Search Documents

  • NIOSH
    RI 5899 Electric Smelting And Gaseous Refining Of Cement-Copper Precipitate ? Summary

    By F. E. Brantley

    Research was undertaken by the Bureau of Mines to assess the technical feasibility of smelting cement-copper precipitate in an electric furnace to produce commercial-grade copper. The blister-grade co

    Jan 1, 1961

  • DFI
    Regulations Of Construction Vibrations

    By Mark R. Svinkin

    Regulations are needed to keep construction vibrations in tolerable limits. The existing regulations were developed for low-rise residential structures, but they are incorrectly used for different sup

    Jan 1, 2006

  • CIM
    Teniente Converter- A Decade of Achievements at the Southern Peru Ilo Smelter

    By E. Herrera Alarcón, L. Mariscal Samaniego

    The Teniente Converter (wet charge type) was commissioned in august 1995 and was designed to smelt 744 tpd (metric tons per day) of dry copper concentrates. Its products are white metal (73% Cu) that

    Jan 1, 2007

  • IMPC
    Determination of Optimum Operating Conditions for Washing Mixed Coals by Using Spreadsheet Optimization Method

    By S. Mohanta

    In composite washeries optimization of operating parameters to achieve maximum clean coal yield at the desired clean coal ash level is a major problem. This problem is more acute in countries like Ind

    Jan 1, 2014

  • AUSIMM
    Past and Future Trends for Gold in New Zealand

    As in other countries, gold mining inNew Zealand has been cyclic in character. Looking at these cycles may provide insights as to what may occur in the future and that is the basis for this study. &nb

    Jan 1, 1994

  • ISEE
    A Preliminary Study into the Relationship between Air Overpressure and Face Velocity in quarry Blasting

    By W. J. Birch, R. Farnfield, L. Bermingham

    Whilst a significant body of research has been carried into air overpressure levels that arise as a result of the use of explosives, few published studies have actually tried to relate the movement of

    Jan 1, 2008

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Sampling and Waste Block Modelling for Acid Producing Waste Rock at Cadia

    By G Eastwood, C Joyce, P Ryan, G M. Johnston

    Over the years, predictive techniques for Acid Mine Drainage (AMD) and the natural processes affecting acid generation have received considerable attention. Less emphasis has been placed on the sampli

    Jan 1, 1996

  • AUSIMM
    Mine Hygiene at the North Mount Lyell Mine

    THE North Mount Lyell Mine is situated on the southern side of Mount Lyell at an altitude of 1750 ft. above sea-level. The average rainfall is 117 in., and there are generally several light falls of s

    Jan 1, 1927

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ABM
    The Use Of Plasma Torches In Blast Furnace Ironmaking

    By Nishit Patel

    Development work on the use of plasma torches in blast furnace ironmaking was completed in the 1980s. The technology developers planned to reduce blast furnace coke consumption using electrical energy

    Aug 17, 2017

  • AUSIMM
    Lead and Zinc Smelting Charges

    By Grey CA

    Any economic evaluation of a lead-zinc mining project requires the estimation of net revenue per tonne of concentrate at the "mine gate". The value at the mine gate equals the Net Smelter Return min

    Jan 1, 1990

  • NIOSH
    RI 5043 Synthetic Liquid Fuels. Annual Report of the Secretary of the Interior for 1953. Part I

    By BUREAU OF MINES

    This report is submitted in accordance with the provisions of the Synthetic Liquid Fuels Act of April 5, 1944 (30 U.S C. 321-325, as amended), which require that: "The Secretary of the Interior shall

    Apr 1, 1954

  • AUSIMM
    Comparison of Grinding and Liberation Processes for Stalky Biomass Materials as a Prerequisite for Production of Energy Pellets with High Calorific Value

    Comparison of Grinding and Liberation Processes for Stalky Biomass Materials as a Prerequisite for Production of Energy Pellets with High Calorific Value Pelletising biomass, especially straw and sta

    Sep 13, 2010

  • AIME
    Factors Governing the Separation of Lead and Zinc in Ore by Flotation

    By R. A., Pallanch

    SO many variations of lead-zinc ores occur in nature that it is impossible to state any rules that will apply to the concentration of ores of this type. Some have lead and zinc in approximately equal

    Jan 1, 1936

  • NIOSH
    RI 7142 Development Of A High-Temperature Interferometric Dilatometer Using A Laser Light Source

    By P. M. Johnson

    A design for a laser-powered optical interferometer, using a specimen whose thermal expansion is to be measured as part of the optical system, was conceived and applied in a prototype dilatometer. The

    Jan 1, 1968

  • NIOSH
    OFR-86-79 Control Technology For Diesel Equipment In The Underground Mining Environment -- A Review Of Selected Topics

    By Charles D. Wood

    "Selected Topics,? in reviewing the control of emissions from diesel engine powered equipment used in underground mining, explores these fields of interest: hydrogen as fuel; lubricating oil as a sour

    Jan 1, 1979

  • IMPC
    Effect of Hydrodynamic Conditions on Flocculation of Syncrude Oil Sand Tailings

    By X. S. Yuan

    With a demand for increasing energy efficiency and a need for improving bitumen recovery, a highly integrated solution for sustainable lease development of Aurora North of Syncrude has been proposed a

    Jan 1, 2014

  • SME
    Tenneco's Green River project : Foresight and patience pay off

    By David R. Delling

    Introduction In 1967, Tenneco acquired Kern County Land Co. The primary reason for the acquisition was to obtain Kern's agricultural, manufacturing, and oil interests. Included in the Kern portf

    Jan 10, 1985

  • AUSIMM
    Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western Australia

    By A Weeks, W J. Shaw, A Kuk

    Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra

    Aug 18, 2014