Search Documents

  • SAIMM
    The manufacturing of nanoparticles with a plasma process - Synopsis

    By J. T. Nel

    Non-transfer-arc linear plasma systems are highly suited to manufacturing nanoparticles. In this paper, the manufacturing of such particles with specially designed plasma systems is discussed. In gene

    Jan 1, 2010

  • AUSIMM
    Development of mine intelligent ventilation technology in western China

    By S G. Li

    Mine intelligent ventilation is an important guarantee to realise intelligent mining. It is the integration of the Internet of Things, big data, artificial intelligence, internet, cloud computing with

    Oct 12, 2022

  • SME
    Allflux® Separator/A New Way To Process Your Heavy Minerals

    By P. Grotjohann

    In processing heavy mineral sands, the low feed concentration and respective high value of the desired minerals require high capacity production and sharp classification/separation techniques to reduc

    Jan 1, 1998

  • SAIMM
    The Development Of A Remote-Controlled Highwall Rockbroom?A World First For The Open-Pit Mining Industry ? Synopsis

    By D. van Rensburg

    Jointed rock slopes are generally stable, as there is no freedom of movement for blocks of rock. In an open- pit mining environment, blasting opens up space into which blocks of rock can fail, resulti

    Jan 1, 2012

  • DFI
    General Reports - Session 1 - General Report- Deep Excavations "He Who Pays The Piper Calls The Tune"

    By Tim Chapman

    This general report considers what promoters of deep basement projects want from their teams and whether they get it often enough. Most large projects are based on complex financial models where the f

    Jan 1, 2006

  • SME
    Engineering Geology Of The Mica Underground Powerplant

    By Douglas D. Campbell, Alan S. Imrie

    INTRODUCTION Mica Dam is located on the Columbia River just downstream of the "big bend" of the Columbia, where it leaves the Rocky Mountain Trench and begins to flow southwards, approximately 85 m

    Jan 1, 1976

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • NIOSH
    Gold Mining And Milling In The United States And Canada - Current Practices And Costs ? Introduction

    By Charles F. Jackson

    Gold mining is a subject that not only appeals to the popular imagination but has vital importance to the world's economic structure. However, a discussion of the use of gold as a medium of excha

    Jan 1, 1932

  • DFI
    Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles

    "1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am

    Jan 1, 2016

  • CIM
    Effluent Treatment with Toxicity Control at Placer Dome (CLA)’S Dome Mine

    By Trevor Yeomans, David Yaschyshyn

    "Placer Dome (CLA) operates the 90-year-old Dome Mine, in South Porcupine, Ontario.The milling operation currently processes 5 million tons of ore per year, from both the underground and Open pit mini

    Jan 1, 2001

  • SME
    Industrial Minerals 2007

    Editor?s note: Each year, the June issue of Mining Engineering features an industrial minerals review. Several people put in a fair amount of time in developing the material for this issue. Thank y

    Jan 1, 2008

  • SME
    Industrial Minerals review 2018

    By E. Lee Bray

    "Editor’s note: The editors thank those who make this annual issue possible. A special thank you goes out to the Industrial Minerals Annual Review editor, to the Industrial Minerals & Aggregates Divis

    Jul 1, 2019

  • TMS
    Improving Energy Efficiency in a Modern Aluminum Casting Operation

    By Mark Osborne, Ray D. Peterson, C. Edward Eckert

    "The theoretical melting energy requirement for a typical hypoeutectic aluminum-silicon alloy is approximately 520 BTU/lb. It has been demonstrated, however, that even a state of the art secondary pro

    Jan 1, 2009

  • AIME
    Sand Filling through Pipes and Boreholes

    By Lucien Eaton

    THE use of filling in mines is less common in the United States than it is in Europe, where in some places it is required by law. In most cases the filling is placed by hand, and the material used for

    Jan 1, 1932

  • NIOSH
    MLA 49-86 - Mineral Resources Of The Big Jacks Creek Study Area, Owyhee County, Idaho ? Summary

    By Richard A. Winters

    In 1985, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied 49,875 acres of the 54,833-acre Big Jacks Creek Wilderness Study Area (ID-111-7C) in order to evaluate t

    Jan 1, 1986

  • NIOSH
    Fire-Retardant Treatments Of Liquid-Oxygen Explosives - Acknowledgments

    By A. R. T. Denues

    This investigation was made under a cooperative agreement between the United States Department of the Interior, Bureau of Mines, and the Pittsburgh Testing Laboratory. Funds were supplied by the Chile

    Jan 1, 1940

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • IOM3
    Contrasting structural controls on gold mineralization along the Eldorado shear zone, Zimbabwe

    By P. E. J. Pitfield, S. D. G. Campbell

    The regional shear zone runs along or near the southern margin of the Chinhoyi greenstone belt. It hosts four of the seven mines in the southern part of the belt with recorded production above 100 kg

    Apr 1, 1996

  • NIOSH
    RI 9378 - Thermal Models of a Flame Arrester

    By John C. Edwards

    To increase the capability to predict the effectiveness of a flame arrester in the cooling of hot combustion gases expelled through a flame arrester, the U.S. Bureau of Mines developed an equilibrium.

    Jan 1, 2010

  • SME
    A Structural Interpretation Of The Garlock Fault Zone At The Tehachapi Crossing

    By Chester M. F. Peters

    The opportunity to make a close study of the available geologic data existing along the line of the California Aqueduct crossing of the Garlock fault in the Tehachapi Mountains was brought about first

    Jan 1, 1997