Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The Electrification Nos. 12 and 20 of Three Large Hoists at Collieries, Dominion Coal Company, Limited

    By J. A. Russell

    AS THE LOCAL electric generating plants increased in size and capacity and costs of producing electricity came down, it became apparent that it was no longer good economy to operate individual boiler

    Jan 1, 1958

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    Footwall anchoring at Smoky River Coal Limited

    By Peter L. Sheehan, David A. Fawcett, Dennis C. Martin

    "Smoky River Coal Limited has successfully completed a major program involving the pattern rock anchoring of a high, steeply dipping footwall slope. The slope dips at approximately 65 to 70 degrees to

    Jan 1, 1988

  • CIM
    Mineral-potential Assessment by Consistency-driven Pairwise Comparisons

    By Waldemar W. Koczkodaj, William O. MacKasey

    Abstract - A consistency-driven pairwise comparisons method for mineral potential assessment is presented, using a simplified case of volcanic-associated massive sulfide type deposits as an example. G

    Jan 1, 1997

  • CIM
    Mineral-potential Assessment by Consistency-driven Pairwise Comparisons (2bc87143-d633-40e3-8191-14dd0bf10841)

    By Waldemar W. Koczkodaj, William O. MacKasey

    A consistency-driven pairwise comparisons method for mineral potential assessment is presented, using a simpli?ed case of volcanic-associated massive sul?de type deposits as an example. Geological, ge

    Jan 1, 1997

  • CIM
    Industrial relations

    By Riggin P. R.

    "IntroductionIndustrial Relations combines two very important relationships - employee relations and union relations.Employee relations always come into play when people are hired to perform tasks. Be

    Jan 1, 1989

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Selective flotation of sphalerite from Pb-Zn ore without copper activation

    By M. Leroux, S. R. Rao, J. A. Finch

    "Poor Pb-Zn selectivity during Pb flotation in laboratory tests on a Mississippi Valley-type Pb-Zn ore was traced to apH effect. In the pH range, 9.5 to 11.0 sphalerite floated readily without copper

    Jan 1, 1987

  • CIM
    Airway Velocity “Rules Of Thumb” More Guidelines than Hard and Fast Rules

    By R. Viljoen, K. Manns

    "The mining industry instinctively follows rule-of-thumb design velocities often based on very simplistic theoretical “economic velocity” optimization calculations to determine airway sizes. Although

    Jan 1, 2019

  • CIM
    British Columbia Industrial and Non-Metallic Minerais

    By A. M. Richmond

    Introduction The apparent commonplace, and prosaic, nature of building-stones, lime, cement, gypsum, and clay products, and many other miscellaneous non-metallic minerals, such as abrasives, barite,

    Jan 1, 1935

  • CIM
    The Preservation of Wood

    By R. D. Prettie

    Wood preservation may be defined as the art of protecting wood from decay. In its broadest sense, however, it includes a much wider field. It might be more properly de-fined as the art of protecting w

    Jan 1, 1926

  • CIM
    Chapter 8. The Farm-In/Joint Venture Agreement

    By Karl J. C. Harries

    "8.1. INTRODUCTIONThe purpose of this chapter is not to provide precedents or examples of provisions, but rather to offer some comments that may be worth considering in the negotiation or review of an

    Jan 1, 2003

  • CIM
    Petrology of the Mechanic Settlement Pluton and Related Platinum-Group Element Mineralization

    By A. Dogan Paktunc

    Abstract - The Mechanic Settlement pluton is a small body of mafic and ultramafic rocks of tholeiitic affinity, occurring in the Late Neoproterozoic volcanosedimentary rocks of the Avalon terrane of t

    Jan 1, 2000

  • CIM
    Quality Control of Assay Data: A Review of Procedures for Measuring and Monitoring Precision and Accuracy

    By M. Abzalov

    "Control of analytical data quality is usually referred to in the mining industry as Quality Assurance and Quality Control (QAQC), and involves the monitoring of sample quality and quantification of a

    Jan 1, 2008

  • CIM
    The economics of diamond projects in the Canadian Arctic (bbedb282-085a-4c62-8fa2-4245fef0430a)

    By W. Bullen

    A hypothetical economic model has been developed for diamond projects in the Canadian Arctic using data from recent exploration and mining projects. The model reflects economic conditions applicable t

    Jan 1, 2006

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    Mine reconciliation ? for better or worse!

    By Rayleen Riske

    Why do we look for better reconciliation when times get tough? Why wait? Mine reconciliation should be a priority throughout the good times too. In fact, with good reconciliation, those good times are

    May 1, 2010

  • CIM
    UNIMAX SD100 Depressant - A Cyanide Replacement

    By T. Schmidt, J. Merza

    "This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse

    Jan 1, 1992