Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Constraint Model: A Continuous Improvement Tool to Debottleneck Vertically Integrated Mining and Metallurgical Operations

    By A. Khan

    The purpose of this paper is to demonstrate the value of identifying and optimizing throughput constraints by utilizing a Constraint Model. This will be achieved by first understanding the overall con

    Aug 1, 2013

  • CIM
    Barrick Goldstrike Roaster Facility Dry Grinding and Leach

    By Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen

    "The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the

    Jan 1, 2001

  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • CIM
    A Heuristic for Fugitive Emissions Management

    By A. M. S. Hussein, B. E. Rogers

    Progressively more stringent emission limits and advances in regulations and enforcement have made air compliance more difficult for metallurgical facilities. This has historically required improved c

    Jan 1, 2015

  • CIM
    Evaluation of the Efficiency of Several Airborne Electromagnetic Systems: Exploration Implications

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, K. Fountain

    "A comparison of data from INPUT, GEOTEM, and MEGATEM airborne electromagnetic (AEM) systems over the Aldermac deposit, Québec, Canada, was undertaken to evaluate the relative ef¬ficiency of these sys

    Jan 1, 2009

  • CIM
    Experimental Electric Smelting of Manganese Ores

    By R. A. Campbell

    The electric smelting of five lowgrade Canadian manganese ores has been investigated at the Mines Branch, Department of Mines and Technical Surveys, Ottawa. Ferromanganese, silkomanganese, and spiegel

    Jan 1, 1956

  • CIM
    A Review of the Proposed Changes in the Alberta Mines Act

    By George Kellock

    Introductory The Alberta Provincial Government has contemplated a revision of the Mines Act for some time past, and it is understood that a definite decision has now been made to do this at the nex

    Jan 1, 1929

  • CIM
    Major Reduction of the Environmental Footprint in Concentrate Drying

    By J. Talja

    "Non-ferrous metal concentrates contain typically 7 – 12% water when received at the smelter. Removal of this water prior to smelting is always economically feasible because unnecessary heating of vap

    Jan 1, 2012

  • CIM
    A Theoretical Approach to the Evaluation of In-Situ Coal

    By K. W. Edwards

    The formulation of a theoretical basis for the evaluation of in-situ coal through the use of geophysical logs is outlined. This involved the development of an approach to the interpretation of resisti

    Jan 1, 1978

  • CIM
    Management of Copper Solvent Extraction Plants Running At Reduced Throughput

    By D. Kachongo, Y. Cheng, A. Kashala, D. Samal, G. Mitshabu

    Many copper processing flowsheets in the Democratic Republic of Congo include the leaching of oxide ores containing copper and cobalt, copper solvent extraction, copper electrowinning, and precipitati

    Jan 1, 2019

  • CIM
    Goldstream Concentrator Design and Operation

    By Stuart McTavish

    "Noranda's Goldstream mine is a 1,500 ton per day copper-zinc mine located 60 miles north of Revelstoke, B.C.The orebody which contains 3.69% Cu and 2.69% Zn was discovered in 1972. Construction of th

    Jan 1, 1985

  • CIM
    Drift prospecting for gold in saskatchewan - use of heavy mineral concentrates in tills

    By S. Averill, B. Schreiner, V. Sopuck

    The La Ronge. Kisseynew, Glennie Lake and Flin Flon domains. the main focu for gold exploration in the southeast part of the Saskatchewan Shield, were subject to continental glacial ice advances from

    Jan 1, 1986

  • CIM
    Emergency Egress/Ventilation Raise Innovations in Directional Raise Boring & Remote Shotcrete Application

    By Eric Schraml

    Wardrop Engineering and the Placer Dome?s Campbell Mine Design Team utilized leading edge directional raise boring techniques and an innovative, remote controlled application of steel fibre reinforced

    May 1, 2002

  • CIM
    Formability Improvment for AZ31 Magnesium Alloy Rolled at Wide Range of Rolling Speed and Reductions COM 2014 - 53rd Annual Conference of Metallurgists

    By H. Utsunomiya, J. Su, K. S. Tamimi, S. Yue, M. Sanjari, L. Kestens, Hara, A. S. Kabir, R. Petrov

    Manufacturing of thin sheet is difficult in industries. Some approaches, such as small-draft multi-pass rolling, intermediate annealing, isothermal rolling and high-speed rolling were proposed to over

    Jan 1, 2014

  • CIM
    Dust Research 1n West Germany

    By T S. Cochrane

    This paper is based on observations made during a recent visit by the writer to three of the dust research laboratories .in West Germany, each .of which is mainly concerned with studymg the compositio

    Jan 1, 1964

  • CIM
    Safety Phases in Mechanized Mining in the State of Washing ton

    By S. H. Ash

    No single factor in modern civilization has played a more important part in the lives of our people than mechanization in industry and to it civilization owes much of its progress. In no industry has

    Jan 1, 1937

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    Investigation of Block Geometrical Properties of the Shale-Limestone Chaotic Complex bimrock of The Santa Barbara Open Pit Mine (Italy)

    By N. Coli

    The exhausted Santa Barbara open pit mine (Tuscany, Italy), owned by the main electric power company in Italy (ENEL S.p.A,) extracted lignite as a fuel for the Santa Barbara thermoelectric power plant

    May 1, 2009

  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • CIM
    Western Mines- Myra, Lynx and Price deposits

    By R. H. Seraphim

    "Western Mines Limited produces gold, silver, copper, lead and zinc from a number of Paleozoic volcanogenic deposits near Buttle Lake on Vancouver Island. The deposits were emplaced along a series of

    Jan 1, 1980