Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Ground Response To Tunneling Los Angeles Metro Rail Contract A171

    By T. J. Lyman, M. J. Robison, W. A. Ruemmele

    INTRODUCTION The first phase of the Los Angeles Metro Rail Project consists of 7.1 km (4.4 miles) of subway and stations running through downtown Los Angeles from Union Station to MacArthur Park. C

    Jan 1, 1989

  • SME
    Vanadium: Trends in Exploration, Markets and Future Demands (aedbcff5-ad21-4877-bbb9-8aa19e8d817b)

    By A. D. Hammond

    "INTRODUCTION The recent drop in iron ore prices has claimed an unwitting casualty in vanadium. Vanadium is dominantly produced as a co-product of steel production. The recent shutdown at EVRAZ’s Mapo

    Jan 1, 2016

  • SME
    Gold Recovery From High-Arsenic-Containing Ores At Newmont?s Roasters (f983f2f6-4b58-4eb9-a694-f0892e2303d7)

    By R. R. Fernández

    The Newmont roasting plant in Carlin, Nevada, commenced operating in December 1994. Over the years, refractory ores and pyrite concentrates from different gold deposits constituted the feed to the fa

    Jan 1, 2010

  • SME
    Effect Of Mining Operation And Tailings Disposal Requirements On Mill Design

    By Robert H. Raring

    Viewed abstractly, a mill may be defined as a mineral processing facility located somewhere between the mine and the tailings storage area, Just how mining operations and the demands of tailings stora

    Jan 1, 1961

  • SME
    SCMAGLEV—Innovative Mass Transportation in the Northeast Corridor (NEC) - RETC2021

    By Nikolaos Syrtariotis, Mark Berger, Timothy O’Brien, Vojtech Gall

    The Northeast Corridor Superconducting Maglev Project (SCMAGLEV) entails construction of a high-speed train system between Washington, DC and New York City, with the first leg between Washington and B

    Jun 13, 2021

  • SME
    Effect of topography on ground movement due to longwall mining

    By M. K. Quinn, R. D. Chaffins, A. W. Khair

    This paper presents an analysis of the effects of topography on static and dynamic ground movements and severity of damage inflicted on surface structures. A typical site containing varying topographi

    Jan 1, 1987

  • SME
    Rehabilitation Of A Failed Haul Road In An Asbestos Open Pit

    By W. D. Bullock

    The King-Beaver mine of Asbestos Corporation Limited operates an open pit in the city of Thetford Mines, Quebec. The approximate loca-tion of the open pit is at Latitude 46° 02' North and Longitu

    Jan 1, 1980

  • SME
    Dust Extraction in Headings Effected by Means of Rotodynamic Ventilation Ducts

    By Walenty Frydel

    The paper deals with highly efficient dust collecting systems of the 10-600 type which constitute new generation installations de- signed to eliminate dust hazard in headings driven with roadheaders.

    Jan 1, 1997

  • SME
    Probabilistic Simulation Of Underground Production Systems

    By Bruce D. Hanson

    A computer model capable of simulating the basic production system in a variety of underground mining methods has been developed at the Twin Cities Mining Research Center. This Bureau of Mines paper d

    Jan 1, 1974

  • SME
    Maintenance Control ? A Four Level Approach - Who's Right?

    By Mark L. Munsell

    In recent years, miners have tried many approaches to maintenance such as: - Highly sophisticated computerized programs. - large planning groups designed to preplan and schedule work. - Contract

    Jan 1, 1976

  • SME
    Geochemical Investigations Of The Fate Of Abandoned Raffinate In A Proposed In-Stope Solution Mining Project, With Applications To Prediction Of Ground Water Quality

    By G. A. Doyle

    The White Pine Mine is the second-largest active underground copper mine in the United States, covering an area of approximately 13 square miles in the Upper Peninsula of Michigan. The mine operator i

    Jan 1, 1996

  • SME
    Blasting With Ammonium Nitrate

    By Lewis J. Patterson

    In the period of time allotted to this paper, an attempt will be made to cover a great deal of territory, figuratively speaking, as far as our experience with ammonium nitrate is concerned. In givi

    Jan 1, 1958

  • SME
    Separation of non-magnetic minerals using magnetic fluids in a flow-through MHS rotor

    By W. S. Urbanski, A. L. Devernoe, M. S. Walker

    Theory and practice are described for a new processing method capable of precise mineral separations based primarily on differences in particle specific gravities at specific gravity split points from

    Jan 1, 1991

  • SME
    Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022

    By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis

    Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin

    Dec 1, 2022

  • SME
    Engineering of Cooks Lane Tunnel: An overview of challenges

    By V. Nasri, S. Rashidi

    The Baltimore Red Line Project is a proposed 22.7-km (14.1-mile) long east-west light rail transit (LRT) line envisioned to connect the areas of Woodlawn, Edmondson Village, West Baltimore, downtown B

    Jan 1, 2014

  • SME
    The Similkameen Tailing System ? Introduction

    By Albert J. Kritscher

    The Similkameen Copper Project located near Princeton, British Columbia, is operated by the Similkameen Mining Company Limited, a wholly-owned subsidiary of Newmont Mining Company. The orebodies for t

    Jan 1, 1973

  • SME
    Integrated Mine Monitoring System on Managing Seismicity Risks Impact to Mining Production in PT Freeport Indonesia - RASIM 2022

    By Amri Priambodo, Ian Leslie, Valérie Laflèche, Agustina Ratnaningrum, Robin Paine, Andrianus Sinaga, Willem de Beer

    Freeport Indonesia consists of surface, civil and underground mining areas exposed to numerous geotechnical risks and hazards. PTFI uses various monitoring systems (Micro-Seismic, Firefly Light System

    Apr 26, 2022

  • SME
    Characterizing REEs in Alaskan Coal and Ash

    By T. Gupta, T. Ghosh

    "In recent years, the demand for Rare Earth Elements (REE) have grown rapidly due to increasing demand and global supply shortage. The supply deficit of these critical elements has encouraged the sear

    Jan 1, 2016

  • SME
    MINSIM - The MINe SIMulator

    By Jaril B. Lavrencic

    The unique and irregulator distribution of working places in a mine always poses the two questions: - which and how much production equipment is to be used, - what production can be expected.

    Jan 1, 1989

  • SME
    Rib pillar extraction - an alternative to longwalling and shortwalling

    By H. Habenicht, E. Urschitz

    Three mining methods for full extraction in flat coal seams - i.e., longwall (L W), shortwall (SW), and rib pillar extraction (RPE) - are com- pared with each other in view of the introduction of a me

    Jan 1, 1988