Mine Planning and Grade Control - GoldsworthyBy Newman H. A
Goldsworthy Mining Limited is currently mining iron ore at an annual rate of 7 million tons from several small orebodies, each of which exhibit wide variations in iron, phosphorus, silica and alumi
Jan 1, 1973
-
The Design of Pre-split BlastsEffective pre-splitting is a key feature of wall control blasting. Most mining operations use historical designs or rules-of-thumb for designing pre-split blasts. If productivity and safety benefits
Jan 1, 1995
-
Geotechnical monitoring at the Porgera MineBy Yambu J, Titus K
Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic
Jan 1, 1994
-
Production Blasting Practice at Hamersley Iron Pty. LimitedBy Kaleta S, McTavish LP, Turner RD
Primary production blasting at Hamers- ley Iron began with seven inch holes at Tom Price in 1966 and has developed since then to large multiple row shots of 381 mm holes at Tom Price and 311 mm at
Jan 1, 1978
-
Revegetation of Mine Rockdumps Using Indigenous Mosses and Other Pioneer PlantsBy P Alspach, R Buxton, C Morgan, C Ross
Mining companies worldwide have an increasing interest in restoring indigenous ecosystems following mining. Low levels of plant nutrients and organic matter, pH extremes, heavy metals, physically chal
Jan 1, 2003
-
Townsville Copper RefineryBy Saint-Smith J. C
The anode, tank house and wire bar plant and operations are described with particular reference to those features of design and methods which are characteristic of this refinery at its inception.Refer
Jan 1, 1961
-
Digital Simulation Model of Sub-Level CavingBy Ham G. I, Just G. D
The model considers a range of design parameters and operating condit- ions and evaluates the significance of these in the ultimate design of a mine. It also considers organizational features associ
Jan 1, 1974
-
Coarse Coal Rejects-A Costly Waste or a Valuable Resource?The current quantity of rejects from coal beneficiation in Australia represents 20 to 25% of raw black coal production. Approximately 80% of the rejects are derived from coarse processing for part
Jan 1, 1987
-
Electromagnetic Testing of Mine Winding Ropes û The Field Pattern of an Internal Broken WireWith the recent wider introduction of friction hoists of the Koepe type. for winding from depths of more than 3000 feet it has been found that failure by fatigue is the most common form of rope det
Jan 1, 1971
-
Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil WaterwaysBy M D. Melville, B C. T Macdonald, T D. W
The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T
Jan 1, 2003
-
Computerised Geological and Mining Ore Reserve Systems at Western Mining Kambalda Nickel OperationsBy Gee C. E
Ore reserves at the Kambalda Nickel Operations of Western Mining Corporation are estimated using the polygonal method for calculating areas of influence of drillholes. All raw assay and survey data
Jan 1, 1977
-
Resource Model Uncertainty at the Yandi Channel Iron Deposits, Western Australia ù An Application of Multiple-Point Simulation for Orebody GeologyBy R Dimitrakopoulos
The development of mineral resources is based on a spatial model of the orebody that is only partly known from exploration drilling and associated geological interpretations. As a result, orebody mode
Jan 1, 2007
-
The Contribution of Geological Surveys to Mineral Exploration in AustraliaIn this year marking the centennial of the Geological survey of Western Australia, it is appropriate that we should review the value of the contribution of the Survey, and Australian Geological Su
Jan 1, 1988
-
Regeneration of 2-Naphthol from Cobalt PrecipitateBy Haigh C. J
A process has been developed to recover at least 75% of the 2-naphthol contained in cobalt precipitate produced during the removal of cobalt from electrolytic zinc plant solution. The recovered mat
Jan 1, 1977
-
Effects of FeO/SiO2 ratio and optical basicity on viscosity and melt structure of FeO–SiO2–Al2O3–CaO–MgO–Cr2O3 meltsBy C Samuelsson, Q Shu, A Lennartsson, F Gyakwaa, A Andersson, J Isaksson
The physico-chemical property, viscosity, is essential for pyrometallurgical processes and influences the settling rate of valuable metal droplets in slag, affecting the metal recovery. The copper sla
Jun 19, 2024
-
Modelling of the Sala Agitated Mill (SAM) Using BRGM Pilot Plant DataBy Olofsson O, Durance M-V, Villeneuve J
Modelling of the Sala Agitated Mill (SAM) using a simplified solution to the population balance approach has been carried out. The rate of breakage is modified by the mill power, providing predictio
Jan 1, 1995
-
Historical Perspective and Future Projection of Longwall Mining in the United StatesThis report chronicles the historical development of longwall mining in the United States and speculates on future developments to the turn of the century. Five eras of technological development
Jan 1, 1992
-
Paper No. 187. Roasting Sulpho-Telluride Gold Ore at The Kalgurli Gold Mines LTD.To obtain the best economic results in treating the comparatively high-grade ore of the Kalgurli Mine a good roast is essential, and the effort of this paper will be to briefly describe the plant and
Jan 1, 1911
-
Exposing Uncertainty in Schedules for Proactive Stockpile PlanningBy C Standing, R Lacourt Rodrigues, C Q
The value of iron ore depends on the grade of the contaminants. Scheduled iron, and the associated contaminants, provides mine planners with a measure of stockpile feed and blending requirements. Blen
Jan 1, 2005
-
The Application of Numerical Modelling to the Assessment of the Potential for, and the Detection of, Spontaneous Combustion in Coal MinespNumerical modelling has been used to examine the relationship between the results of two commonly used methods of assessing the propensity of coal to spontaneous combustion, the R70 and Relative Igni