Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Remote Sensing For Roof Control And Mine Planning: An Overview

    By R. F. Valene

    This paper is not available for inclusion in the Proceedings at the time of printing. but it will be included as an insert

    Jan 1, 1984

  • SME-ICGCM
    Support of Tunnels in South African Gold Mines

    By L. Z. Wojno

    Tunnels in South African gold mines are developed at depths down to 3 600 m below surface where the virgin rock stress approaches 100 MPa and, on occasions, through rock where the field stresses excee

    Jan 1, 1987

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    Pillar Collapse at Welgedacht Colliery, South Africa: A Case Study

    By J. Nielen van der Merwe

    During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta

    Jan 1, 1999

  • SME-ICGCM
    Radon Detection of Mining–Induced Fractures in Overlying Strata of Shallow Coal Seams in China

    By Dongsheng Zhang, Xufeng Wang, Wei Zhang, Gangwei Fan

    "Large-scale longwall mining of shallow coal seams could cause mining-induced fractures to communicate with the surface immediately in Northwest China, leading to a series of mine safety and environme

    Jan 1, 2015

  • SME-ICGCM
    Microseismic Monitoring of Mountain Bumps and Bounces: A Case Study

    By J. L. Condon

    The Bureau of Mines, through in-house and contract research, monitored mountain bump-prone areas of the Olga #2 Mine, near Welch, WV, using microseismic techniques for 15 months during 1985 and 1986.

    Jan 1, 1987

  • SME-ICGCM
    Underground Application Of Optimization

    By S. J. Jung

    The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min

    Jan 1, 1993

  • SME-ICGCM
    Coal Bursts That Occur During Development: A Rock Mechanics Enigma

    By Christopher Mark

    Coal bursts are typically associated with highly stressed coal. Most bursts occur during retreat mining (longwall mining or pillar recovery) in highly stressed locations like the tailgate corner of th

    Jan 1, 2017

  • SME-ICGCM
    Evaluation of Rock Burst in Deep Coal Mining By Using the Forensic Engineering

    By Saeed Zhandi, Behdeen Oraee

    "Rock bursts remain an important problem in longwall coal mining. These bursts are due to a sudden and severe failure of rocks from a high stress concentration in deep underground excavations that occ

    Jan 1, 2015

  • SME-ICGCM
    Shear Testing of 28 mm Hollow Strand "TG" Cable Bolt

    By Naj Aziz, Peter Craig

    "Double shearing tests were carried out on the 28 mm (1 in) hollow strand Jennmar TG cable bolt to gain a better understanding of the shearing behavior of the cable. The first test was limited to a 50

    Jan 1, 2010

  • SME-ICGCM
    A Comparison Of Support Reactions To Retreat Longwall Front Abutment For Two Different Gateroad Support Techniques

    By Gary R. Corbett

    The federally owned Cape Breton Development Corporation (CBDC) mines approximately 2.5-3.0 Mt of coal per annum from its Phalen Colliery. As part of an ongoing process to become more commercially viab

    Jan 1, 1993

  • SME-ICGCM
    Case Studies of Innovative Cable Bolt Technology

    By Ben Mirabile

    Over the past three decades, the U.S. coal mining industry has widely used cable supports to supplement traditional primary bolting systems, especially in difficult ground conditions. However, increas

    Jan 1, 2013

  • SME-ICGCM
    Australian Longwall Geomechanics - A Recent Study (52cb3b8b-6f2d-4969-ba9d-61fc0c2f72ec)

    By Russell C. Frith

    This paper presents recent findings concerning longwall caving mechanisms relating to Australian mining conditions and their effect upon longwall support requirements and behaviour. The findings arc b

    Jan 1, 1992

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Three Dimensional Analysis of Strain and Ground Surface Displacement Caused By Underground Mining in the Vicinity of Geotechnical Barriers

    By Rafal Misa

    In order to prevent the formation of mining damage or to reduce its reach, it is advisable to look for technical solutions which would enable effective protection of construction sites from the impact

    Jan 1, 2014

  • SME-ICGCM
    An Examination of the Loyalhanna Limestone's Structural Features and Their Impact on Mining and Ground Control Practices

    By Tony Iannacchione

    A close look at the Loyalhanna Limestone of southwestern Pennsylvania reveals a complex structural environment. Most exposures of the Loyalhanna occur along Chestnut Ridge and Laurel Hill within the A

    Jan 1, 2002

  • SME-ICGCM
    Screw Anchors for Ground Control

    By Frank Schmidt

    Due to changing geology, rib bolting is an ever-changing problem in ground control. With the economic status of the coal market, the need for safely increasing productivity in rib bolting is at an all

    Jan 1, 2013

  • SME-ICGCM
    Multi?Seam Mining Over Old Workings with Small Pillars - A Case Study

    By Peter Zhang

    Room and pillar mining under shallow depth is usually conducted with a high extraction ratio, which leaves small pillars with a low safety factor in some old workings in abandoned mines. Pillar slough

    Jan 1, 2014

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Numerical Modeling of Stress Distribution of Gateroads Subjected to Dynamic Pressure of Longwall Mining in the Immediate Overlying Seam, a Case Study

    By Ximeng Li

    The entries that are subjected to dynamic pressure are much more difficult to maintain due to repeated disturbance. A case study of an entry stress distribution was performed using the FLAC3D program.

    Jan 1, 2013