Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Pilot Plant Treatment of Waste Liquors at Risdon

    In 1975, following a programme of solution characterization and small scale laboratory test work, a pilot plant was constructed to treat waste liquors from the Risdon works. The plant was designed

    Jan 1, 1977

  • AUSIMM
    A User-Oriented, Mini Computer Based System for Open Cut Coal Mine Planning

    By Van Hoorn PD

    For the development of BHP's Gregory open cut coal mine in Central Queensland a mini computer was successfully used to assist staff in the evaluation of the deposit and the planning of the mi

    Jan 1, 1978

  • AUSIMM
    Weighing of Open Cut Machinery

    An improved technique for the quick and accurate measurement of the weight and centre of mass in the horizontal plane of large machines has been developed. On-site weighing of large plant such as bu

    Jan 1, 1989

  • AUSIMM
    Automated Open-Cast Scheduling Systems ù the Namakwa Sands Solution

    Brand se Baai, on the North-Western Cape Coastline of Southern Africa, is the site of the Namakwa Sands Limited Heavy Mineral Sands Mining Operation. The mine is a 14 000 000 tonnes per annum open-cas

    Jan 1, 2003

  • AUSIMM
    Gold Deposits of the Goldstrike Mine, Carlin Trend, Nevada

    By Lauha E. A

    The Goldstrike Mine is in Eureka County, Nevada, U.S.A., approximately 23 miles northwest of the town of Carlin. The mine is at the north end of the Tuscarora Spur of the Tuscarora Mountains at elev

    Jan 1, 1991

  • AUSIMM
    Coal - Paper No. 11 Various Interpretations Of Coal Petrographic Nomenclature And Their Effects On Maceral Analysis

    By Diessel C. F K, Ng N

    The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific refere

    Jan 1, 1969

  • AUSIMM
    Excavating a Tunnel in the Foothills of the Southern Alps of New Zealand

    By E Giles

    Pike River Coal Limited (PRCL) is opening a new underground coal mine in the Paparoa Ranges north-east of Greymouth. To access the coal reserves, PRCL have had to build a 13 km access road through reg

    Jan 1, 2008

  • AUSIMM
    Geostatistical, Spectral and Fractal Simulation of Sulphur Distribution in a Coal Seam

    By Ramani R. V

    In this paper, a comparative performance evaluation of geostatistical, spectral, and fractal methods is made for short-scale variability prediction. The algorithms compared are: sequential Gaussian

    Jan 1, 1995

  • AUSIMM
    Studies in Size Separation by Screening

    Laboratory studies of batch and continuous screening of ferrous sinter mixtures (4-0.5 mm) are described. The results are analysed by an equation derived from the first-order rate law for the conditio

    Jan 1, 1985

  • AUSIMM
    In - Pit Crushing and Conveyor Transportation of Coal at Ulan

    Initial coal production at Ulan was solely from underground mines. A significant increase in demand for steaming coal in the late 1970's emphasised the need to further expand production and led t

    Jan 1, 1985

  • AUSIMM
    Evaluation of rock joint on construction tunnel face using convolutional neural network

    By H Kusumi, A Nishio, K D. Halim, Y Yun

    In Japan, evaluation of rock mass is crucial in mountain tunnels that are constructed using the NATM (New Austrian Tunneling Method) to determine the support pattern that in turns determine the final

    Nov 29, 2022

  • AUSIMM
    Open Circuit Disc Balling At Hamersley's Dampieer Pelletizing Plant

    The considerations which led to the decision to_ install discs at the Dampier Pellet Plant of Hamer ley Iron Pty. Ltd. are described. Initial testwork showed that the ore could be ground dry in ope

    Jan 1, 1974

  • AUSIMM
    Damage to Open Pit Slopes

    There is considerable economic incentive to increase the angle of open pit walls so as to reduce the total volume of waste to be moved to gain access to an orebody. However, a number of slope failures

    Jan 1, 1992

  • AUSIMM
    How to Develop a Project

    The most critical step in the development of any mining project is the completion of a feasibility study. The feasibility study has one primary goal; to demonstrate that the project is economically

    Jan 1, 1997

  • AUSIMM
    A Numerical Approach for Prefeasibility Analysis of Tailings Disposal Options

    By B Muller

    The disposal of tailings has become a greater issue due to the changing economics of mineral extraction. The processing of lower grade deposits and tougher environmental regulations has led to the sel

    Sep 26, 2011

  • AUSIMM
    How to Cope with Cutter Roof Problem

    This paper presents results of the experiments carried out in Beth Energy No. 33 Mine for the purpose of alleviating problems associated with cutter roof. Cutter roof problems have delayed the adva

    Jan 1, 1992

  • AUSIMM
    A Bounding Surface Model for Sand Subjected to Blast-induced Vibrations

    By L M. Zhang, T H. Xu, J Zhao

    Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc

    Nov 5, 2014

  • AUSIMM
    Block Model Data Reduction and Sensitivity Analysis

    By J E. Everett

    Maximising ore tonnage at a selected target grade requires that appropriate ore identification criteria be established. Iron ore mining block models may consist of many millions of estimated blocks, e

    Jul 13, 2015

  • AUSIMM
    New occurrence of banded iron formations in the Minvoul Region, Ntem Complex (Northern Gabon)

    By M Iglesias-Martínez

    The potential for iron ore in the Central African Archean belts has received much less attention by comparison to their equivalents in other cratonic regions of West Africa, South Africa, Australia an

    Sep 18, 2023

  • AUSIMM
    The Use of Feeders and Flow Promotion Devices in Gravity Storage Systems for Bulk Solids Hanlding

    By Roberts AW

    Bulk materials handling operations depend on efficient storage and gravity flow facilit- ies. ,It is important that proper attention be given to the complete storage bin or stockpile and feeder com

    Jan 1, 1978