Hydraulic Fracturing Of Sandstone And Longwall Roof Control - Implementation And EvaluationBy D. W. H. Su
Following a roof fall in the B12 headgate of a CONSOL Pennsylvania Coal Company (CCPC) underground coal mine in February 1998, CONSOL R&D and Exploration initiated an underground roof geology reconnai
Jan 1, 2001
-
Laboratory and Field Testing of Bolting Systems Subjected to Highly Corrosive EnvironmentsBy Stephen C. Tadolini, John Bolton, Bre-Anne Sainsbury, Tom Meikle
"The capacity of ground support components which have been affected by corrosion is reduced and may ultimately lead to dynamic failure of the component and the strata. In order to maintain an effectiv
Jan 1, 2016
-
Tunnel Deformation Monitoring "Action Levels" In Coal Mines For Support/Reinforcement DesignBy Lorraine Kent
Mine tunnel support using rockbolts was introduced in UK coal mines over the period 1987- 1992 and is now used in over 70% of all mine tunnels. In every case the reinforcement design has been based on
Jan 1, 1999
-
The Effect of Standing Support Stiffness on Primary and Secondary Bolting Systems (956b0a5f-7133-4b32-8a8e-517785f1d52a)By Stephen Tadolini
Standing crib supports have been applied in underground mining programs to resist large roof movements and sustain high¬loads. The strength and deformation capability of these systems has been documen
Jan 1, 2003
-
Overcoring Techniques to Assess in Situ Corrosion of Galvanised Friction BoltsThe effects of corrosion upon the load bearing capacity and ultimate tensile strength of galvanised friction bolts were determined. Corrosion rates were measured by overcoring of the reinforcement ele
Jan 1, 2005
-
Imaging Ahead Of Mining With Radio Imaging Method (RIM-IV) Instrumentation And Three-Dimensional Tomography SoftwareBy Larry Stolarczyk
A clear vision of the future coal mining industry was developed into a hierarchy of technology needs by the National Mining Association (NMA) and the Chief Executive Officers of the mining industry. A
Jan 1, 2003
-
Weatherability Test of Rocks for Underground MinesBy Kot F. Unrug
The shale response to moisture changes and the major finding of the appropriate research concerning this subject are briefly reported in this paper. Also described are mine ambient atmospheric condit
Jan 1, 1997
-
Surface And Borehole Microseismic Monitoring Of Longwall Faces; Their Potential For Three-Dimensional Fracture Imaging And The Geomechanical Implications.By Styles P.
To determine whether 130 felt earth tremors around Edwinstowe, Nottinghamshire U.K, which also experienced severe surface fissuring, were caused by coal extraction, a surface seismometer array was est
Jan 1, 1992
-
Root Causes of Groundfall Related Incidents in U.S. Mining Industry (2ced207f-73e6-4ab3-8c4e-7a683f4eb75c)By Kousick Biswas
The main objective of occupational health and safety research is to minimize or eliminate the events that may cause fatal or non¬fatal injuries to human workers. A commonly used technique is to devise
Jan 1, 2003
-
Mistakes, Misconceptions, and Key Points Regarding Secondary Roof Support Systems (b87a5324-ac75-480a-90d7-e642733c14a4)By Thomas M. Barczak
Roof support systems are necessary to provide stable mine openings and much research has been conducted to design a variety of roof support systems that will function in various manners to ensure that
Jan 1, 2001
-
Analysis Of Major Failure Through Integration Of Static And Dynamic Rock Mechanics InvestigationBy K. Y. Haramy
Rock burst and coal mine bump research using static and dynamic rock mechanics instrumentation has been conducted for several decades. Research efforts typically have been conducted using static instr
Jan 1, 1988
-
Integrity Factor Approach to Assess the Stability of Room-and-Pillar MinesBy Kanaan Hanna
The integrity factor approach was developed by the Bureau of nines to assess the stability of mine pillars and has been applied primarily to longwall chain pillars. Recently this approach was applied
Jan 1, 1988
-
Longwall Mining-Through the Backfilled In-Panel Entries at Cyprus Emerald MineIn recent years, improvements made to the longwall system have accelerated at a faster pace than those made to the gate entry development system. As a consequence, unless planned years ahead of time,
Jan 1, 1997
-
Longwall Mining-Induced Abutment Loads and Their Impacts on Pillar and Entry StabilityBy Jinsheng Chen
Longwall mining-induced abutment loads on the surrounding coal pillars can be grouped into two categories in terms of the relative position of the coal pillars and the longwall face. They are the fron
Jan 1, 2002
-
How to Design an Efficient Roof Bolting Plan Based on Simple In-Mine MeasurementsBy C. J. H. Brest van Kempen
The techniques developed should provide a useful tool, not only during the initial formulation of a suitable bolting plan for a new section, but also for periodic check¬ing on the utilization factor
Jan 1, 1986
-
Surface Structures Impacted By Subsidence From Pennsylvania Coal Mines, 2003 to 2008By Anthony T. Iannacchione
Underground bituminous coal mining is a large and significant industry within the Commonwealth of Pennsylvania, and it has a legacy of environmental consequence. For example, in 2008, 13.5 acres (5.5
Jan 1, 2011
-
Sidewall Fracturing In Coal Room And Pillar And Pillar Extraction Panels (fdea63a5-d54d-46e2-aad5-6c4f1c72e2f1)By André Vervoort
In coal room and pillar, and pillar extraction panels, the sidewall conditions were investigated based on underground measurements and numerical simulations. Three-dimensional linear elastic models pr
Jan 1, 1992
-
Mechanical Properties of Pizza Pans and Their Effectiveness in Underground Coal MiningBy Brian Daniels, James Farroni
"Draw rock (small rock that forms/falls when bolting the roof and/or rib) is the cause of numerous injuries annually. These injuries result in lost work hours and low morale. The report below explains
Jan 1, 2010
-
Assessment Of Underground Structural DesignBy Eugene D. Krupa
Mine 33 of Beth Energy has serious and complex roof cutter problems causing delay of the advance rate of both the entry development and longwall face retreat. The cost of maintaining these entries is
Jan 1, 1990
-
Resupporting High Roof FallsBy Nicholas Chlumecky
One of the most dangerous jobs in mining is that of resupporting the roof after a fall has occurred. The resulting cavity may be more than 30 feet high, with relatively unstable sides and roof. It is
Jan 1, 1981