) in mineral processing is well established. The application of FG in the South African platinum industry is more recent and it’s use in the recovery of PGM’s from dormant

    Jan 1, 2005

  • CIM
    Ecological Engineering and Biological Polishing Methods to Economize Waste Management

    By M. Kalin

    "SUMMARYWaste management in general, and the water treatment of mine and mill effluents, has become an ever increasing burden for mining operations. A reduction in these expenditures would undoubtedly

    Jan 1, 1988

  • CIM
    Ore Characterisation of the Aqqaluk Deposit at Red Dog

    By Steven W. Wilson, Brigitte Lacouture, Nichola A. McKay

    "The Aqqaluk deposit is a lead-zinc ore body that lies immediately north of the Main Pit at Teck Cominco’s Red Dog Mine in Alaska. It is scheduled to begin production in 2011 or 2012. A project team w

    Jan 1, 2007

  • CIM
    Report of Council: For the Year Ended December 31st, 1948

    By Unkown

    To the Membership of the Institute Gentlemen: The Mineral Industry of Canada in 1948 The preliminary estimate issued by the Dominion Bureau of Statistics and tabulated in the Bulletin of Janu

    Jan 1, 1949

  • CIM
    Computer Control of the Flotation Process at Clarabelle Mill

    By D. F. Cooper, J. G. Paterson, K. H. Pang

    "Effective control of metallurgy by manual adjustment of cell levels is common flotation practice. With an on-stream XRF analyzer interfaced to a process control computer it is possible to program the

    Jan 1, 1973

  • CIM
    Characteristics of Mineralization at the Main Zone of the Clarence Stream Gold Deposit, Southwestern New Brunswick, Canada: Evidence for an Intrusion-Related Gold System in the Northern Appalachian Orogen

    By K. G. Thorne, L. J. Cabri, L. R. Fyffe, D. R. Lentz, D. Hoy

    "Mineralization at the Main zone of the Clarence Stream gold deposit in southwestern New Brunswick occurs within a parallel series of quartz veins that occupy a NE-trending, steeply north-dipping, bri

    Jan 1, 2008

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009