  • DFI
    Innovations and Challenges during Urban Development – Shoring and Foundations of Canada’s Tallest Residential Building

    By Shawna Munn, Nadir Ansari, Toben Jerry

    With ever increasing demands on space in urban environments and smaller available footprints, buildings are being designed to increasing heights to meet the need. This case study discusses the increas

    Jan 1, 2019

  • DFI
    Deep Foundations for the Bangkok MRT Chaloem Ratchamongkhon Line Metro Project

    By Peter A. Thompson, Richard E. Prust

    "The Bangkok Mass Rapid Transit (MRT} Chaleom Ratchamongkhon Line project is the first underground subway to be completed in Thailand. It consists of 22 km (14 miles) of twin-bored tunnels and 18 cut

    Jan 1, 2005

  • DFI
    Vertical Load Sharing of Piled Raft with Grid-Form Deep Mixing Walls

    By J. Hamada, K. Yamashita, Y. Shigeno, T. Tanikawa

    "This paper offers a case history of piled raft foundation in soft ground supporting a twelve-story building in Tokyo. To increase bearing capacity of the soft soil as well as a countermeasure of liqu

    Jan 1, 2015

  • DFI
    New Wembley National Soccer Stadium, London Piled Foundations: Design, Construction and Logistics

    By Max Gwynn, Tony Suckling

    "The new Wembley Stadium is the most spectacular soccer stadium in the world, built to the highest specifications, using the latest technology and offering visitors an unrivalled match-day experience.

    Jan 1, 2008

  • DFI
    Virginia Route 340 Bridges: Challenges in Karst Terrain

    By Chaz Weaver, James Sheahan, Michael Mo

    "The Virginia Department of Transportation (VDOT) undertook a program to replace four bridges along approximately 4 mi (6.4 km) of US 340 in Northwest Virginia. Two of these bridges, which span Compto

    Jan 1, 2017

  • DFI
    An Alternative Pile Technology

    By Rimas Veitas, James Panton, Erich Steinlechner

    "Ductile Iron Piles (DIPs) are a proven, viable alternative to conventional piles, and for the past five years have been successfully used throughout New England. The installation process of DIPs lend

    Jan 1, 2017

  • DFI
    Unconventional Solutions For Construction Of A Hybrid Cut-Off Wall At The Dead Sea

    By Karsten Beekhaus, Sander W. Odijk, Rabea Bahlum, Mazin Adnan, Ayman Abdelh Al Nuaimat, Hassan Farhat

    The Arab Potash Company, APC, is one of the 10 largest potash producers of the world. The solar ponds at the Dead Sea, used for the enrichment of the salt content in the brine, are of crucial importan

    May 1, 2022

  • DFI
    Testing Foundations for Major Minnesota Bridges

    By Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "Over the last 10 years, the Minnesota Department of Transportation (Mn/DOT) has had a very active program of replacing many major bridges, large structures spanning the Mississippi River. The deep fo

    Jan 1, 2013

  • DFI
    Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling

    By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior

    A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • DFI
    Finite Element Aided Design Method for Frozen Earth Shaft Support

    By Joseph A. Sopko

    The first documented procedures for designing frozen earth structures are over 50 years old, implemented long before the introduction of the Finite Element Method (FEM). Since that time, the developme

    Jan 1, 2019

  • DFI
    Excavation Techniques For Underground Drinking Water Pipe Line With Micro Piles As A Special Application

    By Andhra Pradesh, Nagarajkumar B. V

    As a part of Mumbai City Mega Drinking Water Project at Amar Mahal Tunnel-1 Ghatkopar East Mumbai, drinking water tunnels were proposed by MCGM from Amar Mahal to Trombay reservoirs, Amar Mahal to Wad

    Sep 1, 2022

  • DFI
    Pile Design Using Cpt Results: The “Lpc Method”

    By Frederic A. Verheyde

    The CPT pile design method of the ‘Laboratoire des Ponts et Chaussées’ (LPC) uses the cone resistance (qc) for the design of axially loaded piles. It was originally proposed in 1982 and was revised in

    Nov 1, 2022

  • DFI
    Providing External Confinement to Precast Prestressed Pile Shafts to Improve Ductility - ·Experimental Observations

    By Andrew Budek

    "Analytical and experimental work has shown that achieving the full inelastic lateral capacity of a pile may require the formation of a plastic hinge below ground level, in the pile shaft. The confini

    Jan 1, 2005

  • DFI
    Estimation Of Maximum Unit Side Resistance In Drilled Shaft Foundations From Partially Mobilized Load-displacement Data

    By Ramin Motamed, Anna Panorska``, Joseph A. W. Toth

    In this study, a dataset of 145 bi-directional and static load tests was used to evaluate the load-displacement response with respect to unit side resistance for drilled shafts comprising fully and pa

  • DFI
    Construction of Cooling Water Intake Shafts for the Oak Creek Expansion Project, Oak Creek, Wisconsin

    By Edward Jacobsen

    The Oak Creek Power Plant in Oak Creek, Wisconsin is currently undertaking an expansion project. In order to supply cooling water to this facility, a 27' (8.2m) diameter tunnel will be bored, in

    May 11, 2007

  • DFI
    Author index

    Abouleid,A.F.327 Ajdic, I.451 Albert, L.F. 221,307 Alem, A. 525 Asama, T. 431 Avgherinos, P. J. 373 Baker Jr, C.N. 331 Balossi Restelli, A. 171 Beckwith,G.H.33 Bellini, A. 469 Ber

    Jan 1, 1994

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    Load and Resistance Factor Design – Past, Present and Future

    By Silas C. Nichols, Jennifer E. Nicks

    "Limit states design (LSD), or load and resistance factor design (LRFD), is a method to account for the uncertainty in loads and resistance through a reliability calibration that requires all applicab

    Jan 1, 2015