Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume HighwayBy S J. Clarke, C S. Walker
The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de
Sep 17, 2014
-
A New Algorithm for Stope Boundary OptimisationBy E Topal
Stopes are used in several underground mining methods. Boundary determination of these stopes is generally based on simple rules of thumb. While several stope boundary optimisation techniques are avai
Jan 1, 2009
-
Open Pit Mine Slope Engineering: A 2002 PerspectiveIn most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre
Jan 1, 2002
-
Effects of Melt Composition on the Interactions of Sinter Melt on a Natural Iron Ore SubstrateBy S Hapugoda, J R. Manuel, M P. Ma, L Lu
Iron ore sinter quality depends heavily on the mineralogy, textures and physical structure of the sinter, which is formed upon solidification of the primary sinter melt. The interactions of the initia
Aug 12, 2013
-
Mixed Media Grinding - A Refractory Gold Case StudyBy C Bartle
In many operations the use of less electrochemically reactive grinding media in the first grinding stage (for example, rod milling and high aspect ratio SAG milling) is rarely considered. Therefore, i
Jan 1, 2008
-
Supergene Enrichment of the Khanong Copper Resource, Sepon Project, Lao PDRThe Khanong supergene-enriched copper resource, (~23 Mt at 3.0 per cent Cu), is one of several resources recently discovered in the intrusive-centred, sediment-hosted Au-Cu Sepon mineral field located
Jan 1, 1999
-
Predicting and modelling Bond Work Index using chemistry (as a proxy for mineralogy)By K Gardner, R Fraval, V Singh
Using new technology to create optimised infill drill programs in underground or open pit settings, it is possible to quantify the value of a drill program. The computer designed programs are optimise
Mar 22, 2022
-
Kinetics of Collector Adsorption on Mineral SurfacesBy A Holmgren, W Forsling
In the present study infrared attenuated total reflection (IR-ATR) was used to monitor the rate of in situ adsorption of heptyl xanthate on a layer of zinc sulfide synthesised on a germanium ATR cryst
Jan 1, 2005
-
Land Reclamation at WaihiOne of the most significant problems experienced in land reclamation work has been the tendency of earthmovers to over-compact the subsoils and topsoils. The need for extensive subsoil drainage, becau
Jan 1, 1991
-
Study on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite OreStudy on the New Flow Sheet and Wastewater Recycling for Xiaoliuguo Copper-Bearing Low-Grade Scheelite Ore
Sep 13, 2010
-
A Cellular Automata-based Run-off Model and its Application in Mined Land Rehabilitation DesignsBy D Weatherley, T Baumgartl, L Huang, Q Shao
The stabilities of rehabilitated landforms are often threatened by the altered surface hydrology, especially the excessive surface run-off, which may cause severe water erosion and associated pollutan
Jul 16, 2014
-
Downstream impacts of Grade Engineering and preconcentrationBy J Salaya, J Kwak, L Keeney, S Dehkhoda
In addition to volatile commodity prices influencing decision making, in recent years, social and environmental performance have become important decision drivers within the mining industry. There are
Nov 10, 2020
-
Rapid and reliable flow property testing – a modified uniaxial approachBy K Williams, W Chen, J Miller
The flow function of an iron ore material governs its flowability characteristics in material handling chains within the resource industry. A uniaxial compression test is able to obtain a flow functio
Jul 24, 2017
-
Python Underground Processing Plant Critical DesignPython Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has
Sep 13, 2010
-
The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smeltingBy A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat
The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para
Aug 21, 2024
-
Hydrothermal Alteration in the Gladstone Hilliow-Suifidation Epithermal Area, Waihi, New ZealandBy J L. Mauk
Gladstone Hill, a volcanic-hosted low-sulfidation epithermal prospect in the Coromandel Peninsula, is less than 1 km from the world-class Martha Hill Au-Ag deposit. Gold-silver-bearing quartz veins oc
Jan 1, 2001
-
Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, QueenslandBy J Robinson, D Herbert
Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat
Jan 1, 1998
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Geotechnical Investigation of the South Wall, Mt Whaleback Pit a Case Study - How Goetechnology can Pay its WayBy Parker RJ, Swindells CF
The authors have used the geotechnical study for design of the South Wall of Mt. Newman Mining's Mt. Whaleback Mine to illustrate how geotechnical studies can be economically justified. This
Jan 1, 1986
-
Mining û Pied Piper for Pastoralism?This paper highlights the agricultural sector's primary concerns with mining in New Zealand: the information gap, land rehabilitation and compensation. It suggests how these issues can be resolve
Jan 1, 1981