Search Documents

  • NIOSH
    OFR-130-78 Time Resolved Audio Dosimeter System

    By Gordon R. Sima

    This contract is concerned with the construction of a Time Resolved Audio Dosimeter System consisting of one readout unit and several dosimeter units. The Time Resolved Audio Dosimeter System was desi

    Jan 1, 1977

  • AUSIMM
    Supervisory Control of Bass Strait Oil and Gas Production (450e3b8f-9404-4d30-9400-edb9f950a46d)

    Esso-BHP have installed a production supervisory control system that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station.

    Jan 1, 1971

  • SME
    Leica Dozer 2000 At The San Miguel Lignite Mine: The Uses Of GPS Grade Control In Surface Mining

    By M. Heger

    February 2, 1999 marks a milestone in earth-moving technology at the San Miguel Lignite Mine. It was on that date that The North American Coal Corporation (NAC) took delivery of three Leica Dozer 200

    Jan 1, 2002

  • SME
    Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United States

    The prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining

    Jan 7, 2020

  • CIM
    Post Start-Up Modifications to the Golden Bear Roaster

    By S. McCalpine, W. Muir, P. J. Downey

    "Golden Bear Operating Company Ltd. (GBOC) was a joint venture between Chevron Minerals Ltd. and North American Metals Corp. that was formed for the development of the Golden Bear Project. The mine is

    Jan 1, 1992

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME
    Framework For Stochastic Modeling Of Dragline Energy Efficiency

    By M. A. Oskouei

    Draglines are the main energy consumers in strip mines. Given the growing cost of energy and environmental concerns, it is important to properly understand dragline energy efficiency. The goal of curr

    Feb 27, 2013

  • AUSIMM
    Increased Rolling Mill Capacity at Kwinana and Newcastle

    The large increase in secondary industries in this country, during the war and post war periods, has caused a shortage of capacity for the production of merchant bar.To overcome this shortage, an expa

    Jan 1, 1957

  • AUSIMM
    Investigating the Sensitivity of Different Estimation Techniques over Block Dimensions

    It cannot be said that accurate and reliable ore reserve estimation is the fundamental of any mining operation success. Estimation techniques which are used to estimate the grade distribution of an or

    Dec 6, 2010

  • AUSIMM
    An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel Caves

    By P Duplancic and C R Lilley, R Hudson, D Beck

    For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff

    May 9, 2016

  • SAIMM
    Sawability Prediction Of Carbonate Rocks From Brittleness Indexes

    By O. Gunaydin

    Performance measurements of large-diameter circular saws were conducted on eight different carbonate rocks in marble factories located in some areas of Turkey. Rock samples were collected from these f

    Jan 1, 2004

  • AUSIMM
    Barrow Island Development Drilling-The Application of Experience, Equipment and Techniques to Achieve Maximum Economy

    The commercial development of the shallow (2200 ft2 400 ft) Windalia sand reservoir at Barrow Island provided the opportunity to conduct an intensive drilling programme using equipment and techniques

    Jan 1, 1968

  • SME
    Mining By Computer – Is It Really the Way of the Future?

    By Badiozamani Khosrow

    Introduction The mining industry has been using computers since the late 1950s. Despite this early start, the use of mine planning software is not a common practice in many operations. But the trend

    Jan 9, 1984

  • DFI
    The World In Steel Sheet Piling ? Synopsis

    By M. Dondelinger

    This paper presents a comprehensive review of steel sheet piling including internationally manufactured hot rolled sections, their history, applications, installation and driving techniques. The di

    Jan 1, 2010

  • AUSIMM
    Some Side û Lights on the Prospecting Programme of Bendigo Mines Ltd. And its Subsidiaries

    By Morgan W. M

    It is not the primary object of this paper to treat with the scheme of prospecting in detail, but it is considered that a brief description of the broad lines is necessary so that the significance of

    Jan 1, 1936

  • DFI
    Numerical Analysis Of Load Bearing Capacity Of Drilled Shafts With Defects

    By Khamis Y. Haramy

    Quality assurance and quality control of drilled shafts has become a concern due to difficulties in accurately locating construction anomalies and determining load bearing capacity of defected drilled

    Jan 1, 2007

  • AIME
    Industrial Minerals - Solution Extraction of Salt Using Wells Connected by Hydraulic Fracture

    By W. C. Peters, M. W. Pullen, C. A. Bays

    During the past three and a half years considerable improvement in the techniques of solution extraction of salt has been made by the use of wells which are cross-connected by hydraulic fracture at th

    Jan 1, 1961

  • SAIMM
    Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis

    By M. du Plessis

    This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar

    Jan 1, 2011

  • AUSIMM
    Dipmeter Interpretation of Intra-Latrobe Group Fluvial Sand Bodies, Basker/manta Block, Gippsland Basin

    By Rayner B

    Five wells have been drilled in the Basker/Manta Block of VIC/P19, Gippsland Basin, resulting in sub-economic Intra-Latrobe Group oil and gas discoveries at Basker-1 and Manta-1. A total of 21 indiv

    Jan 1, 1992

  • NIOSH
    OFR-120-78 Improved Fire Protection System For Underground Fueling Areas - Volume I

    By B. C. Christensen

    The contract objectives are (1) to develop safe practice guidelines which will minimize the chance of fires in underground fueling areas and (2) to develop a low-cost, reliable, automatic fire protect

    Jan 1, 1977