Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
The Treatment Of Copper Ores And Concentrates With Nitrogen Species Catalyzed Pressure LeachingBy C. G. Anderson
Today, with a stringent economic and environmental climate prevailing in the copper business, there is increased interest in evaluating new processing alternatives for production. Hydrometallurgical p
Jan 1, 2001
-
A New Diaphragm Wall Technology Providing Mechanical And Watertightenss ContinuityBy P. Dupeuble
Diaphragm walls, owing to their method of construction are discontinuous structures. A new technology for the construction of joints between panels has been developed. This new process allows for the
Jan 1, 2010
-
Leaching/flotation processing of complex sulphide oresBy Franciszek Letowski
"Recovery of precious metals associated with a sulphidic matrix has an important economic effect on complex sulphide ore treatment. Because a significant portion of the silver and gold associated with
Jan 1, 1987
-
OFR-10-72 A Mathematical Model Simulating Flow Of Methane And Water In Coal ? IntroductionBy H. S. Price
This report discusses the development of a mathematical model that describes the flow of methane only and methane and water in a coal bed during mining operations. Because of the complex geometry, bou
Jan 1, 2012
-
RI 6145 Low-Temperature Phase Equilibria Of Helium-Bearing Natural Gases: Hansford GasBy Lowell Stroud
This report is the third in a series presenting equilibrium vapor-liquid data for helium-bearing natural gases. The first two reports contained phase data for the gases processed for helium at the Bur
Jan 1, 1963
-
RI 5638 Producing Nickel-Bearing Iron From Cuban Ores In A Batch Rotary Kiln - SummaryBy Warren M. Mahan
A rotary kiln process was developed by the Federal Bureau of Mines to produce consistently an iron product containing 3 to 7 percent nickel. Cuban laterite and serpentine ores were smelted in a gas-fi
Jan 1, 1960
-
Alternative Contracting MethodsBy John Reilly
Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),
Jan 1, 2007
-
RI 7141 Entrained-Bed Carbonization Of Highly Fluid Bituminous CoalsBy Manuel Gomez
Bituminous coals having maximum fluidity values in the 40- to 25,400-dial-divisions-per-minute (ddpm) range were carbonized in a continuous, entrained-bed reactor. Carbonization was conducted in an 8-
Jan 1, 1968
-
Suppliers Show Off Latest in Mining Technology at SME ExhibitBy Georgene Renner, William R. Yernberg, Steve Kral
Agapito Associates (AAI) provides consulting services in geo-engineering, mining engineering and related disciplines. Founded in 1978, the firm operates out of offices in Grand Junction, CO, Golden, C
Jan 1, 2006
-
Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP LoaderBy S. Thorley
In engineering design of operator?s compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi
Jan 1, 2006
-
Recent Operation Of The Flash Smelting Furnace At Saganoseki SmelterBy Yushiro Hirai
Saganoseki smelter & refinery had operated two flash smelting furnaces from 1973, attaining 330,000 mtpy of copper production in 1989. In 1996, however, it carried out a "integration of two flash furn
Jan 1, 1999
-
OFR-156-83 Diesel Engines In Underground Mining: A Bibliography With AbstractsBy Robert W. Waytulonis
This publication contains 1,000 citations of technical and semi-technical literature treating diesel-powered equipment usage underground both generally and specifically. These citations were gathered
Jan 1, 1983
-
Coal - Hazards Encountered in Mining Thick, Inclined Coal BedsBy E. C. Olsen
This paper describes the unusual hazardous conditions encountered in mining thick, inclined coal beds under heavy cover in Carbon County, Utah. This description includes heavy roof conditions, sloughi
Jan 1, 1963
-
Geotechnical Factors Affecting Coal Recovery in the Maramarua, Mokau, and Ohinewai DepositsBy B W. Riddol1s
The 1983 Energy Plan calls for an increase in North Island coal production from both underground and opencast sources from the 1982/1983 production of 843 000 tpa to approximately 3.4 Mtpa within the
Jan 1, 1984
-
North Mine Practice in Underground Points and CrossingsIN a mine with any considerable output the economical handling and transport of ore underground is a matter of prime importance, and in the design or lay-out of a trucking system the question of what
Jan 1, 1915
-
Testing Stemming Performance, Possible Or Not? - SynopsisBy D. Boshoff
The ability of an explosive to break rock is influenced considerably by the extent of confinement in the blasthole. It is believed that confinement is improved by the use of adequate stemming. The aim
Jan 1, 2011
-
Requisites And Methodologies For Developing Leadership And Management CapabilitiesBy L. M. Dyer
Various attempts have been made to build leadership and management expertise with little success. There are numerous reasons these attempts have failed. Three reasons, along with suggested solutions,
Jan 1, 2000
-
Fast Track Reactivation -Jacobina MineMine Evaluation Engineering , Operational and Social evaluation. Focus is on what opportunities are available. Social ??History ??Past Management Practices ??Community / Available labor force Mi
May 1, 2006
-
-
RI 2637 Some Features of Ventilating Fans At 164 Coal and Metal MinesBy D. Harrington, M. W. Von Bernewitz
"Introduction In studying the mine disaster files of the Bureau of Mires for preparation of a bulletin on coal-mine explosions, a table was compiled covering various features of fan installations and
Sep 1, 1924