    Permanent Displacement And Pile Driving Vibrations - Summary

    By Charles H. Dowding

    Whenever piling vibrations are significant, construction activities associated with pile driving and/or excavation can produce permanent displacement. These permanent displacements are more detrimenta

    Jan 1, 1991

  • DFI
    Driven Piles

    By S. Merjan

    Three papers were presented for discussion at the conference: 1) Instrumented driven steel tube piles at Canary Wharf; author: A. R. Gaba, United Kingdom. The author described the Canary Wharf

    Jan 1, 1991

  • DFI
    The World In Steel Sheet Piling ? Synopsis

    By M. Dondelinger

    This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di

    Jan 1, 2010

  • DFI
    You Can't Drive Piles Because Of The Vibration

    By Jerry A. Steding

    How many times have you heard "You can't drive piles because of the vibration."? You hear these words come out of the mouths of owners, engineers, and contractors. When a piling contractor he

    Jan 1, 1988

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • DFI
    Predicting ACIP Pile Settlement Using Case Histories ? Introduction

    By Christopher M. Kenney

    Augered-cast-in-place (ACIP) piles have been utilized on commercial projects throughout many parts of the country for years, but are only beginning to be scrutinized for use on major infrastructure pr

    Jan 1, 2001

  • DFI
    Real Time Monitoring the Historic Old South Church, Boston, Massachusetts

    By Pierre Gouvin, Michael Oakland

    "This paper covers the rapid response methods used to monitor the emergency response to damage to an historic structure. An architectural gem, the latest incarnation of the old south Church was comple

    Jan 1, 2017

  • DFI
    Business Benefits Of An Integrated CFA Rig Instrumentation System

    By Jason N. Scott

    CFA piling is a ?blind? construction process that relies heavily on the rig instrumentation to produce sound piles. If the data measured and recorded during construction can be made available to engi

    Jan 1, 2006

  • DFI
    PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case History

    By Chris D. Shewmaker

    So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po

    Jan 1, 2004

  • DFI
    30 Hudson Street Foundation Design and Construction in Variable Rock

    By Joel Moskowitz, George J. Tamaro

    "A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s

    Jan 1, 2004

  • DFI
    Installation And Performance Characteristics Of High Capacity Helical Piles In Cohesionless Soils

    By Mohammed Sakr

    The use of helical piles as a deep foundation option has considerably increased in the recent years to support a variety of loads, from small loads for several applications such as residential housing

    Jan 1, 2011

  • DFI
    Stabilization Of Organic Soil With The Limix System

    By Magnus Ruin

    The dry deep mixing method for stabilization of soft soil has been used in the Scandinavian countries for 25 years. The typical application has been stabilization of soft inorganic clay. Today the met

    Jan 1, 2001

  • DFI
    Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments

    By Robert C. Simpson, Ghada S. Ellithy

    "There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi

    Jan 1, 2015

  • DFI
    Axial Load Tests In Drilled Shafts And Piles In A Refinery: Comparison Between Design And Experimental Results

    By Walter I. Paniagua

    Drilled shafts and precast concrete piles were installed for the foundation of several structures in a reconfiguration project of a refinery in Minatitlan, Veracruz, in the Gulf of Mexico. The soils a

    Jan 1, 2007

  • DFI
  • DFI
    Reflections on Tremie Concreting in Deep Foundations

    By Gilbert R. Tallard

    "Pouring deep foundations by the tremie pipe method is nowadays such a common process that it has becomes an unspecified practice. Means and methods are almost entirely at the contactor’s discretion.

    Jan 1, 2017

  • DFI
    Numerical Modelling of a Deep Excavation Shoring for Replacement of Control Structure at a Dam

    By Lok M. Sharma, Deep K. Khatri, Bradfield. Brett

    "A shored enclosure was required to access a control structure upstream below the dam of a deep lake. The shoring involves the interaction of the structure, soil, and water and the loads imposed inclu

    Jan 1, 2017

  • DFI
    Excavation Bracing Technology ? Synopsis

    By G. F. Sowers

    Excavation bracing is a special structural system. It is built from the top down. The design is controlled by the economical construction of another structure as well as by the movement of the ground

    Jan 1, 2010

  • DFI
    Railroad Bridge Approach Embankment Settlement Mitigation

    By Moi Arzamendi, Jose Ramirez, Kenneth Kniss, Sunil Arora, James Gingery

    Construction of a new approach embankment for a railroad bridge over a river in Southern California required placing up to 12 ft of fill over soft to medium stiff silts and clays along an approximate

    Jan 1, 2018

  • DFI
    Non-Destructive Testing Methods For Drilled Shaft And Acip Piles

    By George Piscsalko

    There are numerous methods currently available to assess the integrity of drilled shaft and ACIP piles. Each method has its advantages and limitations. This paper will compare the various available me

    Jan 1, 2011