Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improve Milling Through Better Powder Distribution

    By Jack Eloranta

    Optimization of blasting requires the comprehension of processes including drilling through milling. The author has previously considered the role of powder factor in relationship to downstream proces

    Jan 1, 2001

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Marvel Loch – Core and Shell Mass Blast

    By Joseph Hoang, Nick Reed, Scott Wishart, Michael Lovitt

    Marvel Loch Underground forms part of St Barbara Limited’s Southern Cross Operations which is located 360km (224 miles) east of Perth. Southern Cross Operations produces approximately 120,000 ounces o

    Jan 1, 2012

  • ISEE
    Implementation of Seed Form Vibration Analysis, Modelling and Electronic Detonators for Blast Vibration Control and Blast Performance

    By Thomas L. Barkley

    "In early 2015 the Seed Waveform method was used to measure the Geologic response of the MesabiIron Formation to explosives energy input. This single charge wave form was then used to design acritical

    Jan 1, 2016

  • ISEE
    Blast Design at Pinson Mine

    By Melvin A. Sannes

    The Pinson Mine has several different rock formations, running throughout the pits. The main types of material found are Alluvium, Shale and Limestone. In some instances, all three can be found within

    Jan 1, 1998

  • ISEE
    Utilization of Pre-split to Dewater a Cut

    By Monica Stuckert

    Field studies were made at an Appalachia coal stripping operation to evaluate the differences in cost and performance between blast casting with pre-split dewatering versus conventional coal overburde

    Jan 1, 1985

  • ISEE
    Impulse Delivered to a Plate from Explosive Detonation

    By D. Goodings, W. L. Fourney, Bonenberger, R., Uli Leiste

    The problem of the maximum depth at which a mine buried in the surf zone or beach zone is a threat to landing vehicles is being studied by Naval Surface Warfare Center (NSWC), Indian Head Division, Na

    Jan 1, 2004

  • ISEE
    Table Of Contents 2020 General Proceedings

    By NA NA

    Copyright © 2020 International Society of Explosives Engineers

    Feb 1, 2020

  • ISEE
    Blast Designs to Achieve a Plant Tonnage Goal in a New Mine

    By Cristian Rodriquez, Fernando Fernandez, Rodrigo Fuentealba, Tom BoBo, Maria Rocha, John Kemeny

    This paper describes a case study that was conducted at a new mine in South America. This mine has significant geologic variations that will result in different distributions of hard and soft ore bein

    Jan 1, 2015

  • ISEE
    Low Powder Factor Blasting to Take Advantage of Natural Rock Fissures is Uneconomical

    By R. F. Favreau, Patrice Favreau

    In many quarries and construction sites visited by the authors over the last 50 years, the latter have observed muck piles from blasting with explosives, which included numerous large blocks, in some

    Jan 1, 2018

  • ISEE
    Effect of Presplit Perimeter Control in an Underground Cut and Fill Mine

    By David Porter, Nathan Rouse

    The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders

    Feb 6, 2023

  • ISEE
    Journal: 20th Annual Photo Contest / Boiler House

    By Ryan Redyke, Jared Redyke

    The demolition of an old power plant boiler house in Parsons, Kansas calls for the use of some linear shaped charges. The steel is thick and the structure is heavy but gravity can be a blaster’s best

    Jan 1, 2015

  • ISEE
    Excavation for Underground Salt Plant

    By Jim Breedlove, Stephen P. Case, Mike Fabio

    To meet salt production needs over the remaining life of the Cayuga Mine at Lansing, New York, the Salt Division of Cargill, Inc. decided to build a new underground screening plant. The new plant requ

    Jan 1, 1996

  • ISEE
    Explosives Industry in India: A Changing Scenario

    By S S. Kahlon

    India is a large and growth market for explosives and accessories, which has dramatically changed from complete import dependence to self sufficiency, and now has an exportable surplus. The largest si

    Jan 1, 1987

  • ISEE
    The Impacts of Digital Revolution in the Mining Sector. Case of Study: Blasting Operations of a Copper Mine in the Northern of Brazil

    By Vitor Fonseca de Barcelos, Jair Carlos Koppe

    Our society is experiencing a digital revolution. Technology is demonstrating its significant potential for mining industry. In this paper are presented the measured and estimated impacts of applying

    Feb 1, 2020

  • ISEE
    Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog Mine

    By Norman Paley

    A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput

    Jan 1, 2012

  • ISEE
    Pre-Blast Surveys; a Public Relations and Claim Reduction Tool

    By David Harrison, Edward J. Walter, Meitra Ferek

    A pre-blast survey can be a great tool in the prevention of blasting complaints and subsequent damage claims. In today's highly competitive industry, we are always looking for ways to become more cost

    Jan 1, 1995

  • ISEE
    Measuring Blast Fragmentation by Analyzing Shovel Bucket Contents

    By Hairong Zeng, Shahram Tafazoli, Edmond Chow

    Blast fragmentation is one of the main parameters for optimizing mineral processing, but reliable data is difficult to acquire, resulting in unpredictable performance and efficiency. Crusher and grind

    Jan 1, 2011

  • ISEE
    A Kinematic Approach for Blast Modeling

    By Ruilin Yang

    Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.

    Feb 1, 2020

  • ISEE
    Pre-Controlling Blast Site Safety to Ensure Profitability

    By S. J. Dillingham

    One of the primary goals of every blaster is to achieve the optimum blast design. Too much focus on efficient design, however, can cloud certain issues and exposures that must be addressed if the enti

    Jan 1, 2002