Partnering for Cutoff Wall Project SuccessBy Osvaldo Valdez, Matteo Bertoni, Aem Ragy
The East St. Louis Deep Cutoff Wall project is located in the area of East St. Louis, Illinois, across the Mississippi River from the city of St. Louis, Missouri, along the left descending bank of the
Sep 1, 2023
-
The Underwater Cut-Off At The Walter F. George DamBy Gianfranco Di Cicco
Seepage problems were recorded for more then 40 years at the Walter F. George lock and dam. In 2001 the Mobile district of The U.S. Army Corps of Engineers turned to the installation of a 200 feet dee
Jan 1, 2013
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Application Of Deep Mixing And Stone Column Techniques For Stabilization Of Large Earth Cum Rock Fill (Ecrf) Dam For An Irrigation ProjectBy Cemal Can Maslak, Vijaya Bhushan Rao, Vidyaranya Bandi, Karsten Beckhaus
A Large Earth Cum Rock Fill, ECRF Dam is under construction at Polavaram in the state of Andhra Pradesh in India as part of an irrigation project. The Embankment crest width of the dam is 12.5m and ba
Sep 1, 2022
-
Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile WallsBy Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Sustainability and the Future for the Deep Foundations IndustryBy Tony Suckling
"As we head toward the United Nations Climate Change Conference in Copenhagen in December, the environment and sustainability will become headline news for a while. Governments are expected to agree t
Jan 1, 2009
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
Construction Of Cast-In-Place Piles With Enlarged BasesBy H. Mori
Construction of cast-in-place piles with enlarged bases has become popular in the cities in Japan facing to the sea coast, where the subground soil is soft alluvium deposited to depths often exceeding
Jan 1, 1989
-
Keynote Lecture 2: Dr. Masaaki Terashi The State of Practice in Deep Mixing MethodsBy Masaaki Terashi
The machine for the hybrid method called JACSMAN is ordinarily a dual shaft machine. Each shaft has augers at three different levels and nozzles for jetting at two different levels. The distance betwe
Feb 10, 2003
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Resonance Pile Driving with Zero Ground VibrationBy Mark Johnson, Mathew Janes
"The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl
Jan 1, 1900
-
Experiences and New Developments in Offshore Foundation (610f0063-3ba0-451b-bb8c-dc3962343edb)By Leonhard Weixler, Jean Wehbe, Gordian Ulrich, Franz-Werner Gerressen
"As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced
Jan 1, 2017
-
Load Tests On Belled Piles With Polystyrene Foam Between The Shaft And The BaseBy José Carlos A. Cintra
This paper addresses a new experimental procedure to measure the shaft friction and the base resistance of bored piles during static load tests. It is proposed that a set of polystyrene foam discs, pl
Jan 1, 2002
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement FacilityBy Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
2100 L Street Underpinning & Support Of ExcavationBy Charles R. Conlon, Matthew J. Niermann
This paper presents the underpinning and excavation support systems used for construction at 2100 L Street in Washington, DC. The excavation for the proposed building extended below bedrock, which pre
-
Finite Element Analyses And Cofferdam ExcavationsBy Dimitrios C. Konstantakos
Cofferdam excavations have traditionally been designed with classical design methods that involve direct computations of active or apparent earth pressures. However in contrast to finite element metho
Jan 1, 2013
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry PracticeBy Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
Design and Construction of Specialty Foundation for the Historic Virginia State Capitol BuildingBy Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi
"The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States
Jan 1, 2005
-
Experiences And New Developments In Offshore FoundationBy Franz-Werner Gerressen
As alternative energy industries pick up speed internationally, and as government regulation and restriction limit the use of impact hammers due to environmental limitation from construction induced n
-
The Benefits of Early Contractor InvolvementBy Robert Small, Amshu Chappa, Ihab Allam
The Biosolids Digester Facilities Project (BDFP) is located in southeast San Francisco. The jobsite is bounded by active Caltrain and Union Pacific Railroad tracks on the west side and the existing So
Jan 1, 2023