Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Gas Analysis - Linking the Laboratory with Reality

    By D Cliff

    Despite advances in technology, the Australian underground coal mining industry continues to have incidents involving spontaneous combustion. Managing these incidents relies heavily on understanding t

    Jul 1, 2013

  • AUSIMM
    The Ore-Coke Interface-Mixed Ore Results

    By Boehme PW, Gregory OR

    The results presented here show quite definitely that in the system investigated the intensity of dispersion is enhanced by switching the flow entry from bottom to sides of the packed trough. Since

    Jan 1, 1975

  • AUSIMM
    The Role of Rock Fabric in Controlling Crushing Strength: Numerical Experiments

    A series of numerical experiments were performed in order to define the fracture strength of schistose rock during crushing. Fracture strength was shown to decrease as the fabric aligned with the pr

    Jan 1, 1993

  • AUSIMM
    Current Capabilities for Finite Element Analysis of Geomechanics and Structural Support Systems in Underground Mining

    By Ho D, Yang J

    The ready availability of powerful desktop workstations, which combine 3D real-time graphics and processing speed better than that of supercomputers of a few years ago, now allows the cost-effectiv

    Jan 1, 1995

  • AUSIMM
    Dump Leach Operation at Wiluna Western Australia

    General Gold was discovered in quartz veins at Wiluna in 1896, and the first lode was discovered in 1904. Since 1896, some 2.5 million ounces of gold have been produced from the Wiluna area. The min

    Jan 1, 1994

  • AUSIMM
    Grade Control Techniques at Paddington Gold Mine

    By Amos QG

    The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan

    Jan 1, 1986

  • AUSIMM
    Operation at Blackwater Mine

    The Blackwater Coal Mine is a modern open cut operation using large draglines for over- :)urden removal and shovels, loaders and trucks to mine and haul coal to the crushing and coal ?reparation pla

    Jan 1, 1974

  • AUSIMM
    The Design and Construction of the Excavation for the Hoppers Crossing Pump Wells

    By Nichol R

    - PART A The Hoppers Crossing Pumping Station is one of the principal components of the Western Trunk Sewer Project which replaces the 90 year old Main Outfall Sewer and will convey 60% of Melbour

    Jan 1, 1987

  • AUSIMM
    Deformation of Retreat Gatroad in Interpanel-Pillar System

    By Ichinose M, Tsuru T, Gotoh K

    Since 1980, the Department of Mining Engineering at Kyushu University, in co-operation with the Ikeshima Colliery, Matsushima Coal Mining Co. Ltd., has been conducting a research project into longw

    Jan 1, 1992

  • AUSIMM
    Grey River Gold Dredge Project (741941c7-6f5a-4b3a-ab98-8729f3fd3abc)

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989.Previous drilling indicated over 100 million cubic metres of gravels with some 90% of the gold in the bott

    Jan 1, 1990

  • AUSIMM
    A Simple Method of Calculating Grouted Rock Bolts

    By Yu-Jun Z

    According to site measurement and labora- tory experiment, the authors suggest a new mathematical model of grouted rock bolts. The rock bolt is taken as an elastic bar, and the grout is substituted

    Jan 1, 1987

  • AUSIMM
    The Bau Gold District -- East Malaysia

    The Bau Goldfield lies in the southwestern corner of Sarawak in East Malaysia. Evidence of past mining in the form of open pits and adits can be found over an area of 250 sq kin, centred on the townsh

    Jan 1, 1997

  • AUSIMM
    Sampling Practice at Prestea Goldfields Ltd of Ghana

    By Baafi EY, Appiah HK

    The Prestea Goldfields Ltd of Ghana, West Africa has produced over 170 t of gold with average grade of 11 g/t since 1912. The deposits occur in a wide shear zone which closely follow the Birimian-Tark

    Jan 1, 1976

  • AUSIMM
    Electrorefining of Pyrometallurgical Zinc ù A Potential Industrial Process?

    Zinc produced by pyrometallurgical processing techniques suffers the disadvantage of restricted market potential because of its impurity contents, typically lead and cadmium. Market zinc to the Specia

    Jan 1, 2000

  • AUSIMM
    Continuous Improvement at a Large Open Pit Operation

    One of the more recent developments within the mining industry has been the adoption of formal continuous improvement programs. A continuous improvement (CI) program was launched across Kalgoorlie Con

    Jan 1, 2004

  • AUSIMM
    Operational Aspects of Mine Development at Porgerain the Highlands of Papua Guinea

    By Radmuller H

    The proposed underground mine at Porgera forms an integral part of the Porgera Joint Venture project in Enga Province in the remote Highlands of Papua New Guinea. The total in-situ reserves are a

    Jan 1, 1988

  • AUSIMM
    A design and construction methodology for deep mine development

    By E Villaescusa, C Drover

    The stability of access tunnels is one of the main engineering challenges in deep underground mine construction. Many underground hard rock mining operations are now reaching depths where the induced

    Nov 29, 2022

  • AUSIMM
    Assessment of Ground Conditions for Pre-Stripping with Bucket Wheel Excavator

    By Ellery B. I

    Field investigations recently undertaken by Utah Development Company (U.D.C.) have been developed to allow the assessment of ground conditions relevant to the use of large bucket wheel excavators f

    Jan 1, 1981

  • AUSIMM
    Seam Gas Drainage as a Means of Outburst Control

    Outbursts of coal and gas are coupled both in their nature and mechanism and take place under varied sets of physical and geological conditions. The main interacting factors are geology and seam st

    Jan 1, 1980

  • AUSIMM
    Computer Assisted Modelling of Narrow, Elongate Gold Deposits for Resource Estimation and Mine Planning

    By Ward C. W

    Conventional polygonal and block modelling techniques inadequately represent the grade-thickness distribution of some narrow shear and stratabound gold deposits. The polygonal influence of high-grad

    Jan 1, 1997