Search Documents

  • SME
    Prediction of Blast‑Induced Ground Vibration Using Principal Component Analysis–Based Classification and Logarithmic Regression Technique

    By M. P. Roy, P. K. Singh, A. K. Mishra, Ashish K. Vishwakarma, Vivek K. Himanshu

    Ground vibration is one of the major hazards produced by rock-blasting operation. The accurate prediction of vibration is necessary for designing controlled blasting parameters. The existing vibration

    Jul 30, 2022

  • AUSIMM
    Noise Reduction in Compressed Air Driven Fans

    The development of a noise attenuated compressed air driven fan is described. The fan, which employs the jet reaction principle, possesses blade extension pieces which penetrate into an acoustically t

    Jan 1, 1973

  • IMPC
    The Next Step In Mineral Processing Plant Dynamic Simulations To Achieve The Necessary Standard For Prefeasibility And Feasibility Studies - Modeling With Discrete Event For Maintenance Combined With Accurate Continuous Process Modeling

    By John A. Herbst

    The Mineral Processing Industry needs accurate Production Simulators for the design of future plants and expansions. To achieve this, these simulators should not only provide an accurate portrayal of

    Sep 1, 2012

  • SME
    A review on potash recovery from different rock and mineral sources

    By SANDEEP KUMAR JENA

    This paper reviews the recovery of potassium from different rocks and mineral sources. Global demand for potassium is rising steadily due to the growth of agricultural production. Fertilizer manufactu

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989

  • NIOSH
    MLA 14-93 - Identified Mineral Resources Of The Needles 1°X 2° Map Quadrangle, California

    By Terry R. Neumann

    This document, prepared for the U.S. Bureau of Mines Regional Mineral Assessment Program, presents data pertinent to the mineral resource assessment of the Needles 1° x 2° map quadrangle (excluding th

    Jan 1, 1993

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • SME
    A New Approach for Hang‑Up Prediction in Block Caving Mines Based on Drawbell Geometry and Vertical Stress

    By Roberto Fustos, Gonzalo Nelis, Víctor Sanhueza, René Gómez

    Hang-ups are a challenging operational problem in block caving mines. They interrupt ore flow and imply hang-up removal activities, which take time, increase operational costs, and involve safety risk

    Oct 15, 2022

  • NIOSH
    IC 8702 Time Required In Developing Selected Arizona Copper Mines

    By Lorraine B. Burgin

    This study by the Bureau of Mines documents the leadtime required for preliminary and detailed exploration, development of the mine, and construction of beneficiation and support facilities for select

    Jan 1, 1976

  • SAIMM
    How Electronics Can Release the Imagination

    By G. V. R. Landman

    It is self-evident that economic pressure demands that today?s mines stay ahead and stay competitive. The challenge, however, isto find fresh approaches to the pursuit of efficiency and operational ef

    Jan 1, 2010

  • SAIMM
    A review of readiness assessments for mining projects

    By H. Mulder, M. C. Bekker

    The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and

    Jul 2, 2022

  • AUSIMM
    Pilot-Scale Kiln Processing of New Zealand Ilmenite

    By Mills R, Shannon W. T, Finch J

    As an extension to investigations into methods of upgrading the Iitania content of ilmenite concentrate from beach sands using 100 g/day, a small pilot plant treating 23 kg/ day of ilmenite was used.I

    Jan 1, 1977

  • NIOSH
    IC 9273 A Review Of Water-Jet-Assisted Rock Cutting

    By Michael Hood

    High-volume, low-pressure water jets have been employed for erosion of loosely consolidated rocks for centuries. This excavation method finds application in specialized circumstances even today. The u

    Jan 1, 1990

  • NIOSH
    RI 4699 Organic Sulfur In Synthesis Gas: Occurrence, Determination, And Removal

    By A. E. Sands

    This report deals with a portion of the research and development work in the field of synthesis gas purification, carried out by the Bureau of Mines at its Morgantown, W, Va., Station in cooperation w

    Jan 1, 1950

  • SME
    Is The Mining Industry Ready To Go Green?

    By Michele Ashby

    The mining industry is facing new risks from peak commodities, the energy and economic crisis and stock market pressures. The Green Mining Industry Initiative is a risk management strategy for the fut

    Jan 1, 2008

  • AUSIMM
    Subsidence from Deep Longwall Mining of Coal Overlain by Massive Sandstone Strata

    Mining is taking place at increasing depths of cover on the Southern Coalfield beneath predominantly massive sandstone strata. Within the next twenty years, there will be longwall mining at depths gre

    Jan 1, 1982

  • TMS
    Local Thermal Property Analysis By Scanning Thermal Microscopy Of Ultrafine-Grained Surface Layer In Copper And In Titanium Produced By Surface Mechanical Attrition Treatment

    By F. A. Guo

    Ultrafine-grained surface layers were obtained by surface mechanical attrition treatment (SMAT) in copper and titanium samples. The thermal properties of the deformed layers were characterized using a

    Jan 1, 2006

  • IOM3
    Kinetics of reduction of metal values from fayalite-based slags - part 2: modelling of idealized slag-cleaning conditions

    By B. S. Terry, C. L. Harris

    Reduction kinetics from slags containing CuO(0.5), ZnO, PbO, NiO and SnO into a Cu-based metal phase were subjected to computer simulation using a previously developed model for the kinetics of metal-

    Aug 1, 1995

  • CIM
    A methodology for rock mechanics feasibility studies

    By Dave Ecobichon, Éric Côté, Simon Nickson, Michel Leclerc

    The feasibility assessment of a mineral deposit requires the construction of a geo mechanical model of rock mass properties, for the purpose of preliminary mine design. The Noranda Technology Centre h

    Jan 1, 1996

  • CIM
    Nucleation Overpotential and the Role of Nucleation Early and Late in a Deposition Cycle

    By Peter A. Adcock, Rob Fraser

    Interest in monitoring nucleation overpotential in electrometallurgical processes dates back some 40 years or more. Conversely, remarkable progress has been made in recent years on describing in detai

    Jan 1, 2016