Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A Quantitative Method for Selecting Renewable Energy Projects in the Mining Industry Based on SustainabilityBy M. Mostert
Mining companies sponsor a range of non-core, corporate social responsibility projects to adhere to social and labour plans and environmental management prerequisites that form part of a mining licenc
Jan 1, 2014
-
Geotechnical Areas Associated With The Ventersdorp Contact Reef, Witwatersrand Basin, South AfricaBy M. K. Roberts
The approximately 2800 Ma old Ventersdorp Contact Reef is a unique Witwatersrand orebody, from which about 6% of the world?s gold production is derived. A major portion of this production is mined at
Jan 1, 1999
-
The Geopyörä breakage test for geometallurgy, T. Chavez Matus, M. Bueno, M.S. Powell, S. Michaux and S. LuukkanenBy M. Bueno, T. Chavez Matus, M. S. Powell, S. Michaux, S. Luukkanen
Comminution tests are an essential element in the design of ore beneficiation plants. Many methods have been developed to assess the breakage characteristics of rocks to generate parameters for modell
Jan 1, 2020
-
Winning Paper: Analysis Of Strike Gully Stability At Tautona MineBy J. Thompson
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree A study into the stability of strike gullies at TauTona mine was to be carried out. In reaching
Jan 1, 2002
-
Simulation of the mechanical behaviour of a fracture in shear: implication of the distribution of the void spaceBy J. Riss, S. Gentier, A. Marache
The study of the hydromechanical behaviour of fractured rock masses requires a detailed knowledge of the isolated fractures. The aim of the paper is the simulation of the evolution of the void space,
Jan 1, 2003
-
Impact of Discount Rates on Cut-Off Grades for Narrow Tabular Gold DepositsBy C. Birch
"The purpose of this study was to establish the impact of discount rates on cut-off grades for narrow tabular gold deposits as characterized by the goldfields of the Witwatersrand Basin in South Afric
Jan 1, 2016
-
A comparison of models for the recovery of minerals in a UG2 platinum ore by batch flotationBy B. K. Loveday, N. V. Ramlall
A study was carried out to evaluate various batch flotation models for the recovery of minerals in a UG2 platinum ore. The major minerals in a UG2ore can be grouped as platinum group minerals, chromit
Jan 1, 2015
-
Implementation Of An Alternative Matte-Level Measurement Solution At Lonmin Marikana Smelter Division For Improved Process MonitoringBy T. J. Goff
Keywords: accurate control, matte level, smelting operations, process control, tapping, sounding bar, electromagnetic measurement [ ] Accurate control of matte levels during primary matte smelting
Jan 1, 2011
-
Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - SynopsisBy M. du Plessis
This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar
Jan 1, 2011
-
Equipment selection based on the AHP and Yager’s methodBy M. Yavuz
One of the challenging problems for optimization in mining operations is to choose the best equipment among the alternatives. Equipment selection is an important task for mine management due to its op
Jan 1, 2015
-
Life-Of-Mine Ventilation and Refrigeration Planning for Resolution Copper Mine (f7fec8ba-f444-4056-8367-98da9f297180)Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate i
Jan 1, 2014
-
Latest Electrode Technology Delivering Improved Electrode Performance In Submerged Arc FurnacesBy Henk van der Bijl, Sean Rogers, Eugene Sidorski, Alan Carpenter
The electrode column is the heart of the submerged arc furnace. Superior electrode performance provides improved furnace performance. This paper describes the main features of the electrode column tha
Jan 1, 2007
-
Supplementary Mineral Resources and Mineral Reserves Reports: Readability and textual choiceBy P. W. J. Delport, E. Du Toit
Investing in a mining venture can be risky and stakeholders need transparent, unbiased reports to understand the Mineral Resources and Mineral Reserves a mining company holds. Readability and textual
Mar 1, 2021
-
Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And LimitationsBy Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju
High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe
Jan 1, 2007
-
Update On The Development Of Platinum-Based Alloys For Potential High-Temperature ApplicationsBy L. A. Cornish
Pt-based alloys for high-temperature applications in aggressive environments have been under development for over 10 years, and are targeted to be used as either as bulk, or as coatings. The alloys c
Jan 1, 2012
-
The Minerals Plant Of The Future - Leveraging Automation And Using Intelligent Collaborative EnvironmentBy D. Almond
Low-grade, complex mineral deposits have resulted in the need for complicated large-throughput processing plants delivering increased productivity, reliability, and utilization, together with reducing
Jan 1, 2012
-
Air drying of fine coal in a fluidized bedBy E. S. Peters, M. J. van Rensburg, M. Le Roux, Q. P. Campbell
"The demand for energy has continued to rise worldwide in line with population growth. The majority of South Africa’s electricity is supplied by coal-fired power stations. The amount of fine coal (-2
Jan 1, 2015
-
The recovery of platinum group metals from low-grade concentrates to an iron alloy using silicon carbide as reductantBy G. A. Bezuidenhout, S. Bradshaw, W. Malan
"The purpose of the study was to investigate the feasibility of SiC reduction of low-grade concentrates from Lonmin’s Rowland and Easterns operations with respect to metal fall and PGM recovery. These
Jan 1, 2015
-
Multivariate Block Simulations of a Lateritic Nickel Deposit and Post-Processing of a Representative SubsetBy J. Daraisme
Société le Nickel (SLN) exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, and t
Jan 1, 2014
-
Control Of Strong Ground Motion Of Mining-Induced Earthquakes By The Strength Of The Seismogenic Rock MassBy A. McGarr
The shear stress t that can be sustained by the rock mass in the environs of a mining-induced earthquake controls the near-fault peak ground velocity v of that event according to v=0.25(ß/G)t, where ß
Jan 1, 2002