Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Hydrotransportation of Raw Coal from Pit Face to Washplant

    By Crawford J

    The paper asks the question 'Why Limit the HYDROTRANSPORT of material to the confines of your washplant'.A brief historical review of widely accepted slurry transport operation establishes t

    Jan 1, 1992

  • AUSIMM
    The Cannington Silver Lead Zinc Deposit - at Feasibility

    By M T Roche

    The Cannington deposit is one of the largest accumulations of silver-lead known. Located 135 km southeast of Cloncurry in North West Queensland (Figure 1), Australia, the deposit is currently in th

    Jan 1, 1994

  • AUSIMM
    Improvements in Blast Fragmentation Using Measurement While Drilling Parameters

    An experienced drill operator is able to make a log of a drill hole defining physical properties of the earth such as hardness or structure as they vary with depth. This log is based on intuition or h

    Jan 1, 2001

  • AUSIMM
    Reconciliation at the Musselwhite Mine - From Exploration to Production

    The Musselwhite mine, located in northwestern Ontario, Canada, has been an underground narrow-vein gold producer since the spring of 1997. As an exploration project at the feasibility stage, much effo

    Jan 1, 2002

  • AUSIMM
    Norseman to Norwich Park - The Human Element

    Although technology and circumstances are in a constant state of change, the principles of managing the human element remain constant. The isolated mining community continues to form the backbone o

    Jan 1, 1980

  • AUSIMM
    Predicting the Benefit of Gravity Recovery Prior to Flotation

    Batch centrifugal gravity concentrators have become standard equipment in gold grinding circuits for recovery of gravity recoverable gold (GRG). The downstream benefits of installing a gravity circuit

    Aug 1, 2010

  • AUSIMM
    Jones-Wilkins-Lee Parameters for Civil Explosives

    By R Castedo, P Segarra, L M. López, J A. Sanchidrián, A P. Santos

    The cylinder test allows us to determine the expansion of a copper cylinder by the detonation of an explosive charge inside. This test, originally designed for military explosives, has been adapted fo

    Aug 24, 2015

  • AUSIMM
    The National Geochemical Survey of Australia - Aims and Strategy

    A new national-scale geochemical survey is under way inAustralia with the aim to provide energy and mineral explorers with state-of-the-art precompetitive data and information about the continentÆs po

    Jan 1, 2008

  • AUSIMM
    Displacement Within the Tasman Fold Belt: Paleomagnetic Indications?

    Late Palaeozoic and Late Mesozoic phases of widespread overprinting have obliterated most of the primary magnetization signature of the Tasman Fold Belt. Palaeomagnetic programs of a regional ext

    Jan 1, 1987

  • AUSIMM
    Safety Limitations of Longwall Face Advance Rates

    Improvements in mechanisation should not be considered independently of safety and of environmental hazards. The need to keep gas contents within statutory limits may make the time needed to partia

    Jan 1, 1988

  • AUSIMM
    The Development of a Continuous Copper Drossing Process for Lead Bullion (e832ca00-fad1-4d25-a701-ac8072a9e7d1)

    The first stage in the refining of lead blast furnace bullion is the removal of copper and is normally done as a batch process in open kettles.A number of attempts have been made to establish continuo

    Jan 1, 1963

  • AUSIMM
    The Use of Explosives in Steel Works

    IN presenting the following short paper the writer hopes to illustrate some uses of explosives in industrial work under conditions different to those prevailing on mining fields. This paper is based o

    Jan 1, 1921

  • AUSIMM
    The Application of High Pressure Water to Shearer Loaders

    The patented "Epytensic" pump of Minnovation Ltd, a multiple piston pump, is used widely on shearer loaders and by partial high pressure watcr jet cutting strategically in relation to cutter picks not

    Jan 1, 1991

  • AUSIMM
    Challenges in achieving zero harm – lessons from past incidents in mining

    By K M. Cook, D Clark

    Fatality prevention and zero harm are key focus areas for resource companies. However, they remain an ongoing challenge for high hazard industries, including the mining sector. As one example the late

    Apr 16, 2024

  • AUSIMM
    An innovative application of LJC Automatic Magnetic Flotation Separator in magnetite processing

    By L Ding, B Xu, C Wang

    In this paper, we introduce the term ‘LJC’ to refer to the LJC Automatic Magnetic Flotation Separator, which is an advanced technology developed by Longi Magnet, integrating various techniques such as

    Sep 18, 2023

  • AUSIMM
    The Influence of Rock Mass Quality in Controlled Blasting

    The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dynamic forces to which the excavation can be subjected and sustain damage. Though each speci

    Jan 1, 2003

  • AUSIMM
    Mineralogy Controlling Metallurgy at Ernest Henry Mining Revisited

    By S Strohmayr, R Harvey, A See

    Ernest Henry Mining Pty Ltd started production in August 1997. The Ernest Henry orebody consists of two distinct parts, a complex supergene ore zone overlying a primary ore zone. The economic copper m

    Jan 1, 2003

  • AUSIMM
    Improving Blasting Outcomes Using SoftLOAD<sup>«</sup> Low-Density Explosives

    Sasol Roche Blasting Services (SRBS) and its former owners have been in the process of developing and utilising low-density explosives over the last ten years. Many blasts have been fired in varying s

    Jan 1, 2004

  • AUSIMM
    New Non-Cyanide Technology for Processing Massive Copper-Zinc Ores

    By T Ye Koltunova an, L A. Otrozhdyonnova

    This paper presents the results of studies on the development of an efficient non-cyanide technology for processing massive, finely disseminated, copper-zinc ores of the Urals deposits. Copper is main

    Jan 1, 2005

  • AUSIMM
    The Porphyry Gold Mine, W.A. From Prediction to Production

    The Porphyry Gold Mine (150km NE of Kalgoorlie) was reopened in November 1983 with production commencing in April 1984. Original reserves quoted for the open pit were 822000 tonnes at 5.2 g/t Au based

    Jan 1, 1986