Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Quality Management For Grouted Rockbolts

    By Dieter Wittenberg

    The successful extension of the applications in which rockbolts can be used in the German coalmining industry is, because of the very great raining depth combined with a high degree of stress in the n

    Jan 1, 2000

  • SME-ICGCM
    Use Of Database In Ground Control To Identify Weightings And Water Inflows

    By G. C. Xiao

    A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate

    Jan 1, 1990

  • SME-ICGCM
    Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines

    By Morgan Sears

    The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca

    Jan 1, 2013

  • SME-ICGCM
    Application of Microseismic Monitoring to Longwall Geomechanics and Safety in Australia

    By Xun Luo

    In this paper we report on the use of microseismic monitoring techniques to investigate the fracturing process associated with longwall mining. The study was carried out at three mines in Australia an

    Jan 1, 1998

  • SME-ICGCM
    Stress Control Method Applied to Stabilization of Underground Coal Mine Openings (e5cbe8ad-30a8-4144-a7b5-db19e81a247a)

    By Shosei Serata

    Serious floor heave of up to 2.4 m in a 2.4-m high mine entry was eliminated by applying the stress control method of mining, as a last resort, at the No. 5 coal mine of Jim Walter Resources, Inc., in

    Jan 1, 1984

  • SME-ICGCM
    Failure Modes Of Mine Tunnels In Stratified Rock Structures With Reference To Stress Field Conditions

    By Hui Chen

    The paper describes the use of a physical model technique to investigate the failure modes of mine tunnels with reference to the in situ stress field. The characteristics of stratification commonly en

    Jan 1, 1993

  • SME-ICGCM
    Shear Mechanism for Mining-Induced Fractures Applied to Rock Mechanics of Coal Mines (26fab274-0576-48ca-b03a-d4a9f18550cb)

    By Brian White

    Two examples of en echelon mining-induced fractures seen in hard¬rock mines provided a basis for inferring that fracture zones and bedding plane separations immediately surrounding mine openings are p

    Jan 1, 2002

  • SME-ICGCM
    Geotechnical Planning Basis for the Optimization of Workings

    By Nikolaos Polysos

    Besides considering the given geomechanical conditions, the geological/geotechnical logging of drill cores and heading faces during the driving of parallel entries and the resulting rock classificatio

    Jan 1, 2003

  • SME-ICGCM
    The Stress And Failure Paths Followed By Coal Mine Roofs During Longwall Extraction And Implications To Tailgate Support

    By Ross Seedsman

    Discussion on the design of roof support in tailgates has often been conducted without a clear statement of the stress and failure conditions acting. There is general agreement that in the tailgate th

    Jan 1, 2001

  • SME-ICGCM
    Monitoring Of Longwall Seal Behaviour For Permeability And Stress Changes

    By Ken Mills

    Dartbrook Mine (Australia) works the Wynn seam, which has a moderate propensity for spontaneous combustion. Prior to any mining a commitment was made to place a segregation barrier pillar between long

    Jan 1, 1999

  • SME-ICGCM
    Mine Convergence When Using Mobile Roof Supports In Pillar Recovery

    By J. R. Stoltz

    To date, there has been limited formal research dealing with the use of Mobile Roof Supports (MRS) for pillar recovery. This paper, which is a portion of a larger project, presents convergence data fr

    Jan 1, 1999

  • SME-ICGCM
    Continuous Monitoring Of Mechanised Breaker Line Supports To Investigate Roof And Pillar Behaviour

    By I. L. Follington

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.1 Colliery, Queensland. This system was designed to

    Jan 1, 1992

  • SME-ICGCM
    Rock Mass Classification As An Aid To Estimating The Strength Of Coal Pillars (77026f3a-8230-4eb0-afbc-609f7a2ad471)

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The coal

    Jan 1, 1992

  • SME-ICGCM
    Investigations Of Underground Coal Mine Bursts

    By K. Haramy

    Coal mine bursts or bumps involve the violent, rapid failure of coal and rock in or around a mine excavation. Failure is normally associated with high stress and brittle or brittle-elastic materials;

    Jan 1, 1984

  • SME-ICGCM
    Developments in Sealant Support Systems for Ground Control (21st international Conference on Ground Control in Mining)

    By Deno Pappas

    During the past few years, the Pittsburgh Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) has been evaluating developments in sealant support systems from a gr

    Jan 1, 2002

  • SME-ICGCM
    Bolt Load Changes During Initial Face Advance And Cross-Cut Breakthrough

    By Steve Signer

    The San Juan Mine and the National Institute for Occupational Safety and Health conducted a study to measure how development mining effected bolt loads. Twelve fully grouted, instrumented roof bolts w

    Jan 1, 2004

  • SME-ICGCM
    Investigation Of Pillar-Roof Contact Failure In Northern Appalachian Stone Mine Workings (55897abb-5ce0-4661-bf26-04d03fe5d67b)

    By Gabriel Esterhuizen

    The roof rock in underground limestone mines in Northern Appalachia can be subject to high horizontal stresses in spite of the shallow depth of the workings. The high stresses can cause roof stability

    Jan 1, 2004

  • SME-ICGCM
    Strata Mechanics Of Pillar Extraction Goaf Edges (001afab8-c7ac-48fa-af96-b8de57c1318e)

    By John Shepherd

    Pillar extraction carried out using various methods (split and lift, Wongawilli and old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting off

    Jan 1, 1992

  • SME-ICGCM
    Ground Control Design For Multiple Seam Mining Using Finite Element Analysis

    By John Stankus

    Seam interaction in multiple seam mining has significant effect on entry stability. The remaining pillar in an old working usually creates a high stress concentration zone while the gob creates a stre

    Jan 1, 1999

  • SME-ICGCM
    Rigid Or Yielding Roof Bolts: At The Face Or Away From The Face (3eff2ffb-d0b3-4171-9439-10f9fdec54f7)

    By R. D. Lama

    The concept of rigid or yielding bolts is discussed based upon support requirements for excavations of equivalent geomechanical behaviour. The concept of equivalent geomechanical behaviour is introduc

    Jan 1, 1992