Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    Proneness of competent over-stressed intact rock to violent fracturing

    By B L. Sainsbury, M F. Lee, A Penney

    For most practical rock engineering purposes, stress versus strength conditions around underground openings for which rock masses fail and their various modes of failure, are reasonably well-understoo

    Nov 30, 2018

  • AUSIMM
    Recognising the deficiencies of current spontaneous combustion propensity index parameters

    By B B. Beamish, J Theiler

    Current spontaneous combustion index parameters such as SHT, CPT/RIT and R70 self-heating rate all have deficiencies that need clarifying from a risk management perspective. In some instances they can

    Aug 28, 2017

  • AUSIMM
    Using Best Practice Operations as a Strategy for Attracting and Retaining Professional People

    By T Trott, G Lumley

    "The mining industry suffers from a shortage of professional and other workers. Research and analysis has demonstrated a close correlation between high performance in productivity, maintenance and saf

    Nov 20, 2012

  • AUSIMM
    Commissioning Under a Microscope ù The Cawse Nickel Start-Up

    By R Young, D OÆSullivan

    When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj

    Jan 1, 2001

  • AUSIMM
    Geology, Mineralisation and Alteration of the Tuwu-Yandong Porphyry Cu Deposit, North-west China

    By B Xiao, J Yang, H Chen

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Tuwu-Yandong Cu deposit, located in the East Tianshan mountains in the eastern section

    Mar 18, 2015

  • AUSIMM
    Detachment of Particles from Bubbles in a Stirred Cell

    Detachment of Particles from Bubbles in a Stirred Cell

    Sep 13, 2010

  • AUSIMM
    Advanced mine to mill application at the Barrick Cortez mine

    By J Young, S Yu, P Moyo, M Powell, A Musunuri, B Bonfils, S Kanchibotla, P Yaroshak, V Jokovic

    The appropriate design of liners continues to be an issue on many mills worldwide. Loss of milling capacity especially at liner change, uneven wear lives along the mill, substantial scrap on worn line

    Aug 29, 2018

  • AUSIMM
    Gaseous products of weathered coal during the process of spontaneous combustion

    By Y Zhang, X Yi, J Deng, J Zhao, J Song

    To obtain the combustion process of a coal fire, a high-temperature programmed system is used to simulate the spontaneous combustion process of fresh and weathered coals. Both fresh coal and weathered

    Aug 28, 2017

  • AUSIMM
    Findings from a transient electromagnetic trial for heat-affected coal

    By H J. Stedman

    A Transient Electromagnetic (TEM) geophysical survey was trialled in Bowen Basin Permian coal measures overprinted by Cretaceous intrusion. The trial’s intention was to compare whether TEM could asses

    Sep 20, 2017

  • AUSIMM
    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values

    Characterisation and Processing of Electronic Waste for the Recovery of Metal Values Electronic waste (e-waste), which is a hazardous waste, can indeed be a good source of metal values especially for

    Sep 13, 2010

  • AUSIMM
    The Aluminium Smelter at Tiwai Point

    My speech this morning is not a technical one, rather I will aim to tell you about the New Zealand Aluminium Smelters Limited and how I see it fitting into the Western World aluminium scene.

    Jan 1, 1983

  • AUSIMM
    Keeping up with the Joneses – the value of industry surveys and benchmarking

    By T D. H McGrath, W P. Staunton

    Benchmarking, comparing an operation or process with the industry standard, is known to be a useful method for identifying plant optimisation opportunities, and in many cases providing the pathway to

    Aug 29, 2018

  • AUSIMM
    Verified Stability Modelling of Highwalls

    By D Fergusson, J D. St George

    Highwall stability is a major consideration in optimising opencast mine geometry. It involves assessing the risk of those slope failures that are large enough to have significant cost, safety and/or o

    Jan 1, 2006

  • AUSIMM
    The effect of high geo-temperature environment on spontaneous combustion – an experimental study

    By Y Xiao, C Lei, C Shu, W Wang, K Wang, J Deng

    To investigate the effect on coal spontaneous combustion with high geo-temperature, an experimental apparatus was developed to measure characteristic parameters of two kinds of coal samples at differe

    Aug 28, 2017

  • AUSIMM
    Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore

    Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore

    Sep 13, 2010

  • AUSIMM
    Private Coal Mining in the Waikato

    Coal mining in New Zealand is principally a State-owned and controlled operation where the State produces 70 per cent of the coal in New Zealand and 65 per cent of coal mined in the Waikato. The State

    Jan 1, 1984

  • AUSIMM
    Using DEM to Model Industrial Banana Screens

    Using DEM to Model Industrial Banana Screens

    Sep 13, 2010

  • AUSIMM
    The Effect of Ionic Strength of Plant Water on Valuable Mineral and Gangue Recovery in a Platinum Bearing Ore from the Merensky Reef

    The Effect of Ionic Strength of Plant Water on Valuable Mineral and Gangue Recovery in a Platinum Bearing Ore from the Merensky Reef

    Sep 13, 2010

  • AUSIMM
    Underground Mining at the Golden Cross Mine

    The modern Golden Cross mine entered the production phase in January 1992. The project is designed to produce over 100 000 oz/yr of gold and over 300 000 oz/yr of silver during a mine life of eight ye

    Jan 1, 1994