Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Technical Papers - A Review Of The Effects Of Exhaust Aftertreatment On Nitrogen Dioxide Emissions From Underground Mining Equipment

    By E. G. Cauda

    Diesel engines are a major source of underground miners? exposure to nitrogen dioxide. In an effort to reduce the exposure of underground miners to regulated and unregulated diesel emissions, primaril

    Jan 1, 2010

  • SME
    Calcium Activated Stablization And Costruction Of Road With Fly Ash

    By S. Mishra, C. Shon, D. Saylak

    Only 40% of fly ash generated by the power plants in US are recycled and used for commercial applications. Of these, the high lime, Class C ash had been preferred. Systematic laboratory and field-scal

    Jan 1, 2007

  • SME
    The Practice and Development of Descentional Ventilation

    By Meili Zhu, Qingpu Shi

    High temperature, methane, dust and other disasters are getting more serious with mining depth getting deeper and the development of mechanization in underground mines. An application of a descensiona

    Jan 1, 1991

  • SME
    Practical Applications For The Silicon Drift X-Ray Detector In SEM-Platformed Image Analysis: The Bruker-MLA In Practice

    Preface The intention of this paper is to provide the reader with knowledge gained here at Memorial University regarding the practical use of the Bruker SDD x-ray detector for applications in image a

    Jan 1, 2007

  • SME
    A Parametric Study for the Effect of Dip on Stone Mine Pillar Stability Using a Simplified Model Geometry "Mining, Metallurgy & Exploration (2021)"

    By Morgan M. Sears, Gamal Rashed, Michael M. Murphy, Brent Slaker

    In this study, a parametric study was conducted using FLAC3D numerical models to examine the impact of oblique loading, generated from seam dip, on the strength and the failure propagation pattern of

    Feb 5, 2021

  • SME
    Open Pit Sequencing And Scheduling

    By Graham A. Mathieson

    The precise definition of an ultimate or economic pit has, over the years, received much attention in the literature on the subject of mine planning. Unfortunately, relatively little has been publishe

    Jan 1, 1982

  • SME
    Financing of mining projects - Can banks drive sustainability?

    By M. Götze, P. Eysel

    Over the last years, the importance of the assessment of environmental and social aspects as well as of issues of good governance has increased significantly in mining finance. For this, international

    Jan 1, 2011

  • SME
    Transforming HSE Performance It's Not Harder Than You Think

    By B. Kraus

    Many of us who have interacted with senior executives from leading oil and gas companies over the last few years on the subject of HSE performance have observed a marked shift in their engagement on t

    Jan 1, 2011

  • SME
    Prediction Versus Actual Response of Rocks in an Excavation of Underground Cavern at the Lam Ta Khong Pumped Storage Project

    By Pratoomkhuan N. Lertsgoon

    A large underground cavern with dimensions of 25m × 175m × 49m (W×L×H) was excavated in sandstone and siltstone to house 4 units of hydropower generator and was completed in 2000. In feasibility study

    Jan 1, 2003

  • SME
    Exploration Review (e96536eb-375b-4e78-89b1-3a52f73b4768)

    By D. R. Wilburn

    This summary of international mineral exploration activities for 2012 draws upon information from industry sources, published literature and U.S. Geological Survey (USGS) specialists. The summary prov

    May 1, 2013

  • SME
    Geostatistics And Kriging: Surviving In The Real World

    By M. G. Hester

    The inadequacy of traditional geostatistical methods for estimating some precious metals deposits has become apparent in the last few years. New methods or estimation such as Indicator, Probability an

    Jan 1, 1990

  • SME
    Planning of the San Francisco Public Utilities Commission’s Channel Tunnel

    By Art Hamid, Manfred Wong, R. John Caulfield

    "The proposed Channel Tunnel is a critical component of the San Francisco Public Utilities Commission’s (SFPUC) Central Bayside System Improvements Project (CBSIP), which is a key element of a $6.9-bi

    Jan 5, 2017

  • SME
    Using Commodity Price Projections In Mineral Project Valuation (e14ad808-00f6-41c6-a874-e60c8a10a41d)

    By G. Davis

    It is well known that the anticipated mineral price at the start of a prospective mineral project can have an overwhelming effect on a property's ex ante value. However, possible price movements

    Jan 1, 1995

  • SME
    Regrind Mills: Scaleup Or Screwup

    As ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind

    Jan 1, 2011

  • SME
    Acid Base Accounting: Low-Level Data Comparison Of Net Carbonate Value Versus Modified Sobek Procedures As Described By The State Of Nevada

    By T. Patten

    Inter-Mountain Labs, IML, performed a study comparing mining waste rock sample analysis by Net Carbonate Value (NCV) and Modified Sobek acid-base accounting procedures. The study looked at 468 waste r

    Feb 27, 2013

  • SME
    Site Specific Blasting Model For Mine-To-Mill Optimization

    By K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in-situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • SME
    Chemical Composition And Geochemical Behavior Of Contaminated Groundwater At Uranium Tailings Impoundments

    By John A. Cherry

    Groundwater monitoring conducted at an acidic uranium-tailings impoundment in Wyoming and at one in Ontario indicate that at these unlined impoundments situated on unconfined sand aquifers, there exis

    Jan 1, 1982

  • SME
    The Development Of Ultra Fine Grinding At KCGM

    In February 2001, Kalgoorlie Consolidated Gold Mines (KCGM) commissioned its first full-scale ultra fine grinding (UFG) plant to supplement existing roaster concentrate treatment capacity. This proces

    Jan 1, 2002

  • SME
    Selection Of The Vertical Alignment Of Rapid Transit Tunnels

    By Charles W. Daugherty, James P. Gould, Kenneth R. Ware

    INTRODUCTION As illustrated in Figure 1, the Washington Metropolitan Area Transit Authority's (WMATA) rapid transit system (METRO) ultimately will comprise 100 miles of line divided among 10 r

    Jan 1, 1976

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013