Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Some Comments on How Mining Departments and Schools Can Survive a Cyclic DownturnBy S Thomas, E Grimsey
Mining education in Australia has undergone another cyclical downturn over the past five years and several departments have been discontinued while others are still teetering on the brink of destructi
Jan 1, 2004
-
Temporary Support Design for the Largest Road Caverns Ever Built in Australia – The Lutwyche CavernsBy N McKenzie, E Taylor, S V. L Barrett, H Lagger, A Purwodihardjo
This paper discusses the temporary support design methodology for the largest road caverns ever built in Australia—the Lutwyche Caverns—part of the Airport Link project in Brisbane, Australia. The Lut
Sep 17, 2014
-
A Spatially Enabling Relational Geologic Database of Java Island,Western Sunda Arc of Indonesia ù A Step to the Geoscience and Mining Data ModelBy K Watanabe
A relational database in which its complex contents can be navigated through a map interface (ie spatially enabling) is relatively a new concept yet attractive for geoscience fields. This concept is m
Jan 1, 2004
-
Managing the Giant – A Mine Geologist’s Perspective to the Mining of the Olympic Dam DepositBy M K. Kapo, S C. Nzama
The success of a mining operation depends on the quality of data used in decision-making processes and the people involved in making operational decisions. At Olympic Dam, mine geologists form an inte
Aug 18, 2014
-
The VALMIN Code and Tenure Compliance – Not Just a ListBy J Evans-Wheeler
"The mandate of the 2005 VALMIN Code to provide ‘(all) reliable, thorough, understandable material information required by investors and their advisers when making investment decisions’ requires that
Mar 8, 2016
-
Use of a Modified Comminution Index to Predict Bond Work Index and SMC A*b at the Antamina Mine, PeruBy T Kojovic, S J. Windle, J Sullivan
"The Geometallurgical Mapping and Mine Modelling (GeM) comminution index (CI) was developed as part of the AMIRA P843 GeMIII project. Drill core geochemistry samples were passed through a Boyd Crusher
Jun 15, 2016
-
Importance of Early Rehabilitation Planning - Case Studies from North West QueenslandBy M J. Gillespie, P D. Erskine
Mine site rehabilitation generally includes the re-shaping of overburden to create a final landform, manipulation of substrates and subsequent revegetation. Due to the wide range of environmental vari
Jul 10, 2012
-
Off to a Good Start with Lift #2: Drawbell Extraction ù NorthparkesBy M Lovitt, T Hewitt
The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside
Jan 1, 2005
-
Treasure Islands - Second EditionThe Pacific Rim countries ofAustralia, New Zealand, Papua New Guinea, Indonesia, Fiji, Philippines and Solomon Islands will be reviewed from an equity investors perspective. The following areas
Jan 1, 1995
-
Geology of Perseverance Nickel Deposit, Western AustraliaBy Alichurch P. D
Perseverance nickel deposit is located at latitude 27¦ 491S, longitude 1200 42'E, 330 km north of Kalgoorlie, Western Australia. Gossanous outcrops were discovered in April, 1971, and after fur
Jan 1, 1973
-
Iron Ore Tailings Reprocessing to Maximise Ore ProductionBy I Sherrell, R Jain
Worldwide iron ore feed grades are trending downwards and will continue to do so with the increasing difficulties of upgrading ores. This has led to operations looking for ways to capture current tail
Jul 13, 2015
-
The Wonawinta Silver Project – Value Engineering at WorkBy P G. Greenhill
The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con
Aug 8, 2011
-
Contemporary Criteria of Open Pit Long-Term Production SchedulingProduction scheduling of open pit mining is a key area as it deals with the management of operating cash flows of mining companies. The efficiency of long-term schedules is usually assessed with econo
Sep 26, 2011
-
Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?By E J. Cowan
Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore
Aug 22, 2011
-
Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in MelbourneBy I Lamb
Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline
Mar 8, 2011
-
Engineering the New Olympic Dam Backfill SystemBy A G. Grice
WMC Resources Pty Ltd û Copper Uranium Division operates the large underground Olympic Dam Mine at Roxby Downs, South Australia. These operations mine and process the ore to produce refined copper, ur
Jan 1, 2000
-
Preparing Mining Engineers for the e-WorldBy M Boyd
The University of Wollongong was named University of the Year 2000, for its work in preparing students for the e-world. Computer facilitated learning is being introduced into subjects throughout the e
Jan 1, 2002
-
Implementing a New Heuristic Approach to the Underground Mine Stope Layout ProblemBy M W. A Asad, E Topal, D S. S Sandanayake
Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod
Nov 24, 2014
-
Exploration and Innovation – The Discovery and Evolution of the 2 Moz Vogue Gold Resource, Sunrise Dam Gold Mine, Western AustraliaBy T Blenkinsop, A Jenkins, H Moore, L Fisher, N Oliver, J Cleverley, M Nugus, J McLellan, J Hill, N Brunacci
The 2 Moz Vogue mineral resource is a recent discovery at the Sunrise Dam gold mine (SDGM), lying approximately 600 m vertically below the Sunrise Dam open pit. Unlike most other lodes, which are domi
Aug 18, 2014
-
The Development of the Aircore Sampling SystemBy J M. Wallis
Heavy mineral sand exploration drilling prior to the 1970s generally utilised open hole auger and air-blast type drilling. However, mining reconciliations were poor and limitations on accuracy and pre
Oct 5, 2011