Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Control Mechanism of a Tensioned Bolt System in the Laminated Roof with a Large Horizontal Stress

    By Song Guo

    This paper will present the roof bolting finite element model developed at Jennmat Corporation used to study the control mechanism of the tensioned bolt system in the laminated roof with a large horiz

    Jan 1, 1997

  • SME-ICGCM
    Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal Seams

    By Zhaohui Wang, Jiachen Wang

    "Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h

    Jan 1, 2018

  • SME-ICGCM
    Letter Of Nomination

    By Dr. Daniel W. H. Su

    t is both an honor and privilege for me to nominate Dr. Daniel W. H. Su for the inaugural Syd S. Peng Ground Control in Mining Award. I can think of no better candidate than Daniel that is deserving

    Jan 1, 2006

  • SME-ICGCM
    A New Method For Longwall Pillar Design

    By P. Tsang

    In order to deal with ground control problems such as roof falls, floor heaves and pillar failures in underground coal mines, a new pillar design method based on the "yield pillar" concept is proposed

    Jan 1, 1993

  • SME-ICGCM
    Application Of RMT's Remote Reading Telltale System To Monitor Roof Movement During Face Retreat At West Colliery, Germany

    By David Bigby

    Rock Mechanics Technology has developed an intrinsically safe remote reading telltale system which allows up to 4 sets of 100 dual height, water diverting telltales in a mine roadway to be remotely mo

    Jan 1, 2003

  • SME-ICGCM
    Laboratory Testing of Rib Straps

    By E. Bane Kroeger

    Rib failure is a hazard that has resulted in many injuries and fatalities in underground coal mines, especially in soft coal seams. Conventional rib control methods including rib boarding, shotcreting

    Jan 1, 2004

  • SME-ICGCM
    Rib Access Boom for a Roof Bolter

    By Joe McQuerrey, William Kendall, Gene Wilson

    "Roof bolting is the standard for ground control in underground coal mining. Rib and truss bolting is just as important when conditions are less than desirable. As a manufacturer of roof drills, J.H.

    Jan 1, 2010

  • SME-ICGCM
    A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mine

    By T. J. McMahon

    This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from

    Jan 1, 1989

  • SME-ICGCM
    A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement ? A Case Study

    By Behdeen Oraee-Mirzamani

    Tunnel stability has an important role in the production process of an underground coal mine. There are various methods for analysing tunnel stability, such as numerical methods and analytical methods

    Jan 1, 2013

  • SME-ICGCM
    The Application Of Underground In-Seam Seismic Methods (UISS) To Map The Coal Seam Structure Across Longwall Panels

    By Rene Rodriguez

    The initial results of our investigations on the applicability of geophysical exploration methods to map coal seam inclusions were summarized in a paper submitted at the Thirteenth Conference on Groun

    Jan 1, 1995

  • SME-ICGCM
    Investigation into the Extent and Mechanisms of Gloving and Un-mixed Resin in Fully Encapsulated Roof Bolts

    Effective strata control, utilising fully encapsulated roof bolts, is dependent on the installed quality of the reinforcement elements. One mechanism by which fully encapsulated roof bolts may become

    Jan 1, 2003

  • SME-ICGCM
    The Radio Imaging Method (RIM) -- A Means Of Detecting And Imaging Anomalous Geologic Structures In A Coal Seam

    By Rodger Fry

    All coal deposits contain anomalous geologic conditions which have an impact on roof control, Run-Of--Mine (ROM) coal quality and production costs. To remain competitive in today's coal market an

    Jan 1, 1984

  • SME-ICGCM
    Ground and Standing Support Interaction in Tailgates of Western U.S. Longwall Mines Used in the Development of a Design Methodology Based on the Ground Reaction Curve

    By Dennis Dolinar

    "Tailgate entries in U.S. longwalls can be subjected to high loads and deformations. Therefore, tailgate entries are generally supported with varying types and amounts of standing support. However, ev

    Jan 1, 2010

  • SME-ICGCM
    Evaluation of the Point Load Strength for Soft Rock Classification

    By B. (Mamas) Das

    A project to evaluate the suitability of point Load strength tests for testing and classifying coal measure rocks for coal mining application was initiated by Canada Centre for Mineral and Energy Tech

    Jan 1, 1984

  • SME-ICGCM
    An Investigation of the Causes of Cutter Roof Failure in a Central Pennsylvania Coal Mine: A Case Study

    By John L. Hill

    Cutter roof failure is a specific type of ground control problem which frequently results in massive roof failure. It is a cannon occurrence in coal mines of the Northern Appalachian Coal Sasin, causi

    Jan 1, 1984

  • SME-ICGCM
    Subsurface Fracture Development Due To Longwall Mining And Its Interpretation Using Image Processing Techniques (736b40e1-a21a-40c0-a678-75088df69d02)

    By Gexin Sun

    This paper presents the physical modelling results of subsurface fracture development associated with longwall mining operations and an application of image processing techniques to interpretion of th

    Jan 1, 1992

  • SME-ICGCM
    The Development And Use Of Risk Assessment Techniques To Assess Roadway Stability In The Parkgate Seam At Thoresby Colliery

    By Paul Cartwright

    A rockbolted roadway risk assessment procedure has been developed specifically for the Parkgate seam at Thoresby Colliery by Rock Mechanics Technology and colliery engineers. The purpose of this asses

    Jan 1, 1999

  • SME-ICGCM
    Safe Pillar Extraction Practice - Some Geotechnical Principles Based on Australian Experience

    By Bruce K. Hebblewhite

    Underground pillar extraction continues to be practiced in Australia in various forms, in spite of the dominance of the longwall method, which accounts for over 90% of underground production. Australi

    Jan 1, 2011

  • SME-ICGCM
    Stable Entry Design In A Multi-Seam Environment

    The challenge of planning to minimize interaction effects in multi-seam mining is compounded by the difficulties inherent in extrapolating essential geological and spatial data between sampling points

    Jan 1, 1994

  • SME-ICGCM
    Geotechnical Considerations for Concurrent Pillar Recovery in Close Distance Multiple Seams

    By Peter Zhang

    "Room-and-pillar mining with pillar recovery has historically been associated with more than 25% of all ground-fall fatalities in the underground coal mines of the United States. The risk of ground fa

    Jan 1, 2017