Search Documents

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • IIMP
    Análisis geotécnico numérico de taludes altos de minería

    By Luis Martín Tejada

    Para la evaluación de la estabilidad de taludes en minería superficial se utilizan diferentes métodos de modelamiento y planeamiento como el de simulación numérica. En ese sentido, el presente texto d

    Sep 9, 2007

  • AUSIMM
    The Effect of Particle Size on the Activation and Flotation of Sphalerite

    By Kelsall D. F, Trahar W. J

    The size by size batch flotation behaviour of copper activated sphalerite from synthetic mixtures with quartz was determined. In terms of recovery of sphalerite, the size fractions could be grouped in

    Jan 1, 1975

  • SME
    SME Research Forum - Mining Technology and Research Needs – Chemical Products Suppliers’ Perspective

    The minerals industry consumes billions of dollars in raw materials, equipment, tools, services and chemicals. The industry, though, has turned overmuch of the research and development (R&D) for thes

    Jan 1, 2000

  • NIOSH
    OFR-115(1)-78 Study Of Mine Fires And Mine Ventilation - Part I - Computer Simulation Of Ventilation Systems Under The Influence Of Mine Fires - Summary

    By Rudolf E. Greuer

    The existing computer programs for the simulation of ventilation systems under normal ventilation conditions are reviewed and a suitable program for including the influence of mine fires is selected.

    Jan 1, 2011

  • NIOSH
    OFR-94-92 RCRA Regulation Impact On Alaska Mineral Development Tailings Management

    By M. John Brodie

    This report reviews the regulatory environment as it pertains to tailings management and disposal from mining operations, excluding coal and placer gold operations, in the state of Alaska. It is based

    Jan 1, 1992

  • AUSIMM
    The Development and Future Significance of Non-Destructive Testing of Winder Ropes in Australia

    The need to hoist increasing loads from great depths is leading to the more general adoption of winders of the Koepe and Blair types. The trend has introduced a number of new problems in winding ropes

    Jan 1, 1967

  • SAIMM
    Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And Limitations

    By Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju

    High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe

    Jan 1, 2007

  • SME
    Economic Decision-Making For Methane Drainage Systems For Underground Coal Mines – Preprint 97-157

    By J. M. Mutmansky, A. Wang

    This paper defines the elements of a basic economic model for decision-making when considering a methane drainage system for an underground coal mine. A drainage system will require significant capita

    Feb 24, 1997

  • DFI
  • NIOSH
    Comparison Of Ore Pass Computer Simulations For Designs Against Dynamic Load

    By K. Biswas, S. Iverson, S. J. Jung

    Computer modeling of rock flow in ore passes is being investigated and compared using MSC Soft-ware’s Working Model 2D1 (WM2D) and Itasca Corp.’s Particle Flow Code in Two Dimensions (PFC2D). This wo

  • DFI
    Minimising The Environmental Impact Of Construction Dewatering

    By Peter Jackson

    The dewatering of the large construction pits required for major infrastructure projects often has a significant impact on the environment. This is particularly so in urban areas and where groundwater

    Jan 1, 2000

  • NIOSH
    IC 8846 Pumped-Slurry Backfilling Of Abandoned Coal Mine Workings For Subsidence Control At Rock Springs, Wyo. - With An Appen On Hydraulic Model Studies For Backfilling Mine Cavities By E. J. Carlson, U.S. Bureau Of Reclamation, Denver. Colo.

    By G. J. Colaizzi

    The Bureau of Mines, at the request of local authorities in Rock Springs, Wyo., investigated and conducted through contracts a multistage program of exploratory drilling and pumped-slurry backfilling

    Jan 1, 1980

  • AUSIMM
    Project Management in China - Sino GoldÆs Story

    By C Johnstone

    Project management is not a task to be undertaken lightly. Mining projects generally present even more challenges due to ChinaÆs remoteness and complexity. Having experiences in project management in

    Jan 1, 2009

  • CIM
    Benchmarking Red Dog Ores using Modal Analysis and its Correlation with Observed Metallurgy

    By David Lin

    "Modal data from Red Dog Main Pit ores were collected and analysed on a size-by-size basis. The Main Pit data were compared to data from composite samples of Red Dog Aqqaluk ores. The data revealed th

    Jan 1, 2002

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • AUSIMM
    Discovery of Uranium Mineralization in the Manyingee Channel, Onslow Region of Western Australia

    By Morabito J, Harrop D. W

    Uranium exploration was commenced in 1973 and carried out at a regional scale over a wide area of the northern part of the Camarvon Basin of Western Australia by Minatome Australia Pty Limited and the

    Jan 1, 1981

  • AUSIMM
    Deformation of Single Crystals of Lead Part II - Orientation of Crystals of Fractured Creep Specimens Part II

    The first part (lH of this work dealt with the process of recrystallization of single crystals of lead after deformation by creep, as revealed by macroscopical examination. It was shown that when recr

    Jan 1, 1940

  • AUSIMM
    Management of Hydrogeological Risk in Tunnelling Projects

    A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf

    Jan 1, 2008

  • AUSIMM
    Some Factors Affecting the Behaviour of Lead During and Subsequent to Deformation by Rolling and Pressing

    During the course of the major research in the Metallurgy Department of the University of Melbourne into the creep characteristics of lead and .its dilute alloys, it has been the practice to prepare t

    Jan 1, 1940