Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How to use Pre-Employment Medical Examinations and Comply with Anti-Discrimination Legislation

    The law including legislation such as the Occupational Health & Safety Act 1983 imposes stringent obligations on employers to ensure the health and safety of their employees. The use of pre-employment

    Jan 1, 1998

  • AUSIMM
    Data Collection and Management in Underground Engineering

    This paper presents a new idea in field data collection for geological and scientific data. The computer keyboard has been replaced by a barcode wand driving a spreadsheet style editor. To use the ful

    Jan 1, 1993

  • AUSIMM
    The Gradation from Amphibolite to Potosi Gneiss in the Broken Hill Mine Sequence

    Mackenzie (1968, p. 167) inferred that amphibolitelayers grade into and may be correlated with footwall Potosi gneiss where it is thin under the thickest development of the "lead lode" in th

    Jan 1, 1972

  • AUSIMM
    The Application of Holistic Safety and Risk Management Techniques to the Mining Industry

    By D Lees

    Safety is paramount in the underground mining environment. The mining industry has for many years focused on injury prevention in the workplace through procedures and training. In the area of control

    Jan 1, 2003

  • AUSIMM
    Smelting Practice at Olympic Dam

    The Olympic Dam smelter utilises Outokumpu Oy, flash smelting technology to produce blister copper direct from high grade copper concentrate.This paper describes the unit processes involved, including

    Jan 1, 1993

  • AUSIMM
    Historic Gold Dredging on the West Coast

    Slide presentation at conference

    Jan 1, 1996

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    Using Comb-Layered Textures in Porphyry Ore Deposits to Sample Pristine Magmatic Fluids

    By N C. White, L Danyushevsky, D R. Cooke

    Comb-layered textures preserve the cyclic accumulation and release of volatiles inside magmas that are temporally associated with large Cu-Au-Mo-rich porphyry ore deposits. Fluid inclusions in these t

    Jan 1, 2008

  • AUSIMM
    Investigating the impact of royalties on commercial lunar ice mining

    By A G. Dempster, B McKeown, S Saydam, J Coulton

    The mining industry has undergone a profound and transformative shift in recent years, driven by the rapid advancement of emerging technologies such as automation, digitalisation, and electrification.

    Sep 1, 2024

  • AUSIMM
    Technical Note on the Application of Dynamic Programming to the Optimum Open Pit Limit Problem

    By Giannini L. M

    A method using dynamic programming for solving the optimum pit limit problem was presented in an earlier paper. A recent issue of this journal contained some contributed discussion on the implementati

    Jan 1, 1987

  • AUSIMM
    High ?Magmatic Gold Abundances in Unaltered High-Titanium Ferrobasalts fro the Hermit Islands, Papua New Guinea

    By Till M, McGee WA

    The Hermit Islands are situated at 145¦ E 1 30'S in the Bismarck Sea approximately 200km WNW of Manus Island. They are dominated by basalt flows, one of which yielded a K/Ar isotopic date of 3.4

    Jan 1, 1990

  • AUSIMM
    Bleg: A Geochemical Tool in the Great Sandy Desert

    The BLEG (Bulk Leach Extractable Gold) technique is a semiquantitative measure of cyanide extractable gold contained in a sample. A 5kg sample is leached in cyanide solution for 24 hours and gold

    Jan 1, 1988

  • AUSIMM
    Application of the Distinct Lattice Spring Model on Toppling Failure of a Jointed Rock Slope

    By N Khalili, J Zhao, G F. Zhao

    Toppling failure of a jointed rock slope was studied by using the distinct lattice spring model (DLSM). Compared with the classical discrete element model, the DLSM has the advantages of free calibrat

    Nov 5, 2014

  • AUSIMM
    Three-Dimensional Modelling of the Central Extended Gold Deposit - Analysis of Structural Controls on Mineralisation

    The Central Extended Orebody is located within the Cracow Goldfield approximately 360 km northwest of Brisbane and approximately 220 km west of Bundaberg. It is an epithermal gold deposit hosted by th

    Jan 1, 1993

  • AUSIMM
    A Computer-Based Geolog/Assaylog System For Coal Exploration And Evaluation

    By Coxhead B. A, Brandt B. A

    The geological exploration and evaluation of coal reserves involves the appraisal of very large amounts of data. Computers afford an ideal means of handling and manipulating the data, thereby avoid

    Jan 1, 1977

  • AUSIMM
    Systhesis of Stochastic Recovery Prediction Cut-off Optimisation

    By Vassiliev P

    Cut-off optimisation, based on the work of Lane (1988), can be used to maximise the NPV (Net Present Value) of a mine by the judicious manipulation of cut-offs and the use of stockpiles. Apart from

    Jan 1, 1998

  • AUSIMM
    Determining the Effect of Clay Minerals on Coal Flotation Using Saline Water

    By Y Peng, D Liu, S Vink, B Wang

    There have been strong industrial observations that clay minerals have a deleterious effect on mineral flotation grade and recovery. However, rigorous explanation on the role of clay minerals in flota

    Oct 29, 2012

  • AUSIMM
    Optimising the Telfer Pyrite Regrind Circuit – Effect of Dissolved Oxygen Demand

    By D R. Seaman, B Adamson, P Sharman, M McMahon

    "The Telfer processing plant commissioned its pyrite regrind and flotation circuit in August 2012. The circuit was designed to regrind pyrite concentrate to a p80 of <30µm then float a gold

    Oct 10, 2016

  • AUSIMM
    Pipe Jacking Experience in Tunnelling Through Variable Soils, Brisbane, QLD.

    By Baczynski NR, Fagan MJ

    A 3050m long section of a 1.65m internal diameter tunnel is presently under construction in the Brisbane area by means of the pipe-jacking method. The soils along the alignment had been deposited

    Jan 1, 1987

  • AUSIMM
    Control of Water Pollution

    The hydrological cycle in nature, with particular reference to Australia . 2. The definition of water pollution drawing on the experience of several major countries. 3. A description of the pollutan

    Jan 1, 1971