Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Preliminary Geotechnical Assessment for Re-Opening the Blackwater MineBy J Taylor, L Richards, M McKenzie
When a collapse in its services shaft caused rapid gas build up and its premature closure in. 1951, the Blackwater Mine at Wiauta was in full production with significant ore reserves yet to be mined.
Jan 1, 1996
-
Environmental assessment: a new experienceBy I. J. Brown
Paper prepared for presentation at Industrial minerals and the environment, held in Leeds, 24-35 September 1990. The need to submit an environmental statement (EIS) has certainly increased the workloa
Jan 1, 1991
-
A critical evaluation of the waterreticulation system at Vlaklaagte Shaft, Goedehoop CollieryBy R. Lombard
"Water is a very important component in the production process at underground coal mines. Current unfavourable economic conditions have forced the coal mining industry to identify and address every po
Jan 1, 2015
-
Driving Headings In Rock Tunnels.By W. L. Saunders
(New Haven Meeting, February, 1909.) This paper deals specifically with heading-driving as distinguished from the broader term tunnel-driving. A heading is a pilot or path-finder for the main tunnel.
Apr 1, 1909
-
PPP Contract Delivery System- Contractual Risks and Ethical Issues Regarding Deep Foundation SubcontractorsBy Alexander Filotti, Richard Kalson
"1. INTRODUCTION- WHAT IS P3 OR PPP ?The Public Private Partnership (PPP or 3P) is a project delivery scheme based on the government providing land and/or a concession agreement, and on a private enti
Jan 1, 2017
-
Optimising Metallurgy at the Planning Stage to Minimise Environmental Impact - A Feedback Loop from Geochemical Waste CharacterisationBy P Mulvey
"Currently mine process studies and geochemical waste characterisation are considered as two interdependent studies, necessary for the development of the mine and inclusion in the environmental impact
Jul 15, 2013
-
Studies On Application Of Dense Medium Cyclone For Beneficiation Of -2 + 0.1 mm Size Coal Obtained From An Open Cast Mine Of Jharia Coalfield, IndiaBy Anand Anupam
Conventionally, beneficiation in Indian coal washeries is done using dense medium cyclones upto the size of 0.5 mm. Coal fines below 0.5 mm size are extensively cleaned by froth flotation. There are m
Sep 1, 2012
-
Copper mineralization in the Patawarta Diapir, northern Flinders Ranges, South AustraliaBy Both R. A, Daily B
The Patawarta Diapir, located in the northern Flinders Ranges (South Australia), has intruded into late Proterozoic Wilpena Group sedimentary rocks. The diapir contains disrupted blocks of a wide vari
Jan 1, 1986
-
Fully-Grouted, High-Strength, Mechanical Shell Tensioned Bolt Improves Pittsburgh Seam Primary Roof SupportBy Daniel Su
Approximately 90% of the primary roof bolts used in CONSOL?s Pittsburgh seam coal mines is 2-piece, 8-foot long, 7/8? (or ¾?), high-strength, resin assisted, mechanical shell tensioned bolt. The remai
Jan 1, 2007
-
Pros And Cons Of Mineral Exploration In Canada - A Banker?s ViewpointBy Donald J. Worth
When Eugene Bailey asked me to contribute to this session on "Canadian exploration - 1976", it took a little coaxing before he got me to agree. My immediate reaction was, what could i say about Canadi
Jan 1, 1976
-
El yacimiento Tres Cruces y la evolución de sus modelos genéticos de geología económicaBy David Heyl
"El presente texto señala la evolución de los modelos genéticos de geología económica del yacimiento minero Tres Cruces. Dicho yacimiento se encuentra localizado en el noreste del Perú, adyacente al d
Apr 26, 1999
-
S-Load CartridgeBy Marco Larghi, Jurg Knobel, Braden Schmidt
Remote Avalanche Control Systems (RACS) which uses solid explosives has been used in Europe since 1996 and North America since 1999. With large destructive avalanches in transportation corridors, vari
Feb 1, 2020
-
OFR-35-87 Systems Approach To Mine Fire SafetyBy Jeffrey A. Shibe
A prototype Fire Safety Evaluation System has been developed and is ready to be evaluated by a Peer Consulting Panel and for performing field tests. The system can be used to determine combinations of
Jan 1, 1987
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Initial Testing of a Speed of Sound Test Apparatus for Powdered ExplosivesBy Barbara Rutter, Shonn Kevin McNeil
"This study discusses how a prototype was built to measure the sonic velocity in powdered explosives.The sonic velocity of an explosive is a benchmark to determine if the explosive deflagrates or deto
Jan 1, 2017
-
Assessment of equipment operator?s noise exposure in western underground gold and silver minesBy Ellsworth R. Spencer
An assessment of U.S. western hardrock miners? noise exposures was conducted as part of a multi-year National Institute for Occupational Safety and Health (NIOSH) survey of noise exposures in each sec
Jan 3, 2010
-
Journal impact factors – The good, the bad, and the uglyBy D. F. Malan
This paper provides an overview of the concepts of citations and journal impact factors, and the implications of these metrics for the Journal of the Southern African Institute of Mining and Metallurg
Sep 1, 2022
-
Analysis of the behavior of the weld mesh and the rolled mesh against static loads and a dynamic impact, to design the overlap according with the connection method. - RASIM2022By R. Brändle, R. Luis-Fonseca, R. Cornejo, G. Fischer, G. Von Rickenbach, J. Jarufe
Rock damage around underground excavations has been an important hazard in mines and tunnels. Rock dilation generates buckling that needs to be contained before it causes damage to equipment or safety
Apr 26, 2022
-
OFR-122(2)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume II - Appendix A - Equipment List, Specifications - And Quotations - Areas 1 - 7 ? IntroThis appendix contains the list of equipment selected for the capitol cost estimate, with the respective quotations from their vendors/manufacturers. A vendor response report along with a separate equ
Jan 1, 1979
-
Fault and Shear Characterisation in Archean Banded Iron Formation Bedrock - A Comparison between Core and Televiewer Data Collection TechniquesBy M Eggers, H Baxter
This paper discusses the geotechnical condition of bedding shears and small- and large-scale faults and shears in Archean banded iron formation (BIF) bedrock, based on observations of core and televie
Aug 12, 2013